A Study on the Excavation Efficiency in Rock Mass Applied TBM Method (TBM공법을 적용한 암반현장에서의 굴착효율에 관한 연구)

  • Jeong, Hyeong-Sik;Lee, Seung-Ho;Park, Jong-Bae
    • Geotechnical Engineering
    • /
    • v.11 no.1
    • /
    • pp.51-62
    • /
    • 1995
  • The use of TBM has been rapidly increased in recent years since TBM has been introduced to Korea in 1985 and Korea came to occupy 27% of TBM holding ratio in the world. Despite a lot of experience, study on promoting the efficiency of TBM excavation is insufficient. The factors that influence the efficiency of excavation are the mechanical farttor geotechnical factor and management factor. The study on the efficiency of excavation has focused on the improvement of mechanical factor. But geotechnical factor is also very important and by this factor engineer can estimate the applicability of TBM. The purpose of this paper is to understand the effectiveness of TBM excavation for vari orts rock quality by analysing relations between rock quality and TBM excavation.

  • PDF

Tuna by-product meal as a dietary protein source replacing fishmeal in juvenile Korean rockfish Sebastes schlegeli

  • Kim, Kyoung-Duck;Jang, Ji Won;Kim, Kang-Woong;Lee, Bong-Joo;Hur, Sang Woo;Han, Hyon-Sob
    • Fisheries and Aquatic Sciences
    • /
    • v.21 no.8
    • /
    • pp.29.1-29.8
    • /
    • 2018
  • This study was conducted to evaluate the use of tuna by-product meal (TBM) as a substitute for fishmeal in juvenile Korean rockfish (Sebastes schlegeli) diets. Five isonitrogenous (52% crude protein) and isocaloric (4.9 kcal/g) diets were prepared. Control diet (Con) was formulated to contain brown fishmeal, whereas 25, 50, 75, and 100% of fishmeal was substituted with the same percentage of TBM in the TBM25, TBM50, TBM75, and TBM100 diets, respectively. Three replicate groups of fish (initial weight, $29.5{\pm}0.6g$) were fed one of the five diets for 12 weeks. The mean weight gain of fish fed the Con and TBM25 diets was significantly higher than that of fish fed the TBM100 diet (P < 0.05), but it was not significantly different from the weight gain of fish fed the TBM50 and TBM75 diets. The feed efficiency and protein efficiency ratios of fish fed the Con diet were significantly higher than those of fish fed the TBM100 diet (P < 0.05), but were not significantly different from those fed the TBM25, TBM50, and TBM75 diets. The TBM25, TBM50, TBM75, and TBM100 diets had significantly (P < 0.05) lower incidence cost and higher profit index than the Con diet. These results suggest that the tuna by-product meal used in this study could replace up to 75% of fishmeal protein in the diet without reducing growth and feed utilization in juvenile Korean rockfish weighing 29-53 g. By considering feed cost, the TBM 75 diet is recommendable for Korean rockfish farming.

Model test on operation efficiency in the screw conveyor of shiled TBM in soft ground (축소모형시험을 통한 연약지반 shield TBM의 screw conveyor 배토효율에 관한 연구)

  • Oh, Tae-Sang;Kim, Sang-Hwan;Kim, Won-Kyung;Lee, Hye-Yoon;Shin, Min-Ho
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.16 no.2
    • /
    • pp.203-211
    • /
    • 2014
  • This paper presents the screw conveyor operation efficiency of shield TBM in soft ground. In order to study the screw conveyor operation efficiency, the experimental and theoretical studies were carried out. In experimental study, the operating amounts of muck were examined and compared due to the screw conveyor operating parameters including types (Shaft and Ribbon screw), angles of screw and conveyor. The results obtained from the laboratory model tests were analysed and evaluated to suggest the most suitable muck operating parameters during the shield TBM tunnelling in soft ground. In conclusion, it is found the operation parameters to increase the screw conveyor efficiency. In addition, the information presented in this paper may be useful for developing the design technology of shield TBM in the future.

