• 제목/요약/키워드: System Installation

검색결과 5,021건 처리시간 0.039초

지중송전선로 병행지선 최적 설치 방안에 관한 연구 (A Study on Optimal Installation Method of Earth Continuity Conductor on Underground Power Cable Systems)

  • 정채균;강지원;윤종건;김양상
    • 전기학회논문지
    • /
    • 제58권9호
    • /
    • pp.1689-1694
    • /
    • 2009
  • In a previous paper, the characteristics of ECC (earth continuity conductor) have been analysed for reducing the level of induced sheath voltage considering the dimension and position of ECC, the spacing between ECC and three phase cables, and the use of two ECC conductors at the single point boned section of underground power cable system. From these results, the study conditions for optimal installation has been selected such as installation section, conductor size and etc. In this paper, 5 cases which are set by possible installation conditions are tested based on previous research results. Finally, the optimal installation method of ECC is selected on underground power cable systems.

경제성분석을 이용한 접촉폭기방식 중수도의 설치규모분석에 관한 연구 (Study on Installation Capacities of Wastewater Reclamation and Reusing System Applying to Contact Aeration Process using Cost-benefit Analysis)

  • 남영우;박태욱
    • 대한환경공학회지
    • /
    • 제22권11호
    • /
    • pp.1945-1954
    • /
    • 2000
  • 접촉폭기방식 중수도를 설치할 때 발생하는 비용과 편익의 현재가치를 이용한 경제성분석을 통해 서울특별시와 6개 광역시의 지역별 설치규모분석을 수행하였다. 사적 편익을 고려한 접촉폭기방식 중수도의 설치규모는, 가정용일 경우, 부산은 일일 중수사용량이 $500m^3$, 대구는 $1,000m^3$ 및 광주는 $2,000m^3$ 이상일 때 경제성이 있는 것으로 나타났다. 그러나 서울, 인천, 대전 및 울산은 $3,000m^3$ 이상에서도 경제성이 없어 단독공급 방식보다는 대단지 공동주택의 지역순환방식으로 시설을 설치해야 할 것으로 판단된다. 업무용의 경우 서울, 부산 및 광주는 일일 중수사용량이 $100m^3$ 이상, 대구, 인천, 대전 및 울산은 $300m^3$ 이상일 때 경제성이 있다. 영업용의 경우 서울, 부산, 대구, 광주, 대전 및 울산은 중수사용량이 $100m^3$ 이상이고 인천은 $300m^3$ 이상일 때 경제성이 있는 것으로 나타났다. 사회적 편익을 고려한 접촉폭기방식 중수도의 설치규모는 일일 중수사용량이 $100m^3$ 이상일 때 경제성을 갖는 것으로 나타났다.

  • PDF

BES를 이용한 연동형 온실의 냉·난방 부하 산정 및 PV 시스템 발전 성능 분석 (Estimation on Heating and Cooling Loads for a Multi-Span Greenhouse and Performance Analysis of PV System using Building Energy Simulation)

  • 이민형;이인복;하태환;김락우;여욱현;이상연;박관용;김준규
    • 생물환경조절학회지
    • /
    • 제26권4호
    • /
    • pp.258-267
    • /
    • 2017
  • The price competitiveness of photovoltaic system (PV system) has risen recently due to the growth of industries, however, it is rarely applied to the greenhouse compared to other renewable energy. In order to evaluate the application of PV system in the greenhouse, power generation and optimal installation area of PV panels should be analyzed. For this purpose, the prediction of the heating and cooling loads of the greenhouse is necessary at first. Therefore, periodic and maximum energy loads of a multi-span greenhouse were estimated using Building Energy Simulation(BES) and optimal installation area of PV panels was derived in this study. 5 parameter equivalent circuit model was applied to analyzed power generation of PV system under different installation angle and the optimal installation condition of the PV system was derived. As a result of the energy simulation, the average cooling load and heating load of the greenhouse were 627,516MJ and 1,652,050MJ respectively when the ventilation rate was $60AE{\cdot}hr^{-1}$. The highest electric power production of the PV system was generated when the installation angle was set to $30^{\circ}$. Also, adjustable PV system produced about 6% more electric power than the fixed PV system. Optimal installation area of the PV panels was derived with consideration of the estimated energy loads. As a result, optimal installation area of PV panels for fixed PV system and adjustable PV system were $521m^2$ and $494m^2$ respectively.

서울시 한강교량의 태양광발전시스템 적용 시 경관조명 에너지 절약에 관한 경제성 분석 및 고찰 (An Economic Analysis and Consideration on the Application of Photovoltaic System for Bridge Nightscape Energy Savings at Han River in Seoul)

  • 박윤민;홍성관;최안섭
    • 조명전기설비학회논문지
    • /
    • 제25권1호
    • /
    • pp.42-49
    • /
    • 2011
  • PV(Photovoltaic) system is environmentally friendly power system using solar energy in renewable energy. PV system compared to other renewable energy power generation systems is relatively easy to install, so the dissemination is increasing worldwide. Especially, BIPV(Building Integrated Photovoltaic) is a system that PV modules are installed on the building and use renewable energy. But this system is difficult to apply due to the shadow of adjacent buildings and limited installation. In this study, payback period is calculated by Retscreen 2010, that is an economic assessment software of renewable energy, on applied to the bridge of PV system. As results, this study aims at actively considering the application.

