• Title/Summary/Keyword: Task schedule

Search Result 149, Processing Time 0.03 seconds

A Hierarchical Solution Approach for Occupational Health and Safety Inspectors' Task Assignment Problem

  • Arikan, Feyzan;Sozen, Songul K.
    • Safety and Health at Work
    • /
    • v.12 no.2
    • /
    • pp.154-166
    • /
    • 2021
  • Background: Occupational health and safety (OHS) is a significant interest of all governments to prevent workplace hazards. Although appropriate legislation and regulations are essentials for the protection of workers, they are solely not enough. Application of them in practice should be secured by an efficient inspection system. Fundamental components of an inspection system are inspectors and their audit tasks. Maintaining the fair balanced task assignment among inspectors strictly enhances the efficiency of the overall system. Methods: This study proposes a two-phased goal programming approach for OHS inspectors' task assignments and presents a case study. Results: The solution approach gives the balanced assignment of inspectors to the workplaces in different cities of the country in the planning period. The obtained schedule takes into account the distances covered by the work places and the number of the workplaces' employees to be audited and pays attention to the human factors by considering the preferences of the inspectors. The comparisons between the obtained optimal schedule and the implemented one that is produced manually show that the approach not only maintains the technical requirements of the problem, but also provides social and physical balance to the task assignment. Conclusion: Both the approach and the application study are expected to offer fruitful inspirations in the area of safety management and policy and they provide a good guide for social policy and organizational aspects in the field of OHS inspectors' task assignment.

Scheduling Start-up Transient Periods of Dual Armed Cluster Tools (양팔 클러스터장비의 초기 전이 기간 스케줄링)

  • Hong, Kyeung-Hyo;Kim, Ja-Hee
    • Journal of the Korea Society for Simulation
    • /
    • v.24 no.3
    • /
    • pp.17-26
    • /
    • 2015
  • A cluster tool used in many kinds of semiconductor processes for improving the performance and the quality of wafers has a simple configuration, but its schedule is not easy because of its parallel processing module, a lack of intermediate buffers, and time constraints. While there have been many studies on its schedule, most of them have focused on full cycles in which identical work cycles are repeated under constant task times. In this research, we suggest strategies of start-up transient scheduling which satisfies time constraints and converges into a desirable steady schedule for full work cycle. The proposed schedules are expected robust under the stationary stochastic task times. Finally, we show that the strategies make schedules enters the desirable steady schedule and robust using the simulation.

The Efficacy of Visual Activity Schedule Intervention in Reducing Problem Behaviors in Children With Attention-Deficit/Hyperactivity Disorder Between the Age of 5 and 12 Years: A Systematic Review

  • Thomas, Naveena;Karuppali, Sudhin
    • Journal of the Korean Academy of Child and Adolescent Psychiatry
    • /
    • v.33 no.1
    • /
    • pp.2-15
    • /
    • 2022
  • Objectives: Children with attention-deficit/hyperactivity disorder (ADHD) tend to be noisy and violate rules with their disruptive behaviors, resulting in greater difficulties with off-task behaviors and being at risk for social refusal. The visual activity schedule (VAS) intervention program is a frequently used method to teach multiple skills involving on-task, use of schedules, transition behaviors, social initiation, independent play skills, classroom skills, and academic skills. The current systematic review aimed to examine the efficacy of using VAS intervention in reducing problem behaviors in children with ADHD between 5 and 12 years of age. Methods: Systematic searches were conducted using two electronic databases (PubMed and Scopus) to identify relevant studies published in English between 2010 and 2020. Four studies met the inclusion criteria: two studies examined the effect of schedule-based tasks and the use of an iPad on classroom skills, while the other two examined randomized clinical trials (RCTs) of psychosocial treatment for ADHD inattentive type and a cross-sectional study examined the impact of the group size on task behavior and work productivity in children with ADHD. Results: The findings indicate that the interventions used in all four studies could lead to increased satisfaction among participants and parents, as well as a reduction in problem behavior. In terms of the research indicators, the RCT had low quality, while the others were of high quality. Conclusion: A larger number of studies and the ADHD clinical population would help to increase the generalizability of future reviews of treatments in this context.

An open Scheduling Framework for QoS resource management in the Internet of Things

  • Jing, Weipeng;Miao, Qiucheng;Chen, Guangsheng
    • KSII Transactions on Internet and Information Systems (TIIS)
    • /
    • v.12 no.9
    • /
    • pp.4103-4121
    • /
    • 2018
  • Quality of Service (QoS) awareness is recognized as a key point for the success of Internet of Things (IOT).Realizing the full potential of the Internet of Things requires, a real-time task scheduling algorithm must be designed to meet the QoS need. In order to schedule tasks with diverse QoS requirements in cloud environment efficiently, we propose a task scheduling strategy based on dynamic priority and load balancing (DPLB) in this paper. The dynamic priority consisted of task value density and the urgency of the task execution, the priority is increased over time to insure that each task can be implemented in time. The scheduling decision variable is composed of time attractiveness considered earliest completion time (ECT) and load brightness considered load status information which by obtain from each virtual machine by topic-based publish/subscribe mechanism. Then sorting tasks by priority and first schedule the task with highest priority to the virtual machine in feasible VMs group which satisfy the QoS requirements of task with maximal. Finally, after this patch tasks are scheduled over, the task migration manager will start work to reduce the load balancing degree.The experimental results show that, compared with the Min-Min, Max-Min, WRR, GAs, and HBB-LB algorithm, the DPLB is more effective, it reduces the Makespan, balances the load of VMs, augments the success completed ratio of tasks before deadline and raises the profit of cloud service per second.

