1 |
Dohwa Comprehensive Design Company (2000). Ulsan Industrial Water Design Report.
|
2 |
Park, Y.-W., Park, H.-J. (1996). "TBM Application Examples in Hard Rock." Korea Geotechnical Society.
|
3 |
Doosan Industrial Development (2004). "Large Shield Method I."
|
4 |
Lee, Y.I. (1997). TBM Application Examples in the Tunnel Excavation."
|
5 |
Lee, Y.K. (2010). Civil Engineering Studies, 5th Edition.
|
6 |
Yuwon Construction (1993). Tunnel Boring Machine Method.
|
7 |
Marin, D. (1988). Proven TBM's Turn Power up in Norway Tunneling.
|
8 |
Nishida, T. Matsumura, Y. (1993). Rock Mechnical Viewpoint on Excavation of Pressure Tunnel by TBM.
|