A Study on the Operation Development Method through the Application Results Large-Diameter Tunnel (대구경 터널공법 적용 사례분석을 통한 운영 개선방안)

  • Lee, Yang Kyu
    • Journal of the Society of Disaster Information
    • /
    • v.8 no.2
    • /
    • pp.108-118
    • /
    • 2012
  • The application of TBM tunneling has been progressively increased since the first entrance into korea in 1985. In order to an apprehension and operation development of TBM method which has excellent boring in hard rock tunnel, this study has analyzed mutual relation of lose time and TBM boring from actual construction results TBM tunneling. This study compared this analyzed results with TBM tunnelling construction results of korea, america, japan, analyzed a primary factor of TBM boring effect and suggested operation development method from the analyzed results. accordingly this study can be used an index when contract apply TBM method to planning steps.

A Study on the Operation Development Method through the Application Result TBM Tunneling in the Bard Rock (암반터널에서의 TBM 공법 적용 사례 분석을 통한 운영 개선 방안)

  • Song, Young-Sun;Choi, Jae-Jin;Park, Hong-Tae
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.9 no.4
    • /
    • pp.1050-1058
    • /
    • 2008
  • The application of TBM tunneling has been progressively increased since the first entrance into Korea in 1985. In order to an apprehension and operation development of TBM method which has excellent boring in hard rock tunnel, this study has analyzed mutual relation of lose time and TBM boring from actual construction result TBM tunneling. This study compared an analyzed result with TBM tunnelling construction results of Korea, America, Japan, analyzed a primary factor of TBM boring effect and suggested operation development method from the analyzed results. accordingly this study can be used an index when similar construction apply TBM method to planning steps.

A study on the soil conditioning behaviour according to mixing method in EPB shield TBM chamber (EPB 쉴드 TBM 챔버 내 혼합방법에 따른 배토상태거동에 대한 연구)

  • Kim, Yeon-Deok;Hwang, Beoung-Hyeon;Cho, Sung-Woo;Kim, Sang-Hwan
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.23 no.4
    • /
    • pp.233-252
    • /
    • 2021
  • This paper is a study to improve the efficiency of mixing technology in the shield TBM chamber. Currently, the number of construction cases using the TBM method is increasing in Korea. According to the increasing use of TBM method, research on TBM method such as Disc Cutter, Cutter bit, and Segment also shows an increasing trend. However, there is little research on the mixing efficiency in chamber and chamber. In order to improve the smooth soil treatment and the behavior of the excavated soil, a study was conducted on the change of the mixing efficiency according to the effective mixing bar arrangement in the chamber. In the scale model experiment, the ground was composed using plastic materials of different colors for ease of identification. In addition, the mixing bar arrangement was different and classified into 4 cases, and the particle size distribution was classified into single particle size and multiple particle size, and the experiment was conducted with a total of 8 cases. The rotation speed of the cutter head of all cases was the same as 5 RPM, and the experiment time was also carried out in the same condition, 1 minute and 30 seconds. In order to check the mixing efficiency, samples at the upper, middle (left or right), and lower positions of each case were collected and analyzed. As a result of the scaled-down model experiment, the mixing efficiency of Case 4 and Case 4-1 increased compared to Case 1 and Case 1-1, which are actually used. Accordingly, it is expected that the mixing efficiency can be increased by changing the arrangement of the mixing bar in the chamber, and it is considered to be effective in saving air as the mixing efficiency increases. Therefore, this study is considered to be an important indicator for the use of shield TBM in Korea.

A Study on Efficiency Improvement through Productivity Analysis Based on TBM Operation Data (TBM공법 적용 현장별 생산성 분석을 통한 효율성 개선 방안)

  • Park, Hong Tae;Song, Young Sun
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.30 no.1D
    • /
    • pp.71-77
    • /
    • 2010
  • This study presented the operation method through of productivity on eight analysis work items (TBM boring, cutter check and exchange, TBM maintenance, succeeding facilities, reinforcement in tunnel, operation alternation, a tram car) which have developed equipment at WRITH with TBM a waterway tunnel works. It was inquired lose time with analyzed result by work items and removed lose time. It was analyzed TBM boring length, TBM boring length percentage and TBM boring length time. This study analyzed TBM operation utility factor of a foreign work with TBM operation boring length percentage, a monthly average boring length, pure boring length percentage etc. and assumed a monthly average boring length and a monthly average boring length of rise forecast. Based on analyzed Data, TBM boring has been forecasted propriety pure boring length at compressive strength $675{\sim}1662kgf/cm^2$.

