The Success Factors of Scheduling Using the TACT Technique in Wall Type Apartment House Construction (벽식(壁式) 아파트의 택트공정(工程)계획의 성공요인 분석에 관(關)한 연구(硏究))

  • Kim Joon-Ho;Kim Gwang-Hee;Cho Hyung-Keun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.6 no.1 s.19
    • /
    • pp.79-86
    • /
    • 2006
  • Recently, the construction companies show lots of interest in reducing the construction duration of apartment housing project in Korea. Therefore, the purpose of this study is to investigate the success factors of scheduling using the TACT technique in wall type apartment house construction for managing the construction schedule effectively. For appling the tact scheduling technique to wall type apartment house construction, the success factors can be summarized as follows : (1) zoning the horizontal and vortical work area properly, (2) preparing the flow chart of finishing works, (3) minimizing the undefined activity like chipping off the concrete wall, (4) reordering the construction activities for keeping up the continuity of works in winter season, (5) dividing the amount of work for minimizing the delay time of any activity, etc.

Development on the Process Control System for Full Gate Visual Test of LCD Manufacturing Process (LCD 생산공정의 전게이트 시각 검사를 위한 공정 제어장치 개발)

  • Park, Hyoung-Keun
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.10 no.7
    • /
    • pp.1725-1728
    • /
    • 2009
  • This research developed process control device and FGV pattern generating device essential for full gate visual inspection to improve process so that defect detection capability may be maximized in specified environment. The devices developed in this research, which can be swiftly replaced in case loss or error occurs, are anticipated to improve module yield as well as maintain tact loss near '0'. In addition, as a result of mounting H/W and S/W system to control detailed operation sequence in production line and executing performance check and verification, detection rates were 98.1% and 99.1% respectively for pixel defect by tact and line defect, and yield of the entire module process including gate and visual level test increased up to 98.3%.

Analysis of Boundary Conditions for Activities' Relationships in Linear Scheduling Model (선형 공정계획 모델의 액티비티 관계의 경계조건 분석)

  • Ryu, Han-Guk;Kim, Tae-Hui
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.1
    • /
    • pp.23-32
    • /
    • 2011
  • Domestic leading construction companies has been establishing and performing TACT scheduling method, similar to linear scheduling model such as line of balance and repetitive schedule, and etc. in which repetitive construction works are involved like high-rise building. Linear scheduling model has been researched as a visual scheduling method presenting the work space and time information. Likewise scheduling constraints of CPM network such as finish-to-finish, start-to-start, finish-to-start, start-to-start, linear scheduling model also has the relationships constraints, namely boundary conditions, between activities. It is especially necessary to define the boundary conditions of the activities' relationships in order to apply the linear scheduling model to be compatible with the network schedule. Therefore, this research considers the boundary conditions between activities for establishing the linear scheduling model. This paper also applies the proposed boundary conditions to TACT schedule and then deduces the main considerations in order to establish and perform TACT schedule.

A Study on Application of Lean Construction Theory in Schedule Management (린 건설 공정관리이론의 현장적용에 관한 연구)

  • Jung, Joo-Young;Kwon, Won;Park, Sang-Jun;Chun, Jae-Youl
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.515-518
    • /
    • 2006
  • Construction project has various effective factor and many producer in multifarious process of the work. Thus it has many variation. However, Process management up to now is management method of conclusion oriented. So, it do not consider sequency and variation occurrence. In a result that a lot of problems happen. Lean Construction can solve limit of the present management method. And Lean Construction is estimated new management method of process management for reliance on process plan, safety of process and promotion of effectiveness. This study analysed application of real construction project in Lean Construction theory and examined to utilize VSM and TACT for field application.

