• Title/Summary/Keyword: TBM 터널

Search Result 350, Processing Time 0.027 seconds

Prediction of Disk Cutter Wear Considering Ground Conditions and TBM Operation Parameters (지반 조건과 TBM 운영 파라미터를 고려한 디스크 커터 마모 예측)

  • Yunseong Kang;Tae Young Ko
    • Tunnel and Underground Space
    • /
    • v.34 no.2
    • /
    • pp.143-153
    • /
    • 2024
  • Tunnel Boring Machine (TBM) method is a tunnel excavation method that produces lower levels of noise and vibration during excavation compared to drilling and blasting methods, and it offers higher stability. It is increasingly being applied to tunnel projects worldwide. The disc cutter is an excavation tool mounted on the cutterhead of a TBM, which constantly interacts with the ground at the tunnel face, inevitably leading to wear. In this study quantitatively predicted disc cutter wear using geological conditions, TBM operational parameters, and machine learning algorithms. Among the input variables for predicting disc cutter wear, the Uniaxial Compressive Strength (UCS) is considerably limited compared to machine and wear data, so the UCS estimation for the entire section was first conducted using TBM machine data, and then the prediction of the Coefficient of Wearing rate(CW) was performed with the completed data. Comparing the performance of CW prediction models, the XGBoost model showed the highest performance, and SHapley Additive exPlanation (SHAP) analysis was conducted to interpret the complex prediction model.

A Design and Operation of EPBM Applied in Fort Canning Boulder Bed of Singapore (싱가포르 포트캐닝 전석층에 적용된 EPBM의 설계 및 시공)

  • Kim, Uk Young;Noh, Seung Hwan;Noh, Sang Rim
    • Tunnel and Underground Space
    • /
    • v.25 no.5
    • /
    • pp.417-422
    • /
    • 2015
  • This paper introduces the design and operational considerations for TBM tunneling in boulder bed which poses significant problems in terms of advance rate and machine wear. Managing these problems is difficult since normal soil investigation techniques do not accurately predict the presence and frequency of boulders. This has leads to considerable extra costs and delays during construction. In this paper, EPBM design and operational parameters, cutter wear characteristics and soil conditioning method in soft ground condition were studied and key successes were highlighted for future projects in similar ground condition.

Commentary on Soft Ground TBM Tunnel Face Support Calculation Methods (연약지반 TBM 터널 막장지보 계산방법 해설)

  • Jee, Warren Wangryul;Yoo, Jung Hyun
    • Tunnel and Underground Space
    • /
    • v.28 no.2
    • /
    • pp.186-192
    • /
    • 2018
  • The German Tunnelling Committee (DAUB) recently published new recommendations for face support calculations; Zdenek Zizka and Markus Thewes of Ruhr University Bochum actively discuss and explain these new recommendations where these recommendations are intended to assist in choosing between various calculation methods which are also dependent on ground conditions. The guidelines also discuss important scientific approaches with face stability calculations, mainly those due to earth pressure and groundwater pressure on the tunnel face. This paper aims to explain these recommendations through Zdenek Zizak and Markus Thewes's discussion on these Tunnel Face Support Calculation Methods.

Determination of the Construction Method for Young Dong Tunnel by Risk Assessment (위험도 분석기법에 의한 영동선 터널의 굴착공법 결정사례)

  • Kim, Yong-Il;Hencher, S.R.;Yoon, Young-Hoon;Cho, Sang-Kook
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.4 no.1
    • /
    • pp.13-25
    • /
    • 2002
  • The construction method for Young Dong Tunnel has been chosen following detailed risk assessment. In this paper, the specific risks to the project programme, associated with adopting either mechanical excavation in the form of a shielded TBM, or drill and blast excavation methods, are assessed. From the risk assessment results, and taking other important factors into account, such as project sensitivity and local experience, the recommendation is made that the relatively low risk drill-and-blast method is the most appropriate for construction of Young Dong Tunnel.

