• Title/Summary/Keyword: Technical ROM

Search Result 26, Processing Time 0.017 seconds

A Study on the Evaluation Criteria for the Selection of Academic CD-ROM Products (CD-ROM 제품(製品) 선정을 위한 평가기준(評價基準))

  • Choi, Sang-Ki
    • Journal of Information Management
    • /
    • v.25 no.4
    • /
    • pp.36-55
    • /
    • 1994
  • This study discussed extensively the CD-ROM evaluation criteria that are necessary for library and information center to acquire the CD-ROM products. The evaluation criteria discussed in previous studies are divided into managerial and technical aspects, and especially the search software and user interface catagories in the technical aspect are investigated separately. Finally the basic checklist is suggested for the evaluation of CD-ROM product in appendix.

  • PDF

Improvement for Reservoir Operation Module of Flood Forecasting-Warning Systems in Han River (한강 홍수예경보시스템의 저수지 운영모듈 개선)

  • Kwon, Oh-Ig;Kim, Sung;Shim, Myung-Pil
    • Journal of Korea Water Resources Association
    • /
    • v.32 no.6
    • /
    • pp.685-695
    • /
    • 1999
  • On the premise of flood control procedure, flood forecasting-warning, system(FFWS) is one of actions for disaster prevention. It makes public announcements for flood situations timely in order to mitigate damage from floodings. Multi-purpose dam which has flood control storage plays an important role in river basin at flood time. In FFWS, it is reservoir operation module that is related to reservoir operation of multi-purpose dam. This study considers the current conditions and problems in reservoir operation module of FFWS in Han River and improves reservoir operation module under limited research scope. As results, additional reservoir operation modules such as Technical ROM(Reservoir Operation Method) and ARD(Approved Release Discharge) ROM were built in FFWS. Using these newly built reservoir operation modules. Han River Flood Control Office will plan and work for flood control and flood forecasting. Firstly, it may plan for flood control by Technical ROM which is deterministic simulation model, and work for final flood control and flood forecasting by ARD ROM according to approved release discharge afterward.

  • PDF

Development of Reservoir Operation Model using Simulation Technique in Flood Season(II) (모의기법에 의한 홍수기 저수지 운영 모형 개발(II))

  • Sing, Yong-Lo;Maeng, Sung-Jin;Ko, Ick-Hwan;Lee, Hwan-Ki
    • Journal of Korea Water Resources Association
    • /
    • v.35 no.6
    • /
    • pp.797-805
    • /
    • 2002
  • The EV ROM, a joint reservoir operation model for flood control that accounts for the downstream flow condition, has been introduced in the preceding article (Shin et al, 2000). A joint reservoir operation model computer program for the Geum river basin, developed by FORTRAN Power Station 4.0 using the EV ROM, is hereby presented. Three case studies of flood control by joint operation of the Yongdam and Daechung Multipurpose Dams in the Geum river basin revealed that the performance of the EV ROM was superior to the existing Rigid ROM and Technical ROM. This is because the EV ROM can account for the downstream flow condition as well as the upstream inflow and the reservoir water level. In order to apply for various floods events in the future, consistent improvement of the developed EV ROM and efforts for more accurate rainfall prediction are required.

Development of Reservoir Operation Model using Simulation Technique in Flood Season (I) (모의기법에 의한 홍수기 저수지 운영 모형 개발 (I))

  • Sin, Yong-No;Maeng, Seung-Jin;Go, Ik-Hwan;Lee, Hwan-Gi
    • Journal of Korea Water Resources Association
    • /
    • v.33 no.6
    • /
    • pp.745-755
    • /
    • 2000
  • The dam operation system of KOWACO for flood control doesn't have capability to account for the downstream hydrologic conditions and any feasible index to decide the pre-release from the forecasted rainfall and inflow. In this study, a dam operation model for flood control was developed to account for the flood flow condition of its downstream to give users the dam release schedules. Application test of EV ROM to Keum River showed that EV ROM is superior to the Rigid ROM and Technical ROM which are currently used by KOWACO. EV ROM developed in this study provides a release schedule accounting for the cumulative lateral flow hydrograph at the downstream control points where the discharge does not depend only on the dam operation. but also on lateral inflow from the tributaries. In order to reduce the peak discharge at the control points, it suggests the preliminary release during the early rising phase of the predicted hydrograph, holding the flood flow inside the dam during a peak phase, and afterward resuming the release. Three case studies of flood control by the operation of Daechung Multipurpose Dam in Geum River Basin show that the EV ROM is superior to the Rigid ROM and Technical ROM. This must be due to its nature to account for the downstream flow condition as well as the inflow and water level of the dam. It was also conceived that further case studies of EV ROM and more accurate rainfall prediction would improve the dam operation for flood control.ontrol.