  • PDF

STEPS : shipbuilding tact epert planning system (선각 조립공정 스케쥴링 전문가 시스템)

  • 최영순;김남훈;이창호
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 1994.04a
    • /
    • pp.668-677
    • /
    • 1994
  • STEPS는 삼성 조선의 블록 조립생산공정의 라인스케쥴링을 수행하는 시스템이다. 삼성중공업 조선 해양 사업본부는 그간 생산성 향상을 통한 대외 경쟁력 제고와 선진 조선의 입지를 확고히 하고자 부단한 노력을 기울여 왔다. 이러한 노력은 생산 설비 확충과 자동화 등 하드웨어 차원에서 많은 발전을 이루었고, 이제는 설계, 계획, 관리등 소프트웨어 차원의 발전으로 전환하고 있다. 15여년 간의 경험과 노하우를 체계적으로 정립하여 현실적이면서 합리적인 소프트웨어를 구축하는 것은 삼성조선의 새로운 도전이 되고 있다. 이에 현장 데이타의 축적과 효과적인 관리 피드백으로 선각, 도장, 의장등 전 공정을 합리적으로 계획, 관리코자 생산공정 관리 시스템의 구축을 추지하고 있다. 이러한 생산공정 관리 시스템의 일환으로 대.중조블럭 일정계획의 자동화한 것이 STEPS(Shipbuilding Tact Expert Planning System) 프로젝트이다. STEPS는 전문가시스템(Expert System)으로서 전문가의 지식(Knowledge)을 시스템화하는 인공지능 (Artificial Intelligence)기법을 적용하고 있다.

TACT Productivity Management for Finish Works of Residential Buildings using Productivity Achievement Ratio (PAR) (공동주택 마감공사 TACT 기법 생산성 관리 - Productivity Achievement Ratio를 활용한 생산성 관리 -)

  • Joo, Seonu;Park, Moonseo;Lee, Hyun-Soo;Lee, Kwang-Pyo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.16 no.3
    • /
    • pp.36-48
    • /
    • 2015
  • To complete various types of finish works with higher quality in much less time, TACT, which was mostly used for high-rise buildings, has been adapted to meet the needs for systematic schedule management in construction sites. However, the effectiveness of adapting TACT has not been shown as expected due to the different perspectives on productivity from both general contractor and subcontractors based on unforeseen conditions according to the types of site. Furthermore, not enough theoretical backgrounds, empirical data, and systematic approaches to solve the fundamental problems caused by each participants' different views on productivity has produced obstacles for establishing effective solutions. Therefore, this research aims to analyze the possible main reasons for having different point of views regarding productivity among various participants of residential building sites using TACT based on literature review, site survey, and interviews. Also, case study was conducted to propose obtainable productivity (OP) regression equation and productivity achievement ratio (PAR) with reduction factors (RFs) and actual productivity (AP) data from an actual construction site. The proposed outcome may assist general contractors converting output management with PPC to productivity management with actual data using PAR. On the other hand, subcontractors would be able to estimate theory-based maximum productivity of construction sites with TACT by using OP. The PAR will enhance the communication between general and sub-contractors for their decision making process. Finally, the main RFs derived from PAR could be used as essential keys for productivity management to increase the economical and operational effectiveness of the construction project.

Applied cases of advanced construction & engineering technology at Tower Palace III Project (타워팰리스 III 현장의 첨단 시공 및 엔지니어링 기술 적용사례)

  • Wang In-Soo
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.202-213
    • /
    • 2003
  • Tower Palace III project is the highest residential and commercial high-rise complex building in Korea. In order to construct a high-rise building, advanced construction and engineering technology is required. Therefore, with more developed construction and engineering technology based upon accumulated knowledge, construction speed of 13.4 days per floor including finish work was achieved in this project. To achieve this project successfully, three main advanced construction technology were applied: 1) Construction methods for 3-day cycle of structural work and curtain wall, 2) Tact scheduling method for finish work, 3) Management system of material, labor, work, and information. Also, four main engineering technology were applied: 1) New material such as high -flowing concrete and high strength concrete of 800 kgf/cm2, 2) New method such as a pipe-cooling system of a cool water circulating type, 3) Mechanical system such as smart-fan controlling kitchen-ventilation system, 4) Electrical system such as false car system.

