• Title/Summary/Keyword: Systems Engineering Management Plan

Search Result 409, Processing Time 0.03 seconds

A Study on Managing the Construction Process of Railway Safety Test Facilities Using the Systems Engineering Tool (전산지원도구를 이용한 철도안전 성능평가 시험설비 구축 사업 관리방안 연구)

  • Kim, Yun-Mi;Choi, Kyoung-Jin;Cho, Youn-Ok
    • Proceedings of the KSR Conference
    • /
    • 2008.06a
    • /
    • pp.1505-1510
    • /
    • 2008
  • A railway is a complex system integrated with a lot of technical elements such as trains, track facilities, human factors, operation & control and maintenance. As a mass transportation system, a railway could contain potential risks that may result in a high death rate and property losses. Accordingly, Railroad Safety Technology R&D Corps. is adopting the plan of the construction of Railway Safety Test Facilities as a part of the Railway Total Safety Project to enhance the railway safety, and carrying out researches on effective project management methods with Systems Engineering techniques. Recently, various systems engineering tools such as CORE or Cradle are applied to manage the system requirements and the project management process in the part of the aerospace engineering and automobile engineering so on. The railway industry also makes an effort to develop an efficient management skills using systems engineering tools as the railway system is multi-disciplinary. Therefore, we propose the more effectual management method of constructing the Railway Safety Test Facilities applying the systems engineering tool to the research.

  • PDF

Monitoring Management Plan for Changed Region with respect to Revision Periods (변화지역에 대한 갱신주기별 모니터링 운영방안)

  • Han, You Kyung;Yeom, Jun Ho;Kim, Yong Il;Lee, Byoung Kil
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.31 no.5
    • /
    • pp.401-410
    • /
    • 2013
  • Due to the increasing need for spatial information, there have been a lot of research related with monitoring and revision of changed regions for the acquisition of the accurate and latest information. In this paper, the optimal monitoring management plan for changed regions with respect to the revision periods was proposed. For this purpose, the representative monitoring methods, which are based on database, professional manpower and crowdsourcing of continuous revision, and aerial imagery, satellite imagery and LiDAR of cyclic revision, were investigated. Then, the properties and application status of monitoring systems in Korea were illustrated according to the methods. Finally, the optimal monitoring management plan for continuous and cyclic revisions was suggested through the comparison of properties and revisionable objects of each method. From the result, it was shown to be appropriate for the optimal monitoring management plan of continuous revision as using Internet-Architectural Information System (e-AIS) database cooperated with professional manpower and crowdsourcing, and cyclic revision as using domestic high-resolution satellite images and LiDAR data processed semi-automatically.

Developing the Management System of the Constructing Railway Safety Test Facilities Using the Model-Based Systems Engineering Approach (모델기반 시스템엔지니어링 접근을 통한 철도안전 시험설비구축 사업 관리체계 개발)

  • Kim, Yun-Mi;Choi, Kyoung-Jin;Cho, Youn-Ok
    • Proceedings of the KSR Conference
    • /
    • 2008.11b
    • /
    • pp.1964-1969
    • /
    • 2008
  • A railway is a complex system integrated with a lot of technical elements such as rolling stock, power, signal control, communications, tracks, stations, operation control systems, and so on. As a mass transportation system, a railway could contain potential risks that may result in a high death rate and property losses. Accordingly, Railroad Safety Technology R&D Corps. is adopting the plan of the construction of Railway Safety Test Facilities as a part of the Railway Total Safety Project to enhance the railway safety, and carrying out researches on effective project management methods with Systems Engineering techniques. To support that, we propose the more effectual management method of constructing the Railway Safety Test Facilities applying the model-based systems engineering tool to the research.

  • PDF

JAPANESE OFFICIAL DEVELOPMENT ASSISTANCE SYSTEM AND ITS IMPROVEMENT

  • Yoichi Hirota;Rajendra Niraula;Shunji Kusayanagi
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.849-854
    • /
    • 2005
  • After participation in the Colombo Plan in 1954, Japan has provided Official Development Assistance (ODA) to 185 countries and areas, and the accumulated amount of Japan's ODA is approximately US$ 221 billion for 50 years. Japan is the second largest ODA donor country in the world now. The country is contributing to the peace and development of the international community. However, the recipient government and the parties concerned are not always satisfied with the Japan's ODA system.. Especially the grant aid system is strongly based on the domestic public work system. This paper analyzes the problems and figures out solutions from the viewpoint of donor and the participant.