Assessment of Cutting Performance of a TBM Disc Cutter for Anisotropic Rock by Linear Cutting Test (선형절삭시험에 의한 이방성 암석에 대한 TBM 디스크커터 절삭 성능 평가 연구)

  • Jeong, Ho-Young;Jeon, Seok-Won;Cho, Jung-Woo;Chang, Soo-Ho;Bae, Gyu-Jin
    • Tunnel and Underground Space
    • /
    • v.21 no.6
    • /
    • pp.508-517
    • /
    • 2011
  • The linear cutting test is the most reliable and accurate approach to measuring cutting forces and cutting efficiency using full-size disc cutter in various rock types. The result of linear cutting tests can be used to obtain the key parameters of cutter-head design (i.e. optimum cutter spacing, cutter forces). In Korea, LCM (Linear Cutting Machine) tests have been performed for typical Korean rock types, but these studies focused on the isotropic rocktypes. For prediction of TBM (Tunnel Boring Machine) performances in complex geological conditions including a bedded and schistose rockmass, it is important to consider the effects of anisotropy of rockmass on cutting performances and cutting efficiency. This study discusses a series of LCM tests that were performed for Asan Gneiss having two types of anisotropy angles to assess the effect of the anisotropy angle on rock-cutting performances of TBM. The result shows that the rock-cutting performances and optimum cutting conditions are affected by anisotropy angle and the effect of anisotropy on rock strength should be considered in a prediction of the cutting performances and efficiency of TBM.

Prediction of TBM performance based on specific energy

  • Kim, Kyoung-Yul;Jo, Seon-Ah;Ryu, Hee-Hwan;Cho, Gye-Chun
    • Geomechanics and Engineering
    • /
    • v.22 no.6
    • /
    • pp.489-496
    • /
    • 2020
  • This study proposes a new empirical model to effectively predict the excavation performance of a shield tunnel boring machine (TBM). The TBM performance is affected by the geological and geotechnical characteristics as well as the machine parameters of TBM. Field penetration index (FPI) is correlated with rock mass parameters to analyze the effective geotechnical parameters influencing the TBM performance. The result shows that RMR has a more dominant impact on the TBM performance than UCS and RQD. RMR also shows a significant relationship with the specific energy, which is defined as the energy required for excavating the unit volume of rock. Therefore, the specific energy can be used as an indicator of the mechanical efficiency of TBM. Based on these relationships with RMR, this study suggests an empirical performance prediction model to predict FPI, which can be derived from the correlation between the specific energy and RMR.

A Case Study of Delay Analysis for E.P.B Shield TBM Method in Construction Site (E.P.B(Earth Pressure Balance) Shield TBM 공사의 공기지연 사례연구)

  • Kwak, Jun-Hwan;Park, Hyung-Keun
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.29 no.6D
    • /
    • pp.737-743
    • /
    • 2009
  • Shield TBM, since it was employed for Suyoungman Bay riverbed tunnel of Busan Subway in 2000,has been increasingly adopted in Korea, and in line with growing popularity, the study on Shield TBM has been expanded. However the studies mostly focus on ground condition in a bid to estimate the advancement rate and develop the model for calculating the excavation efficiency, whereas the efforts to analyze the cause of delay and to develop the improvement measures have been neglected. Thus the studies were mostly intended to analyze the schedule slippage focusing on ground conditions, while the study on schedule behind due to equipment itself and related facilities have yet to be attempted in earnest. This study hence was aimed at evaluating the troubles and schedule slippage caused by mechanical elements such as shield TBM equipment and tools and ground conditions, making use of FMEA approach so as to analyze the risk of schedule delay by such elements, thereby proposing the preventive measures to deal with high-risk factors. So, this study suggest the solution to highly ranked trouble factor for the purpose of enhance the efficiency on Shield TBM.