• Title/Summary/Keyword: T-N removal

Search Result 607, Processing Time 0.029 seconds

Development of New BNR Process Using Fixed-Biofilm to Retrofit the Existing Sewage Treatment Plant (고정생물막을 이용한 기존 하수처리장의 생물학적 영양염 제커 신공정개발)

  • Kim, Mi-Hwa;Lee, Ji-Hyung;Chun, Yang-Kun;Park, Tae-Joo
    • Journal of Korean Society of Environmental Engineers
    • /
    • v.22 no.6
    • /
    • pp.1093-1101
    • /
    • 2000
  • The object of this study was to develop new BNR process using fixed-biofilm which could be applied to retrofit the existing wastewater treatment plant or to introduce as tertiary treatment plant. To achieve complete denitrification from typical raw sewage in Korea, external carbon source must be supplied because $SCOD_{cr}/T-N(NH_4{^+}-N+NOx-N)$of raw sewage was lower than other countries. In this study, the ratio of $SCOD_{cr}/NH_4{^+}-N$ was 2.49 and the influent $NH_4{^+}$-N concentration during the experimental period was varied from 25 to 37 mg/L. To enhance nitrogen removal from the sewage, the two processes using fixed biofilm were adopted as R-Hanoxic/mid.settler/aerobic/anoxic/ aerobic) and R-2(aerobic/mid.settlerlanoxic/anoxic/aerobic), respectively. In the comparison of $NH_4{^+}$-N, T-N effluent quality and T-N removal efficiency in both processes without external carbon source, R-1 process was better than R-2 process for nitrogen removal from raw sewage. With respect to $SCOD_{cr}$/NOx-N ratio and total nitrogen removal in each anoxic reactor of two processes, R-1's was more effective than R-2's for distributing organic matters of raw sewage. In the both processes using fixed biofilm, the amount of required alkalinity to remove unit $NH_4{^+}$-N were 5.18 and 5.76($g{\cdot}CaCO_3/g{\cdot}NH_4{^+}-N_{removed}$), respectively and were lower than activated sludge BNR process(7.14).

  • PDF

Nitrogen removal characteristics of pigment wastewater using PAC-A/O process (PAC-A/O 공정을 이용한 안료폐수의 질소 제거 특성)

  • Jeong, Jongsik
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.32 no.1
    • /
    • pp.19-25
    • /
    • 2018
  • The objectives of this study were to evaluate the removal characteristics of total nitrogen, the influence factor of denitrification and the optimum operating condition in the pigment wastewater treatment using PAC-A/O process. The operating conditions of PAC-A/O process were mean BOD volumetric loading $0.86kgBOD/m^3/day$, mean F/M ratio 0.072~0.13 kgBOD/kgMLVSS/day and mean C/N ratio 3.47, respectively. The conditions of anoxic process in the field plant test were mean pH 8.3~8.7 and mean temperature $34.1{\sim}44.0^{\circ}C$. The ORP bending point knee was eventually appeared in the ORP -107 mV and $NO_3{^-}-N$ removal efficiency was increased according to the ORP decrease. In the ORP -107 mV below condition, the removal efficiency of T-N and $NO_3{^-}-N$ was 92.3~95.0% and 98.5~99.7%. Denitrification rate was calculated to be 1.581~1.791 mg $NO_3{^-}-N/gMLSS/hr$. The experimental results showed that the ORP control in the PAC-A/O process could be an effective method for treatment of pigment wastewater.

Advanced Wastewater Treatment Using Anoxic-Aerobic Reactor Filled with Porous Media (다공성 미디어를 충진한 혐기-호기 반응조를 이용한 하수고도처리에 관한 연구)

  • Kim, Dong-Ha
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.21 no.1
    • /
    • pp.83-89
    • /
    • 2007
  • A biological anoxic-aerobic reactor filled with porous media was operated in lab scale for the advanced wastewater treatment. The experiments were conducted for 6 months with three HRTs (4, 6, 8hr) and temperature of $23{\sim}25^{\circ}C$. Some other experimental conditions were as follows; nitrification reactor (MLSS 4,500mg/L, DO 3.3mg/L, $23{\sim}28^{\circ}C$), denitrification reactor(MLSS 8,000mg/L, ORP -100mV, Temp.$19{\sim}23^{\circ}C$). Average removal efficiencies of SS, $BOD_5$, $COD_{Cr}$, T-N, and T-P were 97.8%, 95.5%, 94.5%, 80.2%, and 60.6%, respectively. The reactor filled with porosity media showed stable removal capacity for organics and nutrients. Fast and complete nitrification and denitrification were accomplished. Maintaining high MLSS with porous media in the nitrification and denitrification reactor appears to enhance the nitrogen removal process. For the higher T-P removal, some coagulant addition process will be needed.