  • PDF

The Analysis of the Heat Transfer Characteristic in a PDP Ventilation Chamber (PDP용 배기로내 열전달 현상에 관한 해석)

  • Park, Hyung-Gyu;Chung, Jae-Dong;Kim, Charn-Jung;Lee, Joon-Sik;Park, Heui-Jae;Cho, Young-Man;Cho, Hae-Kyun;Park, Deuk-Il
    • Proceedings of the KSME Conference
    • /
    • 2000.04b
    • /
    • pp.385-391
    • /
    • 2000
  • An analysis of the heat transfer in a PDP ventilation chamber has been conducted to investigate the required heat curve and temperature uniformity of the panels. Firstly, experiment in a test chamber has been carried out and compared with the unsteady 3D numerical simulation. Reasonable agreement was found, which suggested that the employed numerical model had its credibility in an actual PDP ventilation process. On this ground, tact-type heating/cooling system was analyzed. The panel temperature was more uniform in the $40^{\circ}C$ tact-type system than in the $80^{\circ}C$ one. Comparison of full simulation of a cart and simplified simulation of one panel shows the panel pitch, which is closely related to a production rate, can be also predicted.

  • PDF

Heat Transfer Analysis in a PDP Ventilation Chamber (PDP용 배기로내 열전달 현상 해석)

  • Park, Hyeong-Gyu;Jeong, Jae-Dong;Kim, Chan-Jung;Lee, Jun-Sik;Park, Hui-Jae;Jo, Yeong-Man;Jo, Hae-Gyun;Park, Deuk-Il
    • Transactions of the Korean Society of Mechanical Engineers B
    • /
    • v.25 no.3
    • /
    • pp.347-355
    • /
    • 2001
  • A heat transfer analysis in a ventilation chamber of Plasma Display Panel(PDP) has been conducted. The process requirement is to precisely follow prescribed temperature trajectory while maintaining temperature uniformity for each panel. Firstly, experiment in a test chamber has been carried out and the results are compared with the unsteady 3D numerical data. Reasonable agreement was found, which suggested that the employed numerical model had its credibility in actual PDP ventilation processes. On this ground, a tact-type heating/cooling system was analyzed. The panel temperature in the 40$^{\circ}C$ tact-type system was more uniform than that in the 80$^{\circ}C$ one. For improving the uniformity of panel temperature, relocation of ventilation head to the rear part and inlet flow control are required. Comparison of full simulation of a cart and simplified simulation of one panel indicates the optimized panel pitch can also be predicted.

A Study on the Efficiency Improvement of Wet Etching Equipment using 6-Sigma Method (6-시그마 기법을 이용한 습식식각 설비의 효율 개선에 관한 연구)

  • Yu, Jong-Hyeon;Kim, Chang-Eob
    • Proceedings of the KAIS Fall Conference
    • /
    • 2011.05a
    • /
    • pp.347-350
    • /
    • 2011
  • 본 논문에서는 습식식각 설비의 Process 동작 간에 발생되는 설비의 비 가동 시간을 최소화하여 Throughput을 향상시키기 위하여 Monitoring 한 결과 Recipe 변경, 액 교환 발생, Tact 변경 등의 공정간 조건에 따라 대기시간이 발생(생산 지연시간 발생) 하는 것을 확인 하고 이를 개선하기 위한 연구이다. 연구 방법으로, Recipe Data 적용 시점을 약액 구간 처리 완료 시점에서 후속 기판이 대기하지 않고 연속 투입을 실시, Chamber Drain과 약액 Tank 전환이 동시에 이루어지고 액 교환 동작 중 Pump Spray의 연속성을 유지하는 무정지 액 교환 Sequence 적용, Tact 적용 시점을 전 기판 배출 확인 후 실시하는 것을 약액 구간 처리 완료 후 적용의 3가지 방법을 6시그마의 DMAIC 기법을 활용하였다. 연구 결과 개선 전 비 가동 시간이 설비 대당 1일 28분 시그마 Level 3.40 이었던 것을 개선 후 설비 대당 1일 17분 시그마 Level 5.3 으로 개선됨을 확인 할 수 있다.

  • PDF