• Title/Summary/Keyword: System life-cycle

Search Result 1,954, Processing Time 0.029 seconds

Constructing Database for Estimating Life Cycle CO2 emissions from Blast Furnace Slag (고로슬래그미분말의 전과정 CO2 배출원단위 평가 및 데이터베이스 구축)

  • Park, Jung-Hoon;Tae, Sung-Ho;Kim, Tae-Hyoung;Lee, Kang-Jin
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.05a
    • /
    • pp.49-51
    • /
    • 2012
  • This study was conducted as a part of database construction for development of CO2 assessment system for concrete to assess CO2 emissions and analyze characteristics of blast furnace slag manufactured in Korea through life cycle assessment method. For this, life cycle CO2 emissions assessment technique for construction materials was examined. The entire manufacturing process for blast furnace slag was analyzed on blast furnace slag manufacturer in Korea for application of assessment technique. Life cycle CO2 assessment was performed on blast furnace slag after classifying assessment process into raw material production step, raw material transportation step and construction material manufacture step.

  • PDF

Analysis of Teacher's Needs on a Life-cycle System of the Educational Digital Contents through a Case Study of EDUNET (에듀넷 사례를 통한 교육용 디지털 콘텐츠 수명주기에 대한 교사 요구사항 분석)

  • Cha, Hyunjin;Hwang, Yunja
    • The Journal of Korean Association of Computer Education
    • /
    • v.22 no.3
    • /
    • pp.101-112
    • /
    • 2019
  • This study aims to draw implications on a life-cycle system of digital contents through a case study about EDUNET in order to maintain the quality and efficiency of the service for educational digital contents in the primary and secondary education area. To achieve the objective, lead teachers in EDUNET service participated in requirements analysis about the life-cycle of the digital contents, for example, contents utilization periods, the periods for being updated, etc. From the results, it was found that a systematic life-cycle framework should be established to re-evaluate the contents in service and provide a quality of contents, responding to consistent changes for educational environments in teaching-learning and for educational topics/directions, or according to educational content's substance such as curriculum or extra-curriculum. This study contributes to suggesting needs to implement the systematic management of contents based on a life-cycle system by analyzing user's requirements in order to provide user-friendly service for the K-12 educational digital contents.

Environmental Effect Analysis for PV system using LCA (LCA를 이용한 태양광발전의 환경영향분석)

  • Choi, Bong-Ha;Park, Soo-Uk;Lee, Deok-Ki
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 2007.06a
    • /
    • pp.737-741
    • /
    • 2007
  • This paper analyses the environmental effect of 100kw PV system installed in Tibet using Life Cycle Assessment(LCA). Then, energy payback time(EPT) and life-cycle $CO_2$ emission rate are estimated based on life-cycle of the PV system. As a result of the estimation, 6 year of EPT and 20 g-C/kWh of $CO_2$ emission rate are obtained. In China, average $CO_2$ emission rate of fossil fuel power generation plant is 260 g-C/kWh. This shows that PV system would be very promising for global environmental issues. For advanced LCA, we need to collect detailed and various data about raw material of PV system.

  • PDF

Effective Implementation of Quality Management System through Life Cycle Model and Measurements of TL 9000 (TL 9000의 성과지표와 수명주기모형을 통한 효과적인 품질경영시스템의 적용방안)

  • 서창적;김정래
    • Journal of Korean Society for Quality Management
    • /
    • v.29 no.4
    • /
    • pp.1-17
    • /
    • 2001
  • The characteristics of Telecommunication Industry encompass not only hardware and software but also the service aspect of them. One way to improve the industry up to the international level in terms of hardware and software as well as service aspect is to comply with tile TL 9000 standard, which was established by QUEST Forum, the group consisted of U.S. communication industry, based on the ISO 9000 Quality Management System. In this study, design, establishment, implementation, maintenance and improvement of quality system for domestic telecommunication industry are thoroughly investigated based on TL 9000 standard, with its LCM(Life Cycle Model) model and measurements. Also, Process Approach is suggested to help the industry realize the system to meet its specific needs. In addition, specific examples with the successful certification to TL 9000 standard are presented.