Advanced Sewage Treatment by the Modified SBR(Sequencing Batch Reactor) Process (변형 연속회분식 반응기를 이용한 오수의 고도처리)

  • 김병군;서인석;홍성택;정위득
    • Journal of environmental and Sanitary engineering
    • /
    • v.17 no.3
    • /
    • pp.46-51
    • /
    • 2002
  • This study was performed to treat a sewage at the upper stream of dam using modified sequencing batch reactor, During the operating period, average $COD_{cr}$, removal efficiency was about 85% but average T-N and ${PO_4}^{3-}-P$ removal efficiencies were 43% and 30% respectively. Because the organic matter was very low compared with nitrogen and phosphorous in influent($BOD_{5}/{NH_4}^{+}-N{\;}={\;}2,{\;}BOD_{5}/{PO_4}^{3-}-P{\;}={\;}15.6$), nitrogen and phosphorus removal efficiency was relatively low. Average nitrogen removal efficiency was 50 % at $10^{\circ}C$ or above and it was 36 % at $10^{\circ}C$ or below. As reactor was located in outdoor without any thermostat, temperature decreased at least $2.4^{\circ}C$ in the winter season. Therefore, if we would apply this modified sequencing batch reactor to sewage which concentration of organic matter was very low compared with nitrogen and phosphorous, we have to addition of external carbon and installation of any thermostat.

Treatment Efficiency and Plant Growth of Early Stage of Pond-Wetland System at Estuary Lake (간척지 연못-습지 시스템의 질소.인 초기 처리수준 및 식물성장)

  • Yang, Hong-Mo;Choi, Soo-Myung;Yoon, Kwang-Sik
    • Proceedings of the Korean Society of Agricultural Engineers Conference
    • /
    • 2001.10a
    • /
    • pp.426-430
    • /
    • 2001
  • Treatment efficiency and plant growth of a combined Pond-Wetland system was investigated. The system is composed of primary and secondary ponds and six wetland cells. Reed and cattail were planted as vegetation of wetland cells. The removal rates of BOD, SS, T-N, and T-P were 40%, 41%, 30%, and 47% at the secondary pond, respectively. The system removal rates measured at the last wetland cell were 57%, 54%, 60%, and 68% for BOD, SS, T-N, and T-P, respectively.

  • PDF

Water Quality Improvement of Inflow Stream in Estuary using Wetland and Pond (습지와 유수지를 이용한 하구담수호 유입하천의 수질개선)

  • Koo, Won-Suk;Yoon, Chun-Gyeong;Ham, Jong-Hwa
    • Proceedings of the Korean Society of Agricultural Engineers Conference
    • /
    • 2003.10a
    • /
    • pp.587-590
    • /
    • 2003
  • Wetland systems are widely accepted natural water purification systems around the world in nonpoint sources pollution control. In this study, the field experiment to reduce nonpoint source pollution loadings from agricultural drainage and polluted stream waters using wetland and pond system was performed. The removal rate of $BOD_5$, TSS, T-N and T-P during growing season was 7.2%, 64.3%, 57.0%, and 60.3%, respectively. And removal rate of $BOD_5$, TSS, T-N and T-P during winter was -49.5%, -56.1 %, 30.5%, and 47.1%, respectively. In this study, pond-wetland system is more effective than wetland-pond system to remove nutrient.

  • PDF

Removing of Phosphate, Nitrogen and Anion surfactants in the Wastewater using ALC (경량기포콘크리트를 이용한 인과 질소 및 음이온계면활성제 제거)

  • 홍영호
    • Journal of environmental and Sanitary engineering
    • /
    • v.16 no.1
    • /
    • pp.102-107
    • /
    • 2001
  • This research was carried out investigate the removed T-P, T-N and anion surfactants using Autoclaved Lightweight Concrete(ALC) in wastewater treatment system. Effects of pH, TDS on aqueous solution was measured. Specific area which measured by BET was $27.66m^2/g$. The phosphorous, nitrogen and anion surfactants removal efficiencies were examined by using artificial waste water(T-P : 66~73mg/L, T-N : 56~136mg/L and anion surfactants : 10~31mg/L). The results showed that the ALC was effective material as a adsorbent due to the structure and porosity. It was found that anion surfactants removed was 85~95%, phosphate removed was 92% and nitrogen removed was 90% in artificial wastewater. Agitation process was more effective than aeration process in that case of nitrogen removal system using ALC.

  • PDF

A Study on the Combined Treatment of Municipal Solid Waste Landfill Leachate (도시폐기물매립지침출수의 병합처리에 관한 연구)