  • PDF

Flood Control Operation of Soyang and Choongju Reservoirs by the Min-max DP (Min-Max DP에 의한 소양 및 충주호의 홍수조절운영)

  • 오영민;이길성
    • Water for future
    • /
    • v.19 no.4
    • /
    • pp.339-346
    • /
    • 1986
  • A real-time single reservoir operation model using the Min-max Dynamic Programming for the flood control of Soyanggang Dam and Choongju Dam is developed. The objective function is to minimize the maximum release from each dam and the constraints are those from ther reservoir and channel characteristics. Control and utilization efficiencies are used to measure the performance of the reservoir operation method (ROM). In comparison with those of simulation models(such as the Rigid ROM, the Technical ROM and the Linear Decision Rule), the efficiencies of the optimization model are superior for all return periods.

  • PDF

CD-ROM Development for '8051 Microprocessor' Unit Teaching-Learning in Electronics Circuit Practice Subject of Technical High School (공업계 고등학교 전자 회로 실습교과에서 '8051 마이크로프로세서' 단원의 교수-학습을 위한 CD-ROM 개발)

  • Kim Sung-Rae;Choi Jun-Seop;Chung Dong-Yang
    • Journal of Engineering Education Research
    • /
    • v.6 no.1
    • /
    • pp.22-31
    • /
    • 2003
  • The purpose of this study was to develop CD-ROM so that students can understand 8051 Microprocessor unit easily in electronics circuit practice subject of technical high school. The study gives students, who have difficulties in learning, a chance for self-directed and supplementary learning by suggesting interface process with 8051 Practice Kit. To achieve these purposes, literature survey, collecting textbooks and materials, development of CD-ROM were gradually carried out. Each steps were as follows: Firstly, in literature survey, concepts and characteristics of multimedia and application to class were reviewed. Secondly, text contents on 8051 Microprocessor unit were analyzed, main contents were extracted and graphic, sound, animation were made. It was consisted of eight basic learning subjects, and designed to flow systematically. In this study, we presented a kind of teaching-learning material by developing CD-ROM in 8051 microprocessor unit in electronics circuit practice subject as a central matter. This material will be able to help technical high school students in learning

Flood Stage Determination by Implicit Nymerical Technique (부정류 해석에 의한 금강하류부 홍수위결정)

  • 선우중호
    • Water for future
    • /
    • v.16 no.2
    • /
    • pp.123-129
    • /
    • 1983
  • One of the techniques to determine flood stages in natural channel is to find the solution of unsteady flow equations such as continuity and momentum equations. Since the exact analytic solution of these equations are not Known, the implicit numerical scheme is widely accepted tool for the approximate solution of equations. This technique is applied to the downstream of Daechung Dam in Geum River for the determination of flood stage for given frequency. However the flood stages are greatly affected by the method of reservoir Operation Method and Technical Operation Reservoir Method. Obviously, the Tech. ROM is found to be superior to Auto ROM.

  • PDF

Development of the Evaluation Checklists for Quality of Educational Softwares - CD-ROM titles and softwares on the internet - (교육용 소프트웨어 품질평가를 위한 평가지의 개발 -CD-ROM 타이틀과 인터넷 상의 소프트웨어를 중심으로-)

  • 차운옥;김명숙
    • Journal of Korean Society for Quality Management
    • /
    • v.25 no.2
    • /
    • pp.83-101
    • /
    • 1997
  • We have developed three evaluation checklists of educational softwares for users such as, learners, teachers and parents, not for the software develops or designers. This study has especially focused on CD-ROM titles and softwares on the internet. The followings were selected as the essential attributes that the educational softwares of high quality should possess : ease of use, technical support and interest of learning for learners, educational value and smartness for teachers, packaging integrity, investment value and childproof for parents. The evaluation checklists were developed on the basis of evaluation criteria which were concretion of the essential attributes. The validity of the evaluation checklists was supported by a theoretical study for the development of ckecklists and the actual development process. The interrater reliability and the retest reliability were confirmed by statistical methods. Thus, the developed checklists can be a useful tool to evaluate educational softwares. This study will contribute to improvement of the software quality and help users in selecting educational softwares.

  • PDF

Reservoir Operation at Flood Time by Transformed Reservoir Flood(TRF) Reservoir Operation Method(ROM) (저수지 홍수변환법에 의한 홍수시 저수지 운영)

  • Gwon, O-Ik;Sim, Myeong-Pil
    • Journal of Korea Water Resources Association
    • /
    • v.31 no.1
    • /
    • pp.105-113
    • /
    • 1998
  • Reservoir operation during flood period can be divided into two parts: One is for an operating policy during flood period to consider water conservation and flood control, and the other is for flood time on a random water level at flood forecasting, This study is concerned with reservoir operation and discusses general reservoir operation at flood time. Flood control has problems such as the uncertainty of hydrologic models. technical limitations and some constraints. Therefore, we may prepare the quantitative flood control methods based on the assured flood control storage for reservoir operation. Transformed Reservoir Flood(TRF) Reservoir Operation Method(ROM) is a procedure which determines the adequate releases with considering dam safety for flood inflows over non-damaging discharge. Based on the TRF ROM which was explained in our published paper. the study discusses the TRF ROM with additional investigations and the general reservoir operation rules at flood time.

  • PDF