• Title/Summary/Keyword: TBM selection

Search Result 28, Processing Time 0.022 seconds

Selective Adsorption of Sulfur Compounds from Natural Gas Fuel Using Nanoporous Molecular Sieves (나노세공 분자체를 이용한 천연가스 연료로부터 황 화합물의 선택적 흡착)

  • Kim, Hoon-Sung;Chung, Jong-Kook;Lee, Seok-Hee;Cheon, Jae-Kee;Moon, Myung-Joon;Woo, Hee-Chul
    • Clean Technology
    • /
    • v.13 no.1 s.36
    • /
    • pp.64-71
    • /
    • 2007
  • The selection of a suitable adsorbent for removing organic sulfur compounds tetrahydrothiophene (THT) and t-butylmercaptan (TBM) from natural gas has been carried out. The saturation adsorption capacity for the sulfur compounds were determined by pulse adsorption method for a group of nanoporous materials, including Na-Y, Na-ZSM-5, Na,K-ET(A)S-10, Na-Mordenite, Na,K-Clinoptitolite, Ti/MCM-41, Ti/SBA-15 and amorphous titanosilicates. Among the materials tested, Na-Y and Na,K-ET(A)S-10 zeolites showed high adsorptive capacities for THT and TBM. The saturation capacity for THT on Na,K-ETS-10 was comparable with that on Na-Y zeolite, which is well known as an effective adsorbent. The capacity and adsorptivity for THT and TBM on Na,K-ETAS-10 were improved by an increase in crystallinity of Na,K-ETAS-10. An investigation of the competitive adsorption between THT and TBM from the breakthrough test using a simulated natural gas indicates that Na,K-ETS-10 selectively adsorbs THT. The breakthrough capacity for THT on Na,K-ETS-10 was 1.19 mmol/g. The results show that the high adsorption performance of Na.K-ETS-10 and Na,K-ETAS-10 is due to the highly exchanged cations in the zeolitic structure which exhibit the strong electrostatic interactions with organic sulfur compounds and their wide pore nature.

  • PDF

FE model of electrical resistivity survey for mixed ground prediction ahead of a TBM tunnel face

  • Kang, Minkyu;Kim, Soojin;Lee, JunHo;Choi, Hangseok
    • Geomechanics and Engineering
    • /
    • v.29 no.3
    • /
    • pp.301-310
    • /
    • 2022
  • Accurate prediction of mixed ground conditions ahead of a tunnel face is of vital importance for safe excavation using tunnel boring machines (TBMs). Previous studies have primarily focused on electrical resistivity surveys from the ground surface for geotechnical investigation. In this study, an FE (finite element) numerical model was developed to simulate electrical resistivity surveys for the prediction of risky mixed ground conditions in front of a tunnel face. The proposed FE model is validated by comparing with the apparent electrical resistivity values obtained from the analytical solution corresponding to a vertical fault on the ground surface (i.e., a simplified model). A series of parametric studies was performed with the FE model to analyze the effect of geological and sensor geometric conditions on the electrical resistivity survey. The parametric study revealed that the interface slope between two different ground formations affects the electrical resistivity measurements during TBM excavation. In addition, a large difference in electrical resistivity between two different ground formations represented the dramatic effect of the mixed ground conditions on the electrical resistivity values. The parametric studies of the electrode array showed that the proper selection of the electrode spacing and the location of the electrode array on the tunnel face of TBM is very important. Thus, it is concluded that the developed FE numerical model can successfully predict the presence of a mixed ground zone, which enables optimal management of potential risks.

The Selection and Abrasion Assessment of Cutter on Shield Tunnelling in Weathered Soil - Seoul Subway Line 7 Extension, Construction Lot 703 (풍화암 지반에서의 쉴드 TBM 커터도구 선정 및 마모량 평가 - 서울지하철 7호선연장 703공구 중심으로)

  • Kim, Yong-Il;Lee, Sang-Han;Jeong, Du-Seok;Im, Jong-Yun;Park, Gwang-Jun;Park, Jun-Su
    • Proceedings of the Korean Society for Rock Mechanics Conference
    • /
    • 2006.09a
    • /
    • pp.59-79
    • /
    • 2006
  • The successful execution of shield tunnelling depends on the cutting ability of cutter. So the selection of shape, size and material of cutter according to geology condition is important work. Since shield tunnelling method was first invented in 1881, the cutting tool for rock has been developed owing to various experiments and researches, the study for soil, however, is insufficient. This paper introduces the shield tunnelling that will be carried out on weathered rock section (920m) of Seoul Subway Line 7 Extension C703. The shape and the material of cutter are discussed required for execution without replacement of cutter tool as well as for advance of excavation efficiency. In addition the estimation method of cutter abrasion in case of excavation on weathered soil is proposed and verified. Specially, the coefficient of abrasion for different soil and cutter is proposed by means of investigation into construction example of foreign country.

  • PDF

Study on the Workability of Raise Boring Machine in Korea (국내 Raise Boring Machine의 굴착능력에 관한 연구)

  • 이석원;조만섭;배규진
    • Tunnel and Underground Space
    • /
    • v.13 no.3
    • /
    • pp.196-206
    • /
    • 2003
  • In order to investigate the workability of Raise Boring Machine(RBM) such as utilization, penetration rate and advance rate, a vertical shaft of 98 m in length and 3.05 m in diameter was constructed in the layer of conglomerate by using the RBM in this study. In addition, field data from tow different construction sites including water-pump power plant tunnel, roadway tunnel and mining tunnel by RBM were collected and analyzed. The results show that the average weekly bored length is 19.3 m and its average utilization is between 54.3 % and 75.1 % very higher than that of the TBM(Tunnel Boring Machine). It also turns out that the bit force increases linearly with respect to the increase of the RPM(revolution per minute) of RBM. However, the net penetration rate decreases with the increase of bit force, RPM of RBM and depth of shaft. The findings of this study can be used to provide the useful information for the design of shaft and the selection of RBM.