  • 김동민;이병인
    • Journal of environmental and Sanitary engineering
    • /
    • v.11 no.1
    • /
    • pp.45-55
    • /
    • 1996
  • An experimental research was conducted in order to study the combined treatment o of municipal landfill leachate and municipal sewage. The landfill leachate was that of Nanjido landfill site, and the municipal sewage was that of Chungnang municipal sewage treatment plant in Seoul. Several sets of bench~scale sequencing batch reactor(SBR) were used as e experimental apparatus. Specially investigated items in this experiment were the removal efficiency of substrate and the influence of treatment time. The experiment lasted for about 2 years. The result are as follows ; 1. The characteristics of leachate were pH 7.5~8.2, BOD 80~336mg/L, COD 908~1,460mg/L, NH3-N 1,409~2,330mg/L, T~P 2.7~7.lmg/L, Cl~3,540~4,085mg/L, a and heavy metals are a very small amount. And the characteristics of sewage were pH 6.9~7.3, BOD 78.4~129.3mg/L, COD 121.2~305.0mg/L, T~N 14.9~36.4mg/L, T-P 2.3~8.9mg/L. 2. The treatability of leachate alone was not treat well. So for the good treatment of leachate, it was necessary to deal with the pretreatment before bi이ogical treatment and a combined treatment of municipal sewage. 3. The various contents of the leachate were 5%, 10%, 30%, and 50%, and the removal efficiency of COD was 86.0%, 82.8%, 60.6%, and 31.7%. The maximum content of the leachate which could be sucessfully treated by SBR in the combined treatment was 10% of that of sewage. And the removal efficiency of COD increased n notably, as its treatment time increased. 4. The various contents of the electrolytic treated leachate were 5%, 10%, 30%, and 50%, and the removal efficiency of COD was 89.9%, 86.1%, 79.2%, and 69.8%. The maximum content of the leachate which could be sucessfully treated by SBR in the combined treatment was 30 % of that of sewage. And the removal efficiency of C COD increased notably, as its treatment time increased.

  • PDF

Simultaneous Removal of Organic and Nitrogen in the Treatment of Fish Processing Wastewater using Entrapped Mixed Microbial Cell (EMMC) Process (Entrapped Mixed Microbial Cell (EMMC) 공정을 이용한 수산물 가공 폐수처리에서 유기물 및 질소 동시제거)

  • Jeong, Byung Cheol;Park, Kwon Sam;Jeong, Byung Gon
    • Journal of Korean Society on Water Environment
    • /
    • v.22 no.3
    • /
    • pp.492-497
    • /
    • 2006
  • Feasibility of simultaneous removal of organic materials and nitrogen in the wastewater from fisheries processing plant was evaluated using entrapped mixed microbial cell (EMMC) process. The experiment was performed using activated sludge from municipal sewage treatment plant which was immobilized with gel matrix by cellulose triacetate. It was found the stable operation at the treatment system which is composed of anoxic and oxic tank, was possible when the organic and nitrogen loading rates were increased stepwise. The organic and nitrogen loading rates were conducted from 0.65 to $1.72kgCOD/m^3/d$ and from 0.119 to $0.317kg\;T-N/m^3/d$ with four steps, respectively. The maximum nitrogen loading rate which could satisfy the regulated effluent standard of nitrogen concentration, was $0.3kg\;T-N/m^3/d$. The removal efficiency of total nitrogen was decreased apparently as increasing nitrogen loading rates, whereas the removal efficiency of ammonium nitrogen was effective at the all tested nitrogen loading rates. Therefore, it was concluded that nitrification was efficient at the system. Nitrate was removed efficiently at the anoxic tank. whereas the nitrification efficiency at the oxic tank ranged 94.0% to 96.9% at the tested loading rates. The removal efficiencies of chemical oxygen demand (COD) and those of total nitrogen at the entire system ranged from 94.2% to 96.6% and 73.4% to 83.4%, respectively.

The Effect of Plant Coverage on the Constructed Wetlands Performance and Development and Management of Macrophyte Communities (식생피도가 인공습지의 질소 및 인 처리효율에 미치는 영향과 습지식물의 조성 및 관리)

  • Ham, Jong-Hwa;Kim, Hyung-Chul;Koo, Won-Seok;Shin, Hyun-Bhum;Yun, Chun-Gyeong
    • Korean Journal of Ecology and Environment
    • /
    • v.38 no.3 s.113
    • /
    • pp.393-402
    • /
    • 2005
  • The field scale experiment was performed to examine the effect of plant coverage on the constructed wetland performance and recommend the optimum development and management of macrophyte communities. Four sets (each set of 0.88 ha) of wetland (0.8 ha) and pond (0.08 ha) systems were used. Water flowing into the Seokmoon estuarine reservoir from the Dangjin stream was pumped into wetland system. Water depth was maintained at 0.3 ${\sim}$ 0.5 m and hydraulic retention time was managed to about 2 ${\sim}$ 5 days; emergent plants were allowed to grow in the wetlands. After three growing seasons of the construction of wetlands, plant coverage was about 90%, even with no plantation, from bare soil surfaces at the initial stage. During the start up period of constructed wetlands, lower water levels should be maintained to avoid flooding newly plants, if wetland plants are to be started from germinating seeds. Effluent T-N concentration in low plant coverage wetland was higher in winter than high plant coverage wetland, whereas no T-P effluent concentration and removal efficiency difference was observed within 15% plant coverage. Dead vegetation affected nitrogen removal during winter because it is a source of organic carbon which is an essential parameter in denitrification. Biomass harvesting is not a realistic management option for most constructed wetland systems because it could only slightly increase the removal rate and provide a minor nitrogen removal pathway due to lack of organic carbon.