Protected area of water for supply source is located mostly of rural area in Korea. Normally, sewage treatment system is poor to manage in rural, because low population and density. Rural area need sewage treatment system to supervise supply source of water. In this study, analysis on operation result of 4 RCSTP and MWTP is located at the rural area. Higher concentration of pollutant were inflows to MWTP than RCSTP, and effluent quality standard is satisfaction. However, RCSTP effluent pollutant concentrations was researched higher than MWTP. The organic matter(BOD, COD) were about 5% of a high treatment efficiency to a median. The nutrient(T-N, T-P) were detected Up to high 30%. Also, we analyzed to effect reactor operational parameters on the pollutant treatment efficiency like mixed liquer suspended solid(MLSS), dissolved oxygen(DO) and sludge retention time(SRT). As a result, pollutant treatment efficiency showed fluctuation in accordance with operating condition. Thus, it is necessary to manage the reactor operation condition for management of rural area sewage treatment.
To treat nitrate and non-biodegradable organics effectively in sewage, industrial wastewater and livestock wastewater, the activated sludge process integrated by a membrane separation and a porous electrode- electrolysis was proposed and its efficiency was investigated. The proposed system was consisted of 3 processes; activated sludge, membrane filtration and electrolysis. In the study, the membrane filtration played a role in reducing the load of the electrolysis to operate the proposed process stably. The electrolysis consisted of a porous electrode to increase the efficiency due to the extension of the specific surface area. Additionally, redox reaction in the electrolysis was induced by decomposing influent water as current was applied. As a result, hydrogen free radicals and oxygen radicals as intermediates were produced and they acted as oxidants to play a role in decomposing non-degradable organics. It was environmentally-friendly process because intermediates produced by porous electrode were used to treat waste matters without supplying external reagent. Experimental data showed that the proposed process was more excellent than activated sludge process. SS removal efficiencies of the proposed process, membrane filtration and activated sludge process were about 100%, about 100% and about 90%, respectively. COD removal efficiencies of the proposed system, membrane filtration and activated sludge process were about 92%, about 84% and about 78%, respectively. T-N removal efficiencies of the proposed system, membrane filtration and activated sludge process were about 88%, about 67%, and about 58%, respectively. The SS data showed that SS was efficiently removed in the single of the membrane filtration. The COD/T-N data showed that COD/T-N of membrane hybrid process was treated by removing a little soluble organics and SS, and that COD/T-N of electrolysis hybrid process was treated by oxidize organics with high removal rate.
Kim, Jin-Soo;Kim, Sun-Jong;Oh, Kwang-Young;Oh, Seung-Young;Kim,Je-Su;Jeong, Young-Ho
Journal of Korea Water Resources Association
/
v.36
no.5
/
pp.787-797
/
2003
The characteristics of concentrations and loads of Total Nitrogen(T-N), Total Phosphorus(T-P), and Chemical Oxygen Demand (COD) in mountain stream water were examined from September 2000 through August 2001. The 92.5-ha study watershed in Chungbuk Province consists of 59% mixed forest and 30% coniferous forest. Streamflow was measured and water samples were collected at about 10 day intervals for dry days and at 2-6 hour intervals for a storm event at the study watershed outlet. The mean concentration of COD in streamflow for rainy days was significantly (p < 0.05) higher than for dry days. The mean concentrations of T-N and T-P in vegetation growing season (May to October) were lower than those in vegetation dormant season (November to April). Low concentrations of pollutants during vegetation growing season are likely due to the heavy demand for nutrients by the vegetation and biological activity associated with a warming of soil. The ratios of pollutants loads during storm periods to annual pollutants loads were 87% for T-N, 83% for T-p, and 87% for COD. The unit loads of pollutants for study area were estimated at 5.9 kg/ha $\cdot$ yr for T-N, 0.15 kg/ha $\cdot$ yr for T-p, and 23.9 kg/ha $\cdot$ yr for COD. The removal efficiency of pollutants in study area were 24% for T-N, 58% for T-P and 66% for COD, indicating that a study area shows water purification function.
