• Title/Summary/Keyword: Technical feasibility

Search Result 487, Processing Time 0.027 seconds

A Study on Feasibility Analysis and Alternatives for Infrared Detector Development (적외선 검출기 개발가능성 및 대안 분석 연구)

  • Kim, Gyeong-Su;Min, Seong-Gi;Kim, Cheol-Hwan
    • 시스템엔지니어링워크숍
    • /
    • s.4
    • /
    • pp.123-134
    • /
    • 2004
  • This paper deals with the feasibility analysis and alternatives for infrared detector development. The purpose of this paper analyze development requirement and feasibility study in both technology and cost. We get raw input data for system engineering process from development and technical expert, and then analyze cost and technology for development feasibility, and alternative study. Infrared Detector is core component of Thermal Imaging System and developed by ADD from 2006 to 2008 year. Technical level is analyzed by TRL(Technical Readiness Level) and AOA(Analysis of Alternative) is done by development and production cost estimate. We use SEER-H tool for cost estimate, that is parametric cost estimate tool based on Knowledge Base. Also this paper presents risk analysis for project management because it is necessary to risk driver management during the infrared detector development. The result of IR Detector feasibility and alternative study will be used in technical and cost analysis. This study can help those who are related to the cost analysis and development feasibility of other weapons

  • PDF

A Study of Feasibility Study on Construction a Public Library (공공도서관 건립 타당성 조사에 관한 연구)

  • Lee, Sang-Bok
    • Journal of Korean Library and Information Science Society
    • /
    • v.35 no.4
    • /
    • pp.491-516
    • /
    • 2004
  • The purpose of this study is to analyze the approach of economic feasibility and political and technical feasibility in the construction of a new public library. The results show that the cost-benefit analysis using in economic feasibility have the problems of benefit counting and discount rate, and also political and technical feasibility have the problems of wrong use in the rationalization of construction project. The result of this study is expected to be useful in preparing the feasibility study.

  • PDF

A New Model on Integration of Feasibility Estimates for Designing FEIT System in R & D Project (R & D 프로잭트의 Feasibility 추정 시스템설계를 위한 추정치 종합화 모형의 구축)

  • 권철신
    • Journal of the Korean Operations Research and Management Science Society
    • /
    • v.15 no.1
    • /
    • pp.47-61
    • /
    • 1990
  • The purpose of this study is to construct a new model named Communication Consensus Value Weighted (CCVW) model based on inter-personal technical communication within a project team, and to design Feasibility Estimates Integrated Terminal System (FEITS) which is a subsystem of R & D Project Planning System/System Alternatives Feasibility Estimation System (RDPPL/SAFES) using the model as a key function for feasibility estimation in that system. This new model aims to integrate technical feasibility estimated by several estimators in the lowest level as the project work breakdown structure which is the indentical conception of a terminal system in RDPPL. The process to obtain the feasibility estimate integrated is presented in this paper.

  • PDF

Conceptual Design and Technical Feasibility Analysis of an All-in-one Attachment Based Steel Pipe Pile Cutting Robot (굴삭기 기반 강관말뚝 두부정리 및 절단 부위 핸들링 로봇의 개념디자인 및 기술적 타당성 분석)

  • Yeom, Dong Jun;Han, Jae Hyun;Jung, Eui Hyun;Kim, Young Suk
    • Journal of the Architectural Institute of Korea Structure & Construction
    • /
    • v.34 no.11
    • /
    • pp.45-54
    • /
    • 2018
  • The primary objective of this study is to develop a conceptual design of all-in-one attachment based steel pipe pile cutting robot that improves the conventional work in safety, quality, convenience and productivity. For this, the following research works are conducted sequentially; 1)literature review, 2)field investigation, 3)selection of element technology for conceptual design, 4)deduction of conceptual design and its work process, 5)technical feasibility analysis of the conceptual design and its work process. As a result, leveling laser and laser detector, plasma cutter, rotary grapple are selected as core technologies. Futhermore, a conceptual design and work process of an all-in-one attachment based steel pipe pile cutting robot are developed based on the core technologies. According to the technical feasibility analysis result, at least 76.8% of the respondents are selected positive answer about each device of the all-in-one attachment based steel pipe cutting robot. It is expected that the application range and impact on the construction industry will be enormous due to the increasing trend of the steel pipe pile market.

Technical Feasibility Study on the Biomimetic Drone for Inspection of Electric Power Lines (전력선로 점검용 생체모방형 드론에 관한 기술적 실현가능성 연구)

  • Park, Joon-Young;Lee, Jae-Kyung;Kim, Seok-Tae
    • KEPCO Journal on Electric Power and Energy
    • /
    • v.2 no.4
    • /
    • pp.543-548
    • /
    • 2016
  • Live-line maintenance for electric power lines is very dangerous because of their ultra-high voltage environments and the risks of falling from heights. Recently, drone technology has been spotlighted due to its maneuverability and stable controllability, and has been being applied to maintenance works in the electric power industry. This paper presents a new type of drone that can be transformable by introducing biomimetics to its mechanism and can run on an overhead ground wire as well as it can fly. Its technical feasibility was confirmed through experiments.

