• Title/Summary/Keyword: Technical criteria

Search Result 641, Processing Time 0.025 seconds

Selecting optimized concrete structure by Analytic Hierarchy Process (AHP)

  • Ebrahimi, Morteza;Hedayat, Amir Ahmad;Fakhrabadi, Hamed
    • Computers and Concrete
    • /
    • v.22 no.3
    • /
    • pp.327-336
    • /
    • 2018
  • Increase in population and its daily increasing in our today society results in an increase in housing demand while traditional methods are not applicable. The project preparation and realization processes, based on theoretical and empirical studies, a creation of goods, services, and technologies, are the most important human activities. Selection of effective technological systems in construction is a complex multi-criteria decision-making task. Many decision-makers refuse innovations once faced with similar difficulties. Therefore, using modern materials and methods in this industry is necessary. Modern methods increase quality and construction speed in addition to decrease energy consumption and costs. One of the problems in the way of any project is selecting construction system compatible with the project needs and characteristics. In the present research, different concrete structures such as common reinforced concrete (RC) structure, prefabricated, Insulating Concrete Formwork (ICF), 3D Panel and Tunnel Concrete Formwork (TCF) for buildings with limited floors in Iran are studied and compared from the viewpoint of different criteria like cost, time, applicability and technical characteristics with industrialization approach. Therefore, some questionnaires filled out by construction industry experts in order to compare criteria and sub-criteria in addition to evaluation of optimized structural systems. Then, results of the questionnaires ranked by Analytic Hierarchy Process (AHP) and the most effective alternative selected. The AHP results show that 3D Panel system 36.5%, ICF 21.7%, TCF 19.03%, prefabricated system 13.3% and common RC system 9.3% are the most and the least efficient systems respectively.

A Study on the Budget Allocation to Public Health Programs Using Matrix Delphi Technique (매트릭스 구성 델파이법을 이용한 공공보건사업 예산배분 연구)

  • 장원기;정경래
    • Health Policy and Management
    • /
    • v.10 no.4
    • /
    • pp.99-115
    • /
    • 2000
  • This study was conducted to get a resonable set of budget allocation to public health programs. Matrix Delphi technique was used to obtain the logic of study results and eventually to form a human model which could predict opinion of professionals on budget allocation. Thirty-two professionals in academic and governmental area responded to Delphi survey. Questionnaire was developed using matrix formation, and the matrix was formed by 6 decision criteria on budget allocation and 26 public health programs. The decision criteria are as following: size of problem(morbidity), severity of problem, social equity, importance of prevention, technical feasibility and efficiency of programs. Severity of problem dropped out of the model because it had significant correlation with the size of problem. A total score of each program was obtained by weighting the relative importance of each criteria which also were given by survey respondents. These total scores indicate that the most important public health program is vaccination for infants and children in terms of budget allocation. Monitoring communicable diseases, mental health program, and anti-smoking program are the next. In addition, respondents were asked of the desirable budget size of each program. The result was rearranged by multiple regression model using the scores of each decision criteria. In this process, the current budget size of central government was provided to the respondents, and included in the model. h set of desirable budgets modified using tile model was obtained. Considering the current size of budget, tile results of the model is very different from that of the total score. Managing dementia is ranked the first. Health promotion program for the elderly, rehabilitation of the disabled and monitoring communicable diseases are the next. The need to increase the budget of vaccination for the infants and children was not found as so high. The matrix structure in Delphi survey gave us the precise basis to make optimal decision, and made it possible to develop an opinion predicting model. However the plentifulness and diversity of professional opinions were not fully obtained due to the limited number of decision criteria.