휴대 가능한 Lonworks 네트워크 설치 장비의 설계 (Design of portable Lonworks Network Installation Tool)

  • 이희찬;김명균
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2006년 학술대회 논문집 정보 및 제어부문
    • /
    • pp.127-129
    • /
    • 2006
  • The distributed control system is used in wide control fields. Factory automation, home network and building automation are good examples. Lonworks that Echelon company has been developing and providing since 1991 is one of popular distributed control systems. Lonwork system is support various communication media, especially it has a feature that supports communication through the power line. When Constructing Lonworks network in a construction field, the experts, who can treat Lonworks bring laptops that LNS and Lonmaker installed, install the network. However this way takes long time to construct the network and needs the experts. To resolve this problem, this paper suggests that a design of Lonworks network installation machine that is easy to use for everyone and portable. Non-experts can install Lonworks network by using this machine so they can reduce fare for installation of network and time to install.

  • PDF

Numerical analysis results of the cathodic protection for the underground steel pipe by anode installation method

  • Jeong, Jin-A;Choo, Yeon-Gil;Jin, Chung-Kuk;Park, Kyeong-Wan
    • Journal of Advanced Marine Engineering and Technology
    • /
    • 제38권10호
    • /
    • pp.1212-1216
    • /
    • 2014
  • This study aims to find out the best anode location for buried pipelines. Numerical simulation program known as CATPRO (Elsyca, Belgium) were used for confirming the best location of anodes and the effects of impressed current cathodic protection system. Applied conditions for numerical simulation were similar to on-site environmental conditions for optimal application of cathodic protection system. Used criterion of cathodic protection was NACE SP 0169, which describes that minimum requirement for cathodic protection is -850mV vs. CSE. Various layouts for anodes' installation were applied, which were distance between anodes, anode installation location, and applied current. The areas where cathodic protection potential was lower than -850mV vs. CSE was limited up to 50m from anode installation locations. It was founded numerical analysis obtain cost-effective and efficient cathodic protection methods before design and application the impressed cathodic protection system to on-site environment.

가공 배전선로 중성선과 가공지선 겸용시의 임펄스 특성 연구 (The Study on the Impulse Characteristic of Secondary Arresters in Power Distribution System)

  • 강문호;김동명;송일근;천성남
    • 한국조명전기설비학회:학술대회논문집
    • /
    • 한국조명전기설비학회 2004년도 학술대회 논문집
    • /
    • pp.297-299
    • /
    • 2004
  • In multi-ground distribution system, overhead ground wire and neutral wire are parallel connected to offer the electrical power energy and protect damage of lightning strokes. Therefore a case where the two wires become single wire, the power company can get the benefit such as installation cost saving and line fault protection by simplify of distribution line. In this paper we describe the result of impulse test in both system ; one is the present power system the other is unified power system parallel connected overhead ground wire and neutral wire. As a result of this impulse test, the present power system get lower impulse voltage than the unified power system.

  • PDF

수동운전 모드에서 정위치 정차 방법 및 연동 시스템 (System and method for accurate train stop in manual operation mode)

  • 손영진;안청모;정동윤;박병노
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2004년도 춘계학술대회 논문집
    • /
    • pp.1504-1506
    • /
    • 2004
  • The platform screen door(PSD) hasn't been installed yet within the manual operation system, that is, ATS & ATC Signal system. In other countries, it is mostly installed and operated within automatic operation system, that is, ATO. Especially, as a part of the environment friendly system installation, the installation of PSD shall be considered aggressively to improve the air quality in the underground area and to maintain the air-conditioning. Besides the number of suicides in the subway station gets increased these days causing safety hazard, so the installation of PSD is positively reviewed. To install PSD in the manual operation system, it is important to stop the train at the correct position. So we would like to suggest the technical system thereby.

  • PDF

대규모 무정전 전원공급 시스템의 구성방안 (The Configurations of the large scale UPS system)

  • 송언빈;윤병도
    • 한국조명전기설비학회:학술대회논문집
    • /
    • 한국조명전기설비학회 1991년도 추계학술발표회논문집
    • /
    • pp.80-83
    • /
    • 1991
  • The need of UPS (Uninterruptible Power Sup-ply) system is dramatically increasing with the increased use of computers, telecommunica-tion system, building automation system, and office automation system in office buildings. The consequence of the power failure is very disas trous in intelligent office buil-dings. Thus, the nucessity of large scale UPS system with generations of large scale UPS system with generator is increasing. In this study, the configurations of large scale UPS system are reviewed and analyzed. The design guide and technical considerations of high reliability system are presented.

  • PDF

UPFC 설치사례 연구 (Case Study for UPFC Installation)

  • 최종윤;홍순욱;이학성;윤종수
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2001년도 춘계학술대회 논문집 전력기술부문
    • /
    • pp.297-300
    • /
    • 2001
  • This paper describes case studies for UPFC installation, The studies include UPFC at Inez, KT, CSC at Marcy, NY, and UPFC at Kangjin, Korea. For each case, engineering about problem of power system and benefits of UPFC installation are presented. And operation policy of Kangjin UPFC will be established by engineering of power system.

  • PDF