  • PDF

Staggered Tunnel Barrier engineered Memory

  • Son, Jeong-U;Park, Gun-Ho;Jo, Won-Ju
    • Proceedings of the Korean Vacuum Society Conference
    • /
    • 2010.02a
    • /
    • pp.255-255
    • /
    • 2010
  • 전하 트랩형 비휘발성 메모리는 10년 이상의 데이터 보존 능력과 빠른 쓰기/지우기 속도가 요구 된다. 그러나 두 가지 특성은 터널 산화막의 두께에 따라 서로 trade off 관계를 갖는다. 즉, 두 가지 특성을 모두 만족 시키면서 scaling down 하기는 매우 힘들다. 이것의 해결책으로 적층된 유전막을 터널 산화막으로 사용하여 쓰기/지우기 속도와 데이터 보존 특성을 만족하는 Tunnel Barrier engineered Memory (TBM)이 있다. TBM은 가운데 장벽은 높고 기판과 전극쪽의 장벽이 낮은 crested barrier type이 있으며, 이와 반대로 가운데 장벽은 낮고 기판과 전극쪽의 장벽이 높은 VARIOT barrier type이 있다. 일반적으로 유전율과 밴드갭(band gap)의 관계는 유전율이 클수록 밴드갭이 작은 특성을 갖는다. 이러한 관계로 인해 일반적으로 crested type의 터널 산화막층은 high-k/low-k/high-k의 물질로 적층되며, VARIOT type은 low-k/high-k/low-k의 물질로 적층된다. 이 형태는 밴드갭이 다른 물질을 적층했을 때 전계에 따라 터널 장벽의 변화가 민감하여 전자의 장벽 투과율이 매우 빠르게 변화하는 특징을 갖는다. 결국 전계에 민감도 향상으로 쓰기/지우기 속도가 향상되며 적층된 유전막의 물리적 두께의 증가로 인해 데이터 보존 특성 또한 향상되는 장점을 갖는다. 본 연구에서는 기존의 TBM과 다른 형태의 staggered tunnel barrier를 제안한다. staggered tunnel barrier는 heterostructure의 에너지 밴드 구조 중 하나로 밴드 line up은 두 밴드들이 같은 방향으로 shift된 형태이다. 즉, 가전자대 에너지 장벽의 minimum이 한 쪽에 생기면 전도대 에너지 장벽의 maximum은 반대쪽에 생기는 형태를 갖는다. 이러한 밴드구조를 갖는 물질을 터널 산화막층으로 하게 되면 쓰기/지우기 속도를 증가시킬 수 있으며, 데이터 보존 능력 모두 만족할 수 있어 TBM의 터널 산화막으로의 사용이 기대된다. 본 연구에서 제작한 staggered TBM소자의 터널 산화막으로는 $Si_3N_4$/HfAlO (Hf:Al=1:3)을 사용하여 I-V(current-voltage), Retention, Endurance를 측정하여 메모리 소자로서의 특성을 분석하였으며, 터널 산화막의 제 1층인 $Si_3N_4$의 두께를 1.5 nm, 3 nm일 때의 특성을 비교 분석하였다.

  • PDF

Laboratory chamber test for prediction of hazardous ground conditions ahead of a TBM tunnel face using electrical resistivity survey (전기비저항 탐사 기반 TBM 터널 굴진면 전방 위험 지반 예측을 위한 실내 토조실험 연구)

  • Lee, JunHo;Kang, Minkyu;Lee, Hyobum;Choi, Hangseok
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.23 no.6
    • /
    • pp.451-468
    • /
    • 2021
  • Predicting hazardous ground conditions ahead of a TBM (Tunnel Boring Machine) tunnel face is essential for efficient and stable TBM advance. Although there have been several studies on the electrical resistivity survey method for TBM tunnelling, sufficient experimental data considering TBM advance were not established yet. Therefore, in this study, the laboratory-scale model experiments for simulating TBM excavation were carried out to analyze the applicability of an electrical resistivity survey for predicting hazardous ground conditions ahead of a TBM tunnel face. The trend of electrical resistivity during TBM advance was experimentally evaluated under various hazardous ground conditions (fault zone, seawater intruded zone, soil to rock transition zone, and rock to soil transition zone) ahead of a tunnel face. In the course of the experiments, a scale-down rock ground was provided using granite blocks to simulate the rock TBM tunnelling. Based on the experimental data, the electrical resistivity tends to decrease as the tunnel approaches the fault zone. While the seawater intruded zone follows a similar trend with the fault zone, the resistivity value of the seawater intrude zone decreased significantly compared to that of the fault zone. In case of the soil-to-rock transition zone, the electrical resistivity increases as the TBM approaches the rock with relatively high electrical resistivity. Conversely, in case of the rock-to-soil transition zone, the opposite trend was observed. That is, electrical resistivity decreases as the tunnel face approaches the rock with relatively low electrical resistivity. The experiment results represent that hazardous ground conditions (fault zone, seawater intruded zone, soil-to-rock transition zone, rock-to-soil transition zone) can be efficiently predicted by utilizing an electrical resistivity survey during TBM tunnelling.

