Development of Reservoir Operation Model using Simulation Technique in Flood Season (I)

모의기법에 의한 홍수기 저수지 운영 모형 개발 (I)

  • Sin, Yong-No (Water Resources Research Center, Korea Water Resources Corporation) ;
  • Maeng, Seung-Jin (Water Resources Research Center, Korea Water Resources Corporation) ;
  • Go, Ik-Hwan (Water Resources Research Center, Korea Water Resources Corporation) ;
  • Lee, Hwan-Gi (Seoul Metropolitan Area Operation Center, Korea Water Research Corporation)
  • 신용노 (한국수자원공사 수자원연구소) ;
  • 맹승진 (한국수자원공사 수자원연구소) ;
  • 고익환 (한국수자원공사 수자원연구소) ;
  • 이환기 (한국수자원공사 수도권운영센터)
  • Published : 2000.12.01

Abstract

The dam operation system of KOWACO for flood control doesn't have capability to account for the downstream hydrologic conditions and any feasible index to decide the pre-release from the forecasted rainfall and inflow. In this study, a dam operation model for flood control was developed to account for the flood flow condition of its downstream to give users the dam release schedules. Application test of EV ROM to Keum River showed that EV ROM is superior to the Rigid ROM and Technical ROM which are currently used by KOWACO. EV ROM developed in this study provides a release schedule accounting for the cumulative lateral flow hydrograph at the downstream control points where the discharge does not depend only on the dam operation. but also on lateral inflow from the tributaries. In order to reduce the peak discharge at the control points, it suggests the preliminary release during the early rising phase of the predicted hydrograph, holding the flood flow inside the dam during a peak phase, and afterward resuming the release. Three case studies of flood control by the operation of Daechung Multipurpose Dam in Geum River Basin show that the EV ROM is superior to the Rigid ROM and Technical ROM. This must be due to its nature to account for the downstream flow condition as well as the inflow and water level of the dam. It was also conceived that further case studies of EV ROM and more accurate rainfall prediction would improve the dam operation for flood control.ontrol.

현재 우리나라에서 홍수조절 업무에 황용하고 있는 홍수관리시스템은 댐에서 조절이 불가능한 댐하류부 수문현상들을 고려하여 방류계획을 수립할 수 없으며, 예측 강우량에 의한 댐으로의 유출상황을 고려한 예비방류에 관한 지침이 마련되어 있지 않다. 따라서 본 연구에서는 댐의 제약조건 댐 상.하류의 유출상황을 고려하여 홍수기 댐을 운영 할 수 있는 모의기법에 의한 모형을 개발하였다. 개발된 모형(EV ROM이라 명명)은 댐에서 조절이 불가능한 댐하류 지류에 의한 하류 홍수제어 지점의 Cumulative Lateral Flow Hydrograph를 고려하여 방류계획을 수립한다. EV ROM에서는 댐하류 지역의 첨두홍수량 경감을 위하여 홍수제어지점의 수문곡선 상승부에서 예비방류를, 첨두부에서는 댐에 저류를 하였다가 수문곡선 하강부에 다시 방류를 수행하는 특징이 있다. EV ROM을 강우-유출모형에 결합하여 금강수계 대청댐을 중심으로 3개 홍수사상에 적용해 본 결과, 기존의 Rigid ROM이나 Technical ROM 보다 우수한 것으로 나타났다. 이는 본 연구에서 개발한 EV ROM이 댐 유역뿐만 아니라 댐하류 홍수제어지점의 수문상황을 동시에 고려하여 댐의 방류계열을 결정하기 때문이다. 따라서, 본 연구에서 개발된 EV ROM을 다양한 홍수사상에 적용, 예측강우량의 정확도 개선 및 프로그램의 보완이 이루어진다면, 현재보다 한차원 높아진 저수지운영을 기대 할 수 있을 것이다.

Keywords