• 제목/요약/키워드: System Safety Process

검색결과 2,427건 처리시간 0.03초

무기체계 개발에서 시스템 안전성을 고려한 시험평가 프로세스의 개선에 관한 연구 (On the Improvement of the Test and Evaluation Process in the Weapon Systems Development with Systems Safety Incorporated)

  • 심상현;이채천
    • 대한안전경영과학회지
    • /
    • 제15권3호
    • /
    • pp.51-60
    • /
    • 2013
  • With the recent changes in the environment of weapon systems acquisition, the systems development is becoming more susceptible to a variety of risks. To cope with this situation, US DoD has been emphasizing the importance of constantly applying the test and evaluation (T&E) process throughout the whole life cycle of the weapon systems. In particular, the safety requirements are called for attention while dealing with system risks. To this end, the present paper is aimed at studying the T&E process which incorporates the systems safety in weapon systems development. Analyzing and modeling the relevant processes has made it possible to achieve the objective. As a case study, the model results were applied to the development of unmanned aerial vehicles.

LNG 저장탱크의 통합제어 안전관리 시스템에 관한 연구 (A Study on the Integrated Control and Safety Management System for a LNG Storage Tank)

  • 김청균
    • 한국가스학회지
    • /
    • 제9권1호
    • /
    • pp.44-50
    • /
    • 2005
  • 본 논문에서는 LNG저장탱크의 통압제어 안전관리 시스템에 대한 연구결과를 제시하고 있다. 통합제어 및 안전관리를 효과적으로 진행하기 위한 새로운 통합관리 시스템은 내부탱크로부터 유출되는 가스나 초저온 액체(LNG)에 의한 안전성과 누출문제를 제어하기 위해 온도, 압력, 진동과 같은 신호를 검지하고, 종합적으로 분석하여 시스템의 안전성을 확보할 수 있도록 개발된 것이다. 효율성과 안전성 향상측면에서 LNG저장탱크의 저장용량 증가경향과 최근에 발생된 저장탱크의 고장사례 고찰을 통하여, 기존의 측정장치와 안전장치는 개량되고, 새로운 기술개발이 필요하다는 것을 강조한다. 따라서 본 연구에서는 초대형 LNG저장탱크의 제어와 안전관리를 위해 새로이 개발된 통합제어 안전관리 시스템을 제시하고 있다. 이 시스템에서는 기존의 측정 및 안전장치에 대한 통합과 연계성 및 성능을 향상시키고, 특히 저장탱크 구조물의 변위량을 측정하여 안전성을 확보할 수 있도록 기능성을 새로이 추가하였다. 본 연구에서 개발된 통합제어 안전관리 시스템에 프로세스 통합관리 시스템(PIIS)을 연계하여 사용한다면, LNG 저장탱크의 안전성, 효율성, 생산성은 획기적으로 향상될 것이다.

  • PDF

중소건설사를 위한 클라우드 컴퓨팅 기반 EHS 통합관리시스템 프레임워크 개발 (The Framework Development of Cloud Computing-based Integrated EHS Management System for Small and Medium Construction Companies)

  • 서광규
    • 대한안전경영과학회지
    • /
    • 제12권4호
    • /
    • pp.139-143
    • /
    • 2010
  • The small and medium construction companies are facing potential EHS(Environment, Health & Safety) of major accidents to cause casualties or a financial loss and increasing social responsibility. So, they have to voluntarily accomplish the EHS management system rather than passively with regard to EHS regulation. In this study, the framework of integrated EHS management system is developed based on cloud computing, and construction companies are to materialize self-regulation EHS process of construction workplace and to standardize the total EHS business process using the developed system. The proposed system also provides risk analysis, education/control and continuous improvement for EHS tasks and users can easily access the system on the web at a low price through cloud computing service. Eventually, the integrated system contributes to the managerial improvement by minimizing economic and physical loss caused by construction accidents.

PRESS 공정의 컴퓨터 통합 안전 진단시스템 구축에 관한 연구 (The Development of Computer Integrated Safety Diagnosis System for Press Process)

  • 강경식;나승훈;김태호
    • 산업경영시스템학회지
    • /
    • 제18권36호
    • /
    • pp.175-182
    • /
    • 1995
  • Industrial safety management program can be divided three part that is education, technology, and management. The effectiveness of a industrial safety management program depends on the ability to manage hardware which is technology and software, education and management, In this research, it will be described that how to design and develop Computer Integrated Safety System and Computer Based Training System for Press operations which is how to integrated industrial safety program wi th production planning and control in order to control efficiently using personnel computer system.

  • PDF

공정안전관리(PSM) 대상 사업장의 안전관리 개선 연구 (A Study on the Improvement of Safety Management in the Workplaces Subject to Process Safety Management (PSM))

  • 박종훈
    • 한국재난정보학회 논문집
    • /
    • 제19권3호
    • /
    • pp.490-497
    • /
    • 2023
  • 연구목적: 우리나라는 1990년대 이후 중대 산업사고 예방을 위해 유해 위험방지계획서 시행, 공정 안전관리 제도 시행 등 여러모로 노력해 오고 있으나 최근의 일련의 중대 산업사고는 그 한계를 보여주고 있다. 그래서 본 연구는 PSM 대상사업장의 안전관리 개선을 위한 대책을 제시하고자 한다. 연구방법: 산업재해 현황, 선행연구조사, PSM 대상사업장 재해 현황과 사고 발생 현황, PSM 대상사업장 안전관리 개선에 관한 선행연구와 사례를 조사하여 기존의 안전관리를 기반으로 PSM 대상사업장 안전관리에 대한 개선방안을 수립하였다. 연구결과: PSM대상사업장의 안전관리 개선을 위한 조직문화구축, 재난발생시 대응시스템, 체계적 안전관리, 노후설비교체 및 점검강화, 안전에 대한 경영자의 확고한 의지등의 대책을 제시하였다. 결론: 본 연구를 통하여 소중한 생명과 피해를 줄이기위한 안전확보 체계화방안을 제시한 것으로 의미를 가지며 각 사업장별로 PSM개선방향을 고찰하는데 활용성을 가질것으로 기대한다.