  • PDF

A Technology Readiness Level (TRL) Management using the Systems Engineering Tool for the Space Launch Vehicle (시스템엔지니어링 전산관리도구를 활용한 우주발사체 기술완성도(TRL) 관리)

  • Jang, Jun Youk;Kwon, Byung Chan;Lim, Chang Young;Cho, Dong Hyun;Yoo, Il Sang
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.16 no.1
    • /
    • pp.18-24
    • /
    • 2020
  • The KSLV-II project with high difficulties technically requires thorough technical management during long-term life cycle more than 10 years for launching into space. The TRL is a quantitative indicator developed by NASA widely used all over the world to measure technology maturity of a system development objectively and consistently. The TRL is also used to make sure technology level and to establish a future direction in the KSLV-II project. The TRL has advantage enable to identify a technology level through quantitative indicators. However, it takes a lot of efforts such as trials and errors, time and cost to apply it to the project considering the project environments, and stakeholder needs. These include not only to establish TRL management plan from ideal, conceptual and abstractive standards/guidelines such as NASA's, but also to construct TRL management environment enable to apply and manage harmoniously. In the KSLV-II project, it is required to figure out current technology level and technology development trend in the future, to access conveniently, to share related data in real time, and to update periodically for the comprehensive TRL management. From the reason above, the TRL management environment was built by using the systems engineering tool already has been used for other system management data such as requirements in the project. It also could be accomplished a practical management basis of systems engineering from the traceability among system management data including TRL. In this paper, case study results are introduced to manage the TRL for the space launch vehicle using the systems engineering tool in the KSLV-II project.

A Study on the Social Welfare ISO 9001/2000 Certificate (사회복지분야의 ISO 9001/2000 인증에 관한 연구)

  • Kim Bok-Man
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.27 no.4
    • /
    • pp.90-93
    • /
    • 2004
  • This paper is case study for ISO 9001/2000 quality management system certification of social welfare. We constructed quality management system for efficient operation for service quality improvement of welfare hall which is society welfare facilities. This paper evaluated operation actual conditions of "G" welfare hall which introduce and operates quality management system according to index of evaluate for society welfare hall and present improvement plan about effect and problem.

A Study on the Equipment Maintenance Management Support System for Production Efficiency (생산효율화를 위한 설비보전관리 지원시스템에 관한 연구 -설비보전정보시스템을 중심으로-)

  • 송원섭
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.21 no.48
    • /
    • pp.279-289
    • /
    • 1998
  • This study deals with the schemes of design, plan and operate maintenance management support systems and with the engineering approach for the solutions to build the maintenance management for the production efficiency. Maintenance Management Information System(MMIS) is the task that must focus on machinery historical data and planned maintenance action. Also the efficient supporting system in a maintenance management is achieved by database which is based on process of machinery's failure history. Designing method of maintenance management information system, maintenance modules are consisted of six factors ; machinery's historical data, lubrication control, check sheet, repair work, availability report, and performance report(control board and detailed reports), and then operators can rapidly utilize data in work place. In the implementation of designed model, program coding has been developed by Visual Basic 3.0. Data insertion, deletion and updating which perform menu screen is implemented by reading data from database. Implementation model based on LAN environment and related data is stored in Microsoft DBMS.

  • PDF

A Study on Establishment and Control of the Quality Control Policy (품질관리 방침의 설정과 관리에 관한 소고)

  • 이상억
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.8 no.11
    • /
    • pp.35-43
    • /
    • 1985
  • In this paper we will concentrate on the Quality Control Policy which should be enforced as a part of the Total Quality Control considers the global concepts, the establishment Procedures, and the evolution and operation of Quality control policy to achieve effectively it. For enforcement of the Qualify control policy shall be focused for considerations : (1) suggestion of the optimum control policy (2) suggestion of a comprehensive plan and promoting method quality control (3) suggestion of matters that need special consideration at the time of decision of a comprehensive management of control policy thereof. (4) A comprehensive Proposal (5) suggestion of a plan for progress of the Quality control system and the supplementary plan In the future, accordingly, establishment d its own policy control level is desirably more reasonable, and the Total Quality Control System that employes the control efficiency of periodical and systematic and rationalization and radical reform of the enterprise management problem as the restrictive conditions must be applied for quality control system.

  • PDF

Feeder Re-assign Problem in a Surface Mount Device with a Piano-Type Multi-Headed Gantry

  • Tae, Hyunchul;Kim, Byung-In
    • Industrial Engineering and Management Systems
    • /
    • v.12 no.4
    • /
    • pp.330-335
    • /
    • 2013
  • A surface mount device (SMD) assembles electronic components on printed circuit boards (PCB). Since a component assembly process is a bottleneck process in a PCB assembly line, making an efficient SMD plan is critical in increasing the PCB assembly line productivity. Feeder assignment is an important part of the SMD plan optimization. In this paper, we propose a feeder re-assign improvement algorithm for a specific type of SMD machine with a piano type multi-head gantry. Computational results on some real-world benchmark data sets show the effectiveness of our proposed algorithm.

En-Route Trajectory calculation using Flight Plan Information for Effective Air Traffic Management

  • Kim, Yong-Kyun;Jo, Yun-Hyun;Yun, Jin-Won;Oh, Taeck-Keun;Roh, Hee-Chang;Choi, Sang-Bang;Park, Hyo-Dal
    • Journal of Information Processing Systems
    • /
    • v.6 no.3
    • /
    • pp.375-384
    • /
    • 2010
  • Trajectory modeling is foundational for 4D-Route modeling, conflict detection and air traffic flow management. This paper proposes a novel algorithm based Vincenty's fomulas for trajectory calculation, combined with the Dijkstra algorithm and Vincenty's formulas. Using flight plan simulations our experimental results show that our method of En-route trajectory calculation exhibits much improved performance in accuracy.