Prediction of TBM disc cutter wear based on field parameters regression analysis

  • Lei She;Yan-long Li;Chao Wang;She-rong Zhang;Sun-wen He;Wen-jie Liu;Min Du;Shi-min Li
    • Geomechanics and Engineering
    • /
    • v.35 no.6
    • /
    • pp.647-663
    • /
    • 2023
  • The investigation of the disc cutter wear prediction has an important guiding role in TBM equipment selection, project planning, and cost forecasting, especially when tunneling in a long-distance rock formations with high strength and high abrasivity. In this study, a comprehensive database of disc cutter wear data, geological properties, and tunneling parameters is obtained from a 1326 m excavated metro tunnel project in leptynite in Shenzhen, China. The failure forms and wear consumption of disc cutters on site are analyzed with emphasis. The results showed that 81% of disc cutters fail due to uniform wear, and other cutters are replaced owing to abnormal wear, especially flat wear of the cutter rings. In addition, it is found that there is a reasonable direct proportional relationship between the uniform wear rate (WR) and the installation radius (R), and the coefficient depends on geological characteristics and tunneling parameters. Thus, a preliminary prediction formula of the uniform wear rate, based on the installation radius of the cutterhead, was established. The correlation between some important geological properties (KV and UCS) along with some tunneling parameters (Fn and p) and wear rate was discussed using regression analysis methods, and several prediction models for uniform wear rate were developed. Compared with a single variable, the multivariable model shows better prediction ability, and 89% of WR can be accurately estimated. The prediction model has reliability and provides a practical tool for wear prediction of disc cutter under similar hard rock projects with similar geological conditions.

Simplified Failure Mechanism for the Prediction of Tunnel Crown and Excavation Front Displacements

  • Moghaddam, Rozbeh B.;Kim, Mintae
    • Magazine of korean Tunnelling and Underground Space Association
    • /
    • v.21 no.1
    • /
    • pp.101-112
    • /
    • 2019
  • This case study presented a simplified failure mechanism approach used as a preliminary deformation prediction for the Mexico City's metro system expansion. Because of the Mexico City's difficult subsoils, Line 12 project was considered one of the most challenging projects in Mexico. Mexico City's subsurface conditions can be described as a multilayered stratigraphy changing from soft high plastic clays to dense to very dense cemented sands. The Line 12 trajectory crossed all three main geotechnical Zones in Mexico City. Starting from to west of the City, Line 12 was projected to pass through very dense cemented sands corresponding to the Foothills zone changing to the Transition zone and finalizing in the Lake zone. Due to the change in the subsurface conditions, different constructions methods were implemented including the use of TBM (Tunnel Boring Machine), the NATM (New Austrian Tunneling Method), and cut-and-cover using braced Diaphragm walls for the underground section of the project. Preliminary crown and excavation front deformations were determined using a simplified failure mechanism prior to performing finite element modeling and analysis. Results showed corresponding deformations for the crown and the excavation front to be 3.5cm (1.4in) and 6cm (2.4in), respectively. Considering the complexity of Mexico City's difficult subsoil formation, construction method selection becomes a challenge to overcome. The use of a preliminary results in order to have a notion of possible deformations prior to advanced modeling and analysis could be beneficial and helpful to select possible construction procedures.

A study on the normal project duration development for the construction of multi-utility tunnel in the existing city (기존시가지의 공동구 건설을 위한 표준공기 산정에 대한 연구)

  • Lee, Seong-Won;Lee, Pil-Yoon;Byun, Yo-Seph;Cho, Choong-Yeun;Lee, Min-jae
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.19 no.12
    • /
    • pp.677-685
    • /
    • 2018
  • In construction, schedule management is the basic but important step, for the effective schedule management, the preparation of the reasonable schedule table should be prioritized. In the design stage, the optimal construction period can be selected through comparison of various conditions and construction methods considering weather conditions and site characteristics. But, At the planning phase, it is difficult to select the effective method and calculate the proper construction period by the basic data(D/B) analysis. In this paper, the construction method considering characteristics of each type and conditions of existing city was selected. For the reasonable duration calculation, we analyzed the unit schedule for RC method for open type and Shield TBM method for tunnel type. The normal project duration of construction assuming of 1,200m of extension and every 200m of ventilation was prepared by integrating each unit schedule. It was analyzed that it took 893 days for the open type and 616 days for the tunnel type. The results of this study will help to make type selection and normal project duration more easily in the planning phase. If it is linked to the design stage, it will be easy to estimate the process and construction cost.

Excavation Mechanism of Roadheader and Statistical Analysis of its Key Design Parameters Based on Database (로드헤더의 굴착 원리와 데이터베이스를 활용한 로드헤더 핵심 설계 항목의 통계분석)

  • Park, Young-Taek;Choi, Soon-Wook;Park, Jae-Hyun;Lee, Chul-Ho;Chang, Soo-Ho
    • Tunnel and Underground Space
    • /
    • v.23 no.5
    • /
    • pp.428-441
    • /
    • 2013
  • Nowadays, a roadheader as a mechanical excavator is in high demand, especially for mines under various conditions and tunnels where TBMs are inapplicable. However, the records of roadheaders in Korea are seldom reported. Moreover, the number of countries with their intrinsic design and manufacturing technologies of roadheaders is very limited. Therefore, this study aimed to analyse the excavation principles of roadheader as well as its key design parameters for its optimized selection and design. In addition, the database with 143 world-widely collected roadheader design data was built, and a few statistical correlations were derived from it. A schematic procedure for roadheader design based on the database was also proposed.