Kim, Jin-Sik;Kim, Kyu-Ri;Kang, Han-Sol;Won, In-Seop;Kim, Keum-Yong;Lee, Sang-Ill
Journal of Korean Society of Environmental Engineers
/
v.34
no.3
/
pp.189-194
/
2012
In this study, a 3-stage biological aerated filter (BAF) system was proposed to enhance nitrogen removal in the treatment of low carbon to nitrogen ratio (C/N ratio) municipal wastewater. Laboratory experiments were conducted to evaluate the effects of dynamic-flow at the HRT of 6 h. Results of the long-term operation of 3-stage BAF systems showed that the dynamic-flow enabled the total nitrogen removal (T-N) removal efficiency of the system to be about 7 % higher than that of non-dynamic-flow system in treating domestic wastewater due to the more efficient use of organic substrates. The overall $NH_4$-N removal performance was stable during the operational period due to the unique system configuration where independent nitrification occurred. It was concluded that the 3-stage BAF system proposed in this study provided excellent performance in the removal of nitrogen by employing dynamic-flow and three columns functioning as sorption, denitrification and nitrification, respectively.
The research is intended to develop and verify a biological complex soil treatment process to treat and restore soil and groundwater which is contaminated with oil, heavy metals, and nutrients through experiments with the series of treatment process such as bioreactor, rolled pipe type of contact oxidation system(RPS), and chemical processing system. 5 microbial strains were separated and selected through experiment, whose soil purification efficiency was excellent, and it was noted that anion- and nonion-series of complex agent was most excellent as a surfactant for effectively separating oils from soils. Method to mix and apply selected microbes after treating the surfactant in the contaminated soil was most effective. The removal efficiencies of total petroleum hydrocarbon (TPH)-contaminated soil about 5,000mg/L and above 10,000mg/L were approximatly 90.0% for 28 days and 90.7% for 81 days by soil remediation system and the average removal efficiencies of BOD, $COD_{Mn}$, SS, T-N, and T-P in leachate were 90.6, 73.0, 91.9, 73.8, 65.7% by the bioreactor and RPS. The removal efficiency was above 99.0% by chemical processing system into cohesive agents.
Kim, Seong-Heon;Seo, Dong-Cheol;Park, Jong-Hwan;Lee, Choong-Heon;Choi, Jeong-Ho;Kim, Hong-Chul;Ha, Yeong-Rae;Cho, Ju-Sik;Heo, Jong-Soo
Korean Journal of Environmental Agriculture
/
v.31
no.4
/
pp.344-350
/
2012
BACKGROUND: To design and develop a constructed wetland for effective livestock wastewater treatment, it is necessary to understand the removal mechanisms of various types of pollutants in constructed wetlands. The objective of this study was to evaluate the treatment efficiency of pollutants under different types of fraction in constructed wetland system for treating piggery wastewater. METHODS AND RESULTS: The piggery wastewater treatment plant that consisted of activated sludge tank, aerobic and anaerobic beds was constructed. The concentration of COD(Chemical oxygen demand) in effluent by fraction was 71.5 mg/L for soluble COD, 142 mg/L insoluble COD. The concentration of SS(Suspended solid) in effluent by existing form was 102 mg/L for volatile SS, 15.5 mg/L for fixed SS. The concentration of T-N(Total nitrogen) and T-P(Total phosphorus) in effluent by existing form were 12.8 mg/L and 3.05 mg/L for dissolved form, 35.0 mg/L and 1.93 mg/L for suspended form. The removal efficiencies of COD, SS, T-N and T-P in hot season(summer and autumn) were higher than those in cold season(spring and winter). The removal efficiencies of COD, SS, T-N and T-P in effluent were 98.0, 99.0, 98.2 and 99.2% for all seasons, respectively. CONCLUSION(S): The results indicated that removal types of pollutants were insoluble COD(ICOD), volatile SS(VSS), dissolved T-N(DTN) and dissolved T-P(DTP) in constructed wetlands for treating piggery wastewater.
Journal of Korean Society of Water Science and Technology
/
v.26
no.6
/
pp.53-59
/
2018
Water pollution is drastically increasing day by day, because of the enhancement in use of livestock, urban sewage detergents and fertilizers. Moreover increase in concentration of phosphorous and nitrogen contained in sewage, leads to green tide problem in the rivers and causes marine pollution. For this problem to solve, several technologies are being researched and developed. Among them, this experiment is a study on Bench-scale STP based on internationally certified sewage treatment equipment by MEPC. 227(64) of IMO. The purpose of this study is to compare the biological treatment efficiency of phosphorus of Bench-scale STP. The ratio of C : N : P was set to 10 : 5 : 3 and 10 : 3 : 1 as the operating conditions. And the operation cycle was set to anoxic(mixed) 70 min - aeration 50 min (70-50), anoxic(mixed) 90 min - aeration 60 min (90-60). As a result, the phosphorous treatment efficiency was 88% at average, and the treatment efficiency was steady at 90-60 better than 70-50. The efficiency of the bench-scale STP has been verified through this experiment and additional experiments are required to derive the optimal operating conditions.