A Method for Schedule Simulation Considering Rework and Uncertainty (재작업과 불확실성을 고려한 일정 시뮬레이션 방법론)

  • Kim, Chan-Mook;Park, Young-Won
    • Journal of the Korean Society for Railway
    • /
    • v.12 no.1
    • /
    • pp.135-143
    • /
    • 2009
  • The majority of development projects fail to meet their target schedule and cost, with the overrun typically between 40 and 200 percent. These overruns happen because the planners underestimate the work or do not consider the need to rework at project planning. Representative schedule planning/management techniques such as Gantt Chart, PERT/CPM etc. that are used in domestic project planning are unable to reflect rework. This paper proposes a method to consider rework to provide more realistic estimates at schedule planning. Additionally, to prevent the underestimation of the work this paper proposes a simulation method that calculates a probabilistic estimated schedule and the associated variance based on the random variable modeling of individual task completion dates.

Work Management Model to Integrate Schedule and Bill of Quantit (산출내역서.공정 통합관리 모형 구축에 관한 연구)

  • 박홍태;박찬정
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2002.11a
    • /
    • pp.123-131
    • /
    • 2002
  • Recently our government operates earned value management system (EVMS) for improving work management system of the construction projects over specific scale. The EVMS is based on the integrated management between construction cost and schedule, the existing systems, however, are focused on the cost management by using wort quantity. This study suggests a work management mode1 to integrate construction cost with activity information. The model introduces a work task concept as a tool that can connect construction cost to activity information. The suggested model in this study is verified by using actual data for the applicability to practical construction projects.

  • PDF

Work Management Model to Integrate Schedule and Bill of Quantity (산출내역서.공정 통합관리 모형 구축에 관한 연구)

  • Park, Hong-Tae;Park, Chan-Jeong
    • Journal of the Korea Institute of Building Construction
    • /
    • v.2 no.4
    • /
    • pp.153-161
    • /
    • 2002
  • Recently our government operates earned value management system (EVMS) for improving work management system of the construction projects over specific scale. The EVMS is based on the integrated management between construction cost and schedule. the existing systems, however, are focused on the cost management by using work quantity. This study suggests a work management model to integrate construction cost with activity information. The model introduces a work task concept as a tool that can connect construction rest to activity information. The suggested model in this study is verified by using actual data for the applicability to practical construction projects.

Effects of Neurofeekback Training on EEG, Continuous Performance Task (CPT), and ADHD Symptoms in ADHD-prone College Students

  • Ryoo, ManHee;Son, ChongNak
    • Journal of Korean Academy of Nursing
    • /
    • v.45 no.6
    • /
    • pp.928-938
    • /
    • 2015
  • Purpose: This study explored the effects of neurofeedback training on Electroencephalogram (EEG), Continuous Performance Task (CPT) and ADHD symptoms in ADHD prone college students. Methods: Two hundred forty seven college students completed Korean Version of Conners' Adult ADHD Rating Scales (CAARS-K) and Korean Version of Beck Depression Inventory (K-BDI). The 16 participants who ranked in the top 25% of CAARS-K score and had 16 less of K-BDI score participated in this study. Among them, 8 participants who are fit for the research schedule were assigned to neurofeedback training group and 8 not fit for the research schedule to the control group. All participants completed Adult Attention Deficiency Questionnaire, CPT and EEG measurement at pretest. The neurofeedback group received 15 neurofeedback training sessions (5 weeks, 3 sessions per week). The control group did not receive any treatment. Four weeks after completion of the program, all participants completed CAARS-K, Adult Attention Deficiency Questionnaire, CPT and EEG measurement for post-test. Results: The neurofeedback group showed more significant improvement in EEG, CPT performance and ADHD symptoms than the control group. The improvements were maintained at follow up. Conclusion: Neurofeedback training adjusted abnormal EEG and was effective in improving objective and subjective ADHD symptoms in ADHD prone college students.

Minimum time path planning of robotic manipulator in drilling/spot welding tasks

  • Zhang, Qiang;Zhao, Ming-Yong
    • Journal of Computational Design and Engineering
    • /
    • v.3 no.2
    • /
    • pp.132-139
    • /
    • 2016
  • In this paper, a minimum time path planning strategy is proposed for multi points manufacturing problems in drilling/spot welding tasks. By optimizing the travelling schedule of the set points and the detailed transfer path between points, the minimum time manufacturing task is realized under fully utilizing the dynamic performance of robotic manipulator. According to the start-stop movement in drilling/spot welding task, the path planning problem can be converted into a traveling salesman problem (TSP) and a series of point to point minimum time transfer path planning problems. Cubic Hermite interpolation polynomial is used to parameterize the transfer path and then the path parameters are optimized to obtain minimum point to point transfer time. A new TSP with minimum time index is constructed by using point-point transfer time as the TSP parameter. The classical genetic algorithm (GA) is applied to obtain the optimal travelling schedule. Several minimum time drilling tasks of a 3-DOF robotic manipulator are used as examples to demonstrate the effectiveness of the proposed approach.