  • PDF

Overseas Design Introduction of Road Rehabilitation Project in Keshim~Faizabad, Afghanistan (아프가니스탄 케심-파이자베드간 도로복구사업 해외설계 사례)

  • Jeong, Dong-Ho;Kim, Woo-Sun;Kim, Gee-Baek;Jeong, Won-Joon;Lee, Seung-Woo
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2008.10a
    • /
    • pp.569-580
    • /
    • 2008
  • If slope height was more than 20 meters, we conducted an analysis of stereographic projection and limit equilibrium at this slope. We proposed reduction of slope face angle and reinforcement of rock bolt depending on analysis. Blasting design : Standard pattern based on result of local test blasting was made for blasting design. Vibration criterion was set for less than 3.0mm/s because of outworn buildings and inhabitants opinions. Production blasting and Controlled blasting has been done as Construction standard pattern. After Vibration Monitoring has been done, so that we can control of complement. "Bidding Document" and AASHTO 2001 "A Policy on Geometric Design of Highways and Streets" were so for design criteria of earthwork but they were different actual design criteria and left something to be desired in Afghanistan. Therefore, although "Bidding Document" and "AASHTO 2001" were basic design criteria, domestic design criteria was reflected in this design criteria for complement by discussion with supervisor. Drainage design : For stability ratio, ditch of arch block and stonework was designed by rainfall data for the 13 years and discussion with supervisor. Pavement was designed as flexible pavement. Because these days in Afghanistan postwar repair works, especially urgent repairing of roads and newly making of roads, are very highly in progress, I think that Afghanistan is the region about which our construction technical experts should have great concerns.

  • PDF

A Study on Practical Ways to Improve Pricing Criteria for Technical Service Contracts (기술용역 대가기준의 문제점 및 개선방안)

  • Lee, Taewon;Lee, Ghang
    • Korean Journal of Construction Engineering and Management
    • /
    • v.15 no.2
    • /
    • pp.33-43
    • /
    • 2014
  • Goods, services and construction works needed by central government entities, local government entities, and other public institutions are procured with national budget. For efficient budget execution, Article 9 Paragraph 1 of the Enforcement Decree of the Act on Contracts to Which the State is a Party (hereinafter "State Contract Act") provides for the criteria for determining estimated price. Sub-paragraph 2 of the paragraph provides for the "determination of estimated price by cost calculation". On this legal basis, pricing criteria for the determination of estimated price, based on the project purpose, are announced by responsible authorities. This study analyzes the pricing criteria for technology services and proposes a price calculation methodology that can ensure transparency, as a practical improvement for more rational and efficient budget execution in the public sector.

Development of a Korean roadmap for technical issue resolution for fission product behavior during severe accidents

  • Kim, Han-Chul;Ha, Kwang Soon;Kim, Sung Joong;Seo, Miro;Kang, Sang-Ho;Lee, Doo Yong;Song, Yong-Mann;Lee, Jongseong;Im, Hee-Jung;Cho, Chang-Sok;Yeon, Jei-Won;Kim, Sung Il;Cho, Song-Won;Song, Jinho;Ryu, Yong-Ho
    • Nuclear Engineering and Technology
    • /
    • v.49 no.8
    • /
    • pp.1575-1588
    • /
    • 2017
  • In order to develop a domestic research roadmap for severe accidents, a special committee was established by the Korean Nuclear Society. One of the subcommittees discussed the characteristics and the relevant technical issues in the stages of fission product release and physical forms of radionuclide release and transport. The group members developed a tree to identify fission product release phenomena by tracing failures of individual defense-in-depth barriers and added possible countermeasures against failure. For each elemental issue, they searched for technical problems by examining the phenomena, accident management actions, and regulatory aspects relevant to the mitigation features for containment, including mitigation strategies against containment bypass accidents. Regulatory concerns, including the source term and the acceptance criteria for radionuclide release, were also considered. They identified further research needs regarding important technical issues based on the degree of the current knowledge level in Korea and in foreign countries, looking at the significance and urgency of issues and the expected research period required to reach an advanced level of knowledge. As a result, the group identified the 12 most important and urgent issues, most of which were expected to require mid-term and long-term research periods.