This study focused on the availability of wastewater reclamation and reusing system as one of the alternatives against the global water shortage in near future, which system is composed of two treatment steps; first, wastewater is injected into upflow $A^2O$ biofilm process(anaerobic/anoxic/oxic) reactor filled with polyethylene fixed-media, and the effluent of 1st steps continuously passed through downflow nano silver sand filter. The pH of the effluent ranged from 7.39 to 8.06(average 7.84), the $COD_{Mn}$ was $8{\sim}18mg/L$(average 12.1 mg/L), and $BOD_5$ was $2.1{\sim}10.0mg/L$(average 4.9 mg/L), that met all the wastewater reclamation and reusing system criteria. Besides, the SS concentrations of the effluent which was $3{\sim}9mg/L$(average 4.95 mg/L) met the criteria(5 mg/L), showing 94.8% of average removal efficiency. The 99.1% of the average removal efficiency of the E-coliform did not met the criteria(Not detected), which indicates the needs for the following chlorine disinfection treatment with the residual chlorine concentration of above 0.2 mg/L. There are no bacteria on the sand surface coated by nano silver. The removal efficiency of T-N and T-P that could be included into the criteria in the future was 50.3% and 27.2% respectively.
Kim, Hyung-Chul;Ham, Jong-Hwa;Han, Jung-Yoon;Yoon, Chun-Gyeong
Korean Journal of Ecology and Environment
/
v.39
no.4
s.118
/
pp.481-488
/
2006
The field scale experiment was performed to examine the performance of the constructed wetland for nonpoint source (NPS) pollution loading reduction. Four sets (0.88 ha each) of wetland and pond system were used. After three growing seasons of the wetland construction, plant coverage increased to about 90% even without plantation from bare soil surfaces at the initial stage. During the start up period of constructed wetlands, lower water levels should be maintained to avoid flooding newly plants, if wetland plants are to start from germinating seeds. The average removal rate of $BOD_5$, TSS, T-N and T-P during the first two years was 5.6%, 46.6%, 45.7%, and 54.8%, respectively. The $BOD_5$ removal rate was low and it might be attributed to the low influent concentration. The early stage of wetland performance demonstrated the effectiveness of water quality improvement and was satisfactory for treating polluted stream waters. From the first-order analysis, T-P was virtually not temperature dependent, and $BOD_5$ and TSS were more temperature dependent than T-N. A pond-wetland system was more effective than a wetland-pond or a wetland alone system in water quality improvement, particularly to reduce T-P. Overall, the wetland system was found to be an adequate alternative for treating a polluted stream water with stable removal efficiency and recommended as a NPS control measures.
Journal of the Korean Society of Environmental Restoration Technology
/
v.4
no.4
/
pp.56-63
/
2001
This paper presents treatment efficiency and plant growth of a subsurface-flow constructed wetland system (23 m in length, 6.5 m in width, 0.65 m in depth) over one year after its establishment on floodplain of a stream in June 2000. An upper layer of 10 cm in depth was filled with course sand and the main biological layer of 50 cm depth with crushed stone with 8 - 15 mm in diameter. The system was planted with common reeds (Phragmites australis) grown on pots. Effluent discharged from a secondary-level treatment plant was funneled into it. Reed stems emerging in April 2001 grew up to 145.9cm until July 2001. The number of reed stems in July 2001 increased by about 11 times compared with that just after planting. The system was inundated seven times by storms over the monitoring period. Reeds were slightly bent after flooding, however they returned to almost upright standing in a couple of weeks. Small portion of inside slope of berm was eroded and the system surface had a sedimentation of 2 - 3 mm in depth. The average removal rates for SS, $BOD_5$, T-N and T-P was 73%, 70%, 53%, and 72%, respectively. The purification efficiencies for SS and $BOD_5$ were fairly good. The reduction rates for T-N was relatively low for the period of late fall through winter until early spring due to lower water temperature which retarded microbial nitrification and denitrification mechanisms. Reduction in the concentration of T-P during fall and winter was relatively higher than that during spring. Leach of phosphorous from plant litters lying on system surface and slight resuspension of precipitated phosphorous in substrates resulted in lower reduction for T-P in spring.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.