  • PDF

Optimization of Redundancy Allocation in Multi Level System under Target Availability (목표가용도를 고려한 다계층 시스템의 최적 중복 설계)

  • Chung, Il-Han
    • Journal of Korean Society for Quality Management
    • /
    • v.41 no.3
    • /
    • pp.413-421
    • /
    • 2013
  • Purpose: System availability and life cycle cost are often used to evaluate the system performance and is influenced by the operation and maintenance characteristic. In this paper, we propose the method to improve life cycle cost and satisfy the target availability through redundancy allocation. Methods: We consider the redundancy is available at all items in multi level system. Thus, we assume that sub-assembly, module, components can be duplicated. Simulation and genetic algorithm are employed to optimize redundancy allocation. Results: Target availability is higher, the life cycle cost is increased. In addition, the items for redundancy are selected at higher level in multi level system if target availability is higher. Conclusion: We could know that target availability affects the duplication number of items and the selection of redundancy items. For further study, we will consider new optimization algorithms to compare with the proposed GA algorithm and improve optimization performance.

Environmental Effect Analysis for PV system using LCA (LCA를 이용한 태양광발전의 환경영향분석)

  • Choi, Bong-Ha;Park, Soo-Uk;Lee, Deok-Ki
    • New & Renewable Energy
    • /
    • v.3 no.2 s.10
    • /
    • pp.11-16
    • /
    • 2007
  • This paper analyses the environmental effect of 100kw PV system installed in Tibet using Life Cycle Assessment(LCA). Then, energy payback time(EPT) and life-cycle CO2 emission rate are estimated based on life-cycle of the PV system. As a result of the estimation, 6 year of EPT and 20 g-C/kWh of CO2 emission rate are obtained. In China, average CO2 emission rate of fossil fuel power generation plant is 260 g-C/kWh. This shows that PV system would be very promising for global environmental issues. For advanced LCA, we need to collect detailed and various data about raw material of PV system.

  • PDF

PLM System Development for Data Management of KSLV-II Program (한국형발사체개발사업 정보 관리를 위한 PLM 시스템 구축)

  • Kwon, Byung-Chan;Park, Chang-Su;Kim, Keun-Taek
    • Journal of Aerospace System Engineering
    • /
    • v.8 no.2
    • /
    • pp.49-54
    • /
    • 2014
  • The main purpose of Korea Space Launch Vehicle II(KSLV-II) Program is to develop a domestic launch vehicle that can deliver a 1.5ton class application satellite into a Low Earth Orbit(600~800km). The data management is an essential factor in systems engineering for success of large-scale complex systems development, and it systematically manages the information and technical data for the total life-cycle of a system. In this paper, data management policies and processes on KSLV-II program are presented, and product life-cycle management system for KSLV-II program is also presented.

Life Cycle Cost Analysis of Auxiliary Power Unit Developments for 8200 Series Electric Locomotive Based on Reliability (8200호대 전기기관차 보조전원장치 개발품의 신뢰도 기반 수명주기비용 분석)

  • Lee, Kye-Seung;Kim, Wan-il;Chang, Yoon-Woo;Kim, Jae-Moon
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.67 no.11
    • /
    • pp.1523-1529
    • /
    • 2018
  • Electric vehicles that are currently in operation are being produced domestically. Therefore, there is no great difficulty in receiving or repairing the failed parts or in the overall repair. On the other hand, most of the electric locomotives are manufactured by introducing the parts and technology of foreign vehicle manufacturers. In this paper, conducted a study about life cycle cost analysis of developed auxiliary power unit in 8200 series electric locomotive and suggested cost down method. This confirms the economic benefits of the developed products of the auxiliary power supply compared to the existing products. In addition, a sensitivity analysis of MTBF was conducted to suggest a life cycle cost down method.

A Study on the Effect of R&D Project Management System on R&D Project Performance: Focusing on the Mediating Effects of Integrated Management and Life Cycle Management (R&D 프로젝트관리시스템이 R&D 프로젝트성과에 미치는 영향에 대한 연구: 통합관리 실행 및 전주기관리 실행의 매개효과를 중심으로)

  • Jongho Won;Sungyong Choi;Heekyung Kim;Sohyun Park
    • Journal of Information Technology Services
    • /
    • v.22 no.3
    • /
    • pp.65-83
    • /
    • 2023
  • Due to the development of modern technology and the enlargement of industrial scale, the scale of many projects is expanding and the complexity is also increasing. Individual management of existing projects cannot effectively manage projects in this trend, and it is necessary to systematically manage the entire process from initiation to completion. Accordingly, the need for integrated management and life cycle management that can efficiently manage the entire project is emerging, and for this, a systematic project management system is also required. PMS enables efficient project management by linking business processes such as resource, schedule, scope, and output management of a project with separately separated infrastructure accordingly. In this paper, a research model was proposed to manage the project from the perspective of implementing integrated management and life cycle management, especially during R&D project execution, and to prove the mediating role between PMS and R&D project performance for this purpose. The proposed research model will be able to help companies and organizations that feel the need to implement integrated management and life cycle management and are preparing to build a PMS-type system or that have already been established to efficiently perform project management.