Contributions of Large-Industrial Enterprise to Demand-Side Management and Economic Analysis on Diffusion of Energy Efficiency Measures (산업체 전력다소비 설비의 수요관리 기여도 및 효율향상 보급에 대한 경제성 평가분석)

  • Kim, Seong-Cheol;Park, Jong-Jin
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.26 no.2
    • /
    • pp.18-26
    • /
    • 2012
  • Though electricity consumption amount in industry has been increased gradually, corresponding power supply show symptoms of marginal point. Importance of demand-side management from large-industries has also been raised. This paper deals with induction motor, which is one of representative examples of heavy electricity consumption utilities, to analyze potential technical capability, economic feasibility from consumers' viewpoint and demand-side management feasibility from nation-wide perspective. Nation-wide economic feasibility analysis was done through California test, which has been used as demand-side management evaluation model. This paper also describes limitation of existing high efficiency induction motor in terms of contribution to demand-side management and utilizes premium motor to calculate demand-side management contribution level and economic feasibility evaluation. Likewise, this paper emphasizes the efficiency improvement of induction motor and analyzes how much premium motor related technologies can contribute to demand-side management.

A Basic Technical Feasibility Study for Operation of Tilting Train in Conventional Railway(1) (틸팅차량 투입 기술적 타당성 기초연구(1))

  • 유원희;김남포;정우진;김경태
    • Proceedings of the KSR Conference
    • /
    • 2002.05a
    • /
    • pp.23-28
    • /
    • 2002
  • Recently the operation of tilting train is considered in order to speed up the conventional railway, The vehicle and track should be studied to operate the tilting train. In this study, the basic technical feasibility was studied in order to operate the tilting train in the specific line.

  • PDF

Technical Feasibility Study on Live-line Maintenance Robot System for Overhead Distribution Lines (가공 배전선로 활선 정비 로봇 시스템의 기술 타당성 검토)

  • Joon-Young, Park;Yoon-Geon, Lee;Young-Sik, Jang
    • KEPCO Journal on Electric Power and Energy
    • /
    • v.8 no.2
    • /
    • pp.49-53
    • /
    • 2022
  • The distribution live-line work method is an operation method of working in a state in which electricity flows through overhead distribution lines to minimize inconvenience to electric customers due to power failure. In June 2016, to strengthen the safety of electrical workers, Korea Electric Power Corporation announced that it would in principle abolish the rubber glove method, in which workers wore protective equipment such as rubber gloves and performed their maintenance work. In addition, KEPCO announced that it would develop a short-range live working method using smart sticks and an advanced live-line maintenance robot system where workers work without touching wires directly. This paper is a preliminary study for the development of the live-line maintenance robot system, and deals with the results of analyzing the technical feasibility of whether the live works performed by workers can be replaced by robots or not.

Technical Feasibility and Field Applicability Analysis of an All-in-one Attachment-based PHC Pile Head Cutting Robot (PHC 파일 원커팅 두부정리 자동화 로봇의 기술적 타당성 및 현장 적용성 분석)

  • Yeom, Dong-Jun;Kim, Jun-Sang;Kim, Young Suk
    • Korean Journal of Construction Engineering and Management
    • /
    • v.21 no.2
    • /
    • pp.98-106
    • /
    • 2020
  • Conventional method of PHC pile head cutting work has several challenges with regard to safety, convenience, productivity, and quality. To address such problems, a prototype of the all-in-one attachment-based PHC pile cutting robot is developed(Yeom, 2018). The Primary objective of this study are to develop a final prototype of all-in-one attachment-based PHC pile cutting robot and to analyze technical feasibility and field applicability of final prototype. According to the technical feasibility and field applicability analysis result, at least 74.2% of the respondents are selected positive answer about technical feasibility of the final prototype, at least 66.6% of the respondents are selected positive answer about field applicability of the final prototype. It is expected that when deployed onsite, the final prototype can not only increase the practical use but also improvement the work safety and productivity of work at the PHC pile head cutting job site.

세계의 측지 e-VLBI 기술의 개발방향

  • 김두환;이진우;곽영희;이원국
    • Proceedings of the Korean Society of Surveying, Geodesy, Photogrammetry, and Cartography Conference
    • /
    • 2004.11a
    • /
    • pp.55-60
    • /
    • 2004
  • We have peformed an investigation about the present geodetic VLBI observation problems and a study about the trend of technical development in the future. Especially, I will present the research results about the present status of the technical development and the feasibility for e-VLBI which is recently highlighted.

  • PDF