Development of disc cutter wear sensor prototype and its verification for ensuring construction safety of utility cable tunnels (전력구 터널 건설안전 확보를 위한 디스크커터 마모측정시스템 시작품 개발 및 성능검증)

  • Jung Joo Kim;Hee Hwan Ryu;Seung Woo Song;Seung Chul Do;Ji Yun Lee;Ho Young Jeong
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.26 no.2
    • /
    • pp.91-111
    • /
    • 2024
  • Most of utility cable tunnels are constructed utilizing shield TBM as part of the underground transmission line project. The TBM chamber is the only space inside the tunnel that encounters rock and soil, and is the place with the highest frequency of accident exposure, such as collapse and collision accidents. Since there is currently no way to measure the disc cutter wear from outside the chamber, frequent inspection by workers is essential. Accordingly, in this study, in order to prevent safety accidents inside the TBM chamber and expect the effect of shortening the construction period by reducing the number of chamber openings, the concept of disk cutter wear measurement technology was established and a prototype was produced. By considering prior technology and determining that magnetic sensors are most suitable for the excavation environment, wear measurement sensor package were developed integrating magnetic sensors, wireless communication modules, power supply, external casing, and monitoring systems. To verify the performance of the prototype in an actual excavation environment, a full-scale tunnelling test was performed using a 3.6 m EPB shield TBM. Based on the full-scale tests, five prototypes were operated normally among eight prototypes. It was analyzed that sensor measurement, wireless communication, and durability performance were secured within a maximum thrust of 3,000 kN and a rotation speed of 1.5 RPM.

Shield TBM trouble cases review and parameter study for the cause analysis (쉴드 TBM 트러블 사례 및 매개변수 연구를 통한 원인 분석)

  • Koh, Sungyil;La, You-Sung;Kim, Bumjoo
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.22 no.2
    • /
    • pp.197-217
    • /
    • 2020
  • Shield TBM tunneling, used in the construction of Seoul subway line 7 and line 9, has been well known as a very efficient, as well as safe, tunneling method. Although the Shield TBM method has been known to be effectively used in poor ground conditions, a number of troubles have occurred during the use of the shield TBM, due to inappropriate machine selection, machine breakdown, and unpredicted ground conditions etc. In this study, several accidents and trouble cases occurred during excavation by Shield TBM, reported from Japan, were investigated. A series of numerical analysis was then performed to compare with the trouble cases and back-analysis results for the cause analysis. The lessons learned from the case studies are presented at the end.

A Study on Standard Construction Process Management System for Prediction of Proper Construction Period of Subsea Tunnel (해저터널 적정 공사기간 예측을 위한 표준공정관리 체계 연구)

  • Bae, Keunwoo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.18 no.4
    • /
    • pp.36-47
    • /
    • 2017
  • As a typical domestic subsea tunnel construction the Gadeok subsea tunnel applying the method of immersed tunnel has been completed and the Boryeong-Taean subsea tunnel is under construction using NATM. The high-speed railway subsea tunnels between the Honam and Jeju are under consideration, and the feasibility of constructing subsea tunnels with Japan and China is also under consideration. However, it is difficult to provide the process plan information for the construction work such as the analysis of the feasibility of the subsea tunnel and the prediction of the proper construction period because there is no case of domestic construction for it applying the shield TBM method. Due to economic and other reasons, government organizations are reluctant to apply the shield TBM, and there is lack of data on the construction process management field using the shield TBM method. Therefore, a standard construction process management system for the subsea tunnel is needed to analyze the feasibility of the subsea tunnel and to predict the proper construction period. By presenting the standard construction process management system of subsea tunnels such as WBS, Network Diagram, and construction period calculation model, I hope to contribute technically and economically to future subsea tunnel projects.

Case study of design and construction for cutter change in EPB TBM tunneling (EPB 쉴드 TBM 커터 교체 설계 및 시공 사례 분석)

  • Lee, Jae-won;Kang, Sung-wook;Jung, Jae-hoon;Kang, Han-byul;Shin, Young Jin
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.24 no.6
    • /
    • pp.553-581
    • /
    • 2022
  • Shortly after tunnel boring machine (TBM) was introduced in the tunneling industry, the use of TBM has surprisingly increased worldwide due to its performance together with the benefit of being safely and environmentally friendly. One of the main cost items in the TBM tunneling in rock and soil is changing damaged or worn cutters. It is because that the cutter change is a time-consuming and costly activity that can significantly reduce the TBM utilization and advance rate and has a major effect on the total time and cost of TBM tunneling projects. Therefore, the importance of accurately evaluating the cutter life can never be overemphasized. However, the prediction of cutter wear in soil, rock including mixed face is very complex and not yet fully clarified, subsequently keeping engineers busy around the world. Various prediction models for cutter wear have been developed and introduced, but these models almost usually produce highly variable results due to inherent uncertainties in the models. In this study, a case study of design and construction of disc cutter change is introduced and analyzed, rather than proposing a prediction model of cutter wear. As the disc cutter is strongly affected by the geological condition, TBM machine characteristic and operation, authors believe it is very hard to suggest a generalized prediction model given the uncertainties and limitations therefore it would be more practical to analyze a real case and provide a detailed discussion of the difference between prediction and result for the cutter change. By doing so, up-to-date idea about planning and execution of cutter change in practice can be promoted.