Manufacturing of an All Composite Unmanned Aerial Vehicle (전기체 복합재 무인항공기 제작)

  • 김동민;허명규;강공진
    • Proceedings of the Korean Society For Composite Materials Conference
    • /
    • 2002.05a
    • /
    • pp.163-166
    • /
    • 2002
  • For the development of an all composite unmanned aerial vehicle (UAV), manufacturing consideration in design phase, works for composite parts fabrication, subassembly and final assembly are summarized. In design phase, to maximize the advantage of composite material, manufacturing processes such as cocuring, cobonding and secondary bonding are introduced. For the curing of designed parts, composite tools are designed and manufactured. Assembly jigs are designed to satisfy dimensional tolerance of the structure. Inspection criteria are established and applied to the manufacturing. Technical data about inspection items and methods are summarized as manufacturing specifications for the mass production of the UAV structure.

  • PDF

Evaluation of Surface Coating Materials of Concrete for Protection of Chloride Attack (염해방지를 위한 콘크리트 표면도장재료의 성능평가)

  • 정해문;유환구;이병덕;안태송;오병환
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2002.05a
    • /
    • pp.749-754
    • /
    • 2002
  • The safety and serviceability of concrete structures are influenced by corrosion of steel bars in concrete. Several methods have been available to protect the reinforcing bars from corrosion. Among them, the surface coating method is one of the easiest way to apply to concrete structures. However, the realistic guideline for surface coating materials has not been established yet in this country. In this study, in order to establish a reasonable technical guidelines which include the test method, quality criteria, and construction method, the performances of surface coating materials were evaluated.

  • PDF

Performance based Construction Specifications and Design Criteria Development Plan of Electrical Installations (전기설비분야 성능기준 개발 접근방법)

  • Kim, Se-Dong;Lee, Kwang-Sik;Choi, Eun-Hyeok
    • Proceedings of the KIEE Conference
    • /
    • 2007.11c
    • /
    • pp.117-118
    • /
    • 2007
  • 성능중심의 건설기준을 개발하고, 성능계약제도 도입방안을 구축함으로써 시설물의 성능을 향상시키고, 생애주기비용(LCC)을 절감하며, 설계 및 시공자의 기술개발을 유도하는 것이 필요하다. 본 연구에서는 건축전기설비분야의 성능기준 개념과 외국의 도입사례를 살펴보고, 성능기준 개발 대상 및 범위를 설정하고 성능 기준 개발을 위한 접근방법을 도출하였다. 앞으로 국제 경쟁력 확보를 위해서는 성능중심의 건설기술기준 적용이 필요하다.

  • PDF

A development on the inspection technologies for secondary electrical facilities in nuclear power plant (원전 2차측 전력설비 검사기술 개발)

  • Park, Hyun-Shin;Kim, Kern-Joong;Kim, Moon-Young
    • Proceedings of the KIEE Conference
    • /
    • 2005.11b
    • /
    • pp.110-112
    • /
    • 2005
  • Recently, the reactor trip in nuclear power plants has mostly occurred by the failure of secondary electrical facilities. Some kinds of technical standards or acceptable criteria are required to regulate those facilities. Therefore, in this paper the failures of secondary electrical facilities which cause reactor trip are analyzed, and the inspection technologies including guidelines for secondary electrical facilities are developed.

  • PDF

A Study of Information System Availability Guarantee Methods and Application

  • Kim, Hee Wan
    • International Journal of Advanced Culture Technology
    • /
    • v.8 no.3
    • /
    • pp.292-299
    • /
    • 2020
  • This paper presents an evaluation criteria of an information system availability for guaranteeing availability (service target level) from the perspective of the SLA contract and its technical point of view. In order to verify the effectiveness for information system failure and availability guarantee measures, three cases were examined. In summary, the failure time was reduced by 32% ~ 62% after applying the availability guarantee measure, verifying the excellence in the evaluation of an information system availability.