TOC Thinking Process를 활용한 철도종합안전심사 안정화방안 연구 (Applying the TOC Thinking Process: A Study for Stabilization of Integrated Railway Safety Audit System)

  • 오인택;장성용
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2006년도 추계학술대회 논문집
    • /
    • pp.990-1003
    • /
    • 2006
  • To cope with the change of railway safety environment and to prevent the catastrophic accident, the railway safety management system was established through the legislation of railway safety rules. And to audit and evaluate the accomplishment of railway safety rules by the railway operators, the Integrated Railway Safety Audit System(IRSAS) has been conducting. This study find out the strategy to stabilize the IRSAS by applying Theory of Constraints(TOC) Thinking Process. For meeting the IRSAS's goal of effective levelling up of railway safety, the two necessary conditions, 1)the secure of substantial safety through the IRSAS and 2)the execution of efficient IRSAS, should be fulfilled. Estimated undesirable effects(UDEs) from the IRSAS were identified, and 3 of them were selected for creating the requisite conflict clouds. Entities from these conflict clouds were synthesized into a core conflict cloud that foamed the base of Current Reality Tree. The strategic direction for change extracted from the conflict cloud is the reinforcement of IRSAS preparation system including the level up of operator's self audit, the deepening of preliminary survey, the establishment of complementing system of audit check list and the build up of auditor's specialization. These injection were logically validated via a Future Reality Tree and expected to be confirmed by further progressing of IRSAS.

  • PDF

오토자일렌과 노말펜탄올 계의 최소자연발화온도 측정 (Measurement of Autoignition Temperature of o-Xylene+n-pentanol System)

  • 하동명;이성진
    • 한국안전학회지
    • /
    • 제21권4호
    • /
    • pp.66-72
    • /
    • 2006
  • An accurate knowledge of the AITs(autoignition temperatures) is important in developing appropriate prevention and control measures in industrial fire protection. The measurement of AITs are dependent upon many factors, namely initial temperature, pressure, vessel size, fuel/air stoichiometry, catalyst, concentration of vapor, ignition delay time. The values of the AITs used process safety are normally the lowest reported, to provide the greatest margin of sefety. This study measured the AITs of o-xylene+n-pentanol system from ignition delay time by using ASTM E659-78 apparatus. The experimental AITs of o-xylene and n-pentanol were $480^{\circ}C\;and\;285^{\circ}C$, respectively. The experiment AITs of o-xylene+n-pentanol system were a good agreement with the calculated AITs by the proposed equations with a few A.A.D.(average absolute deviation).

On the Ensuring Safety and Reliability through the Application of ISO/PAS 21448 Analysis and STPA Methodology to Autonomous Vehicle

  • Kim, Min Joong;Choi, Kyoung Lak;Kim, Joo Uk;Kim, Tong Hyun;Kim, Young Min
    • International Journal of Internet, Broadcasting and Communication
    • /
    • 제13권3호
    • /
    • pp.169-177
    • /
    • 2021
  • Recently, the use of electric and electronic control systems is increasing in the automobile industry. This increase in the electric and electronic control system greatly increases the complexity of designing a vehicle, which leads to an increase in the malfunction of the system, and a safety problem due to the malfunction is becoming an issue. Based on IEC 61508 relating to the functional safety of electrical/electronic/programmable electronics, the ISO 26262 standard specific to the automotive sector was first established in 2011, and a revision was published in 2018. Malfunctions due to system failure are covered by ISO 26262, but ISO/PAS 21448 is proposed to deal with unintended malfunctions caused by changes in the surrounding environment. ISO 26262 sets out safety-related requirements for the entire life cycle. Functional safety analysis includes FTA (Fault Tree Analysis), FMEA (Failure Mode and Effect Analysis), and HAZOP (Hazard and Operability). These analysis have limitations in dealing with failures or errors caused by complex interrelationships because it is assumed that a failure or error affecting the risk occurs by a specific component. In order to overcome this limitation, it is necessary to apply the STPA (System Theoretic Process Analysis) technique.

Tolerable Hazard Rate 도출을 위한 정량적 분석 기법 검토 (Several Quantitative Methods in order to Derive Tolerable Hazard Rate)

  • 정의진;김양모
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2003년도 춘계학술대회 논문집 전기기기 및 에너지변환시스템부문
    • /
    • pp.438-440
    • /
    • 2003
  • It is very important to ensure system safety during the process of developing a system. Railway system is also devoting a great portion for the safety. Nowadays many countries leading railway industry have their own system assessment process according to the situation of their train control system. In this Paper, several methods to derive Tolerable Hazard Rate are represented in the railway signalling system the characteristics of those methods are also considered respectively.

  • PDF

크실렌 산화공정 냉각장치의 고장진단 전문가시스템의 구축 (An Establishment of Expert System for Fault Diagnoses of the Cooling System In the Xylene Oxidation Reaction Process)

  • 심종칠;김창은;주용준
    • 한국안전학회지
    • /
    • 제11권4호
    • /
    • pp.54-63
    • /
    • 1996
  • We establish an expert system for the xylene oxidation reaction process of chemical plants using HAZOP(Hazard and Operability Studies). Our research focus Is only reduced to the cooling system of the total chemical plant due to lack of information. This expert system shows the priority of reasons for the system failure using confidence factor.

  • PDF