Browse > Article

A Study on the Operation Development Method through the Application Results Large-Diameter Tunnel  

Lee, Yang Kyu (Department of Civil and Environmental & civil Engineering, Daelim University)
Publication Information
Journal of the Society of Disaster Information / v.8, no.2, 2012 , pp. 108-118 More about this Journal
Abstract
The application of TBM tunneling has been progressively increased since the first entrance into korea in 1985. In order to an apprehension and operation development of TBM method which has excellent boring in hard rock tunnel, this study has analyzed mutual relation of lose time and TBM boring from actual construction results TBM tunneling. This study compared this analyzed results with TBM tunnelling construction results of korea, america, japan, analyzed a primary factor of TBM boring effect and suggested operation development method from the analyzed results. accordingly this study can be used an index when contract apply TBM method to planning steps.
Keywords
TBM method; TBM efficiency; TBM boring;
Citations & Related Records
연도 인용수 순위
  • Reference
1 Dohwa Comprehensive Design Company (2000). Ulsan Industrial Water Design Report.
2 Park, Y.-W., Park, H.-J. (1996). "TBM Application Examples in Hard Rock." Korea Geotechnical Society.
3 Doosan Industrial Development (2004). "Large Shield Method I."
4 Lee, Y.I. (1997). TBM Application Examples in the Tunnel Excavation."
5 Lee, Y.K. (2010). Civil Engineering Studies, 5th Edition.
6 Yuwon Construction (1993). Tunnel Boring Machine Method.
7 Marin, D. (1988). Proven TBM's Turn Power up in Norway Tunneling.
8 Nishida, T. Matsumura, Y. (1993). Rock Mechnical Viewpoint on Excavation of Pressure Tunnel by TBM.