• Title/Summary/Keyword: System Capacity

Search Result 8,716, Processing Time 0.04 seconds

Heating and Hot Water Supply Energy Comparison of Medium Capacity and Multi Boilers System applied to Military Officer Housing (군간부 숙소에 적용된 중용량 및 멀티 보일러 시스템의 난방 및 급탕에너지 비교)

  • Kim, Min-Yong;Kim, Young Il;Chung, Kwang Seop
    • Journal of the Korean Society for Geothermal and Hydrothermal Energy
    • /
    • v.10 no.3
    • /
    • pp.8-16
    • /
    • 2014
  • Heating and hot water supply energy consumption of medium and multi boiler systems applied to military officer housing are compared with in-situ experiment and TRNSYS dynamic simulation program. In a multiple boiler system, small capacity boilers are connected in parallel to meet the required capacity. For handling partial loads, medium capacity boiler relies on on-off control, while multi boiler adopts PI control. Since multi boiler has higher efficiency and better control strategy, the results show that energy consumption can be reduced significantly with the multi boiler system.

Test and Analysis of Voltage Drop according to Load Capacity in Traction Power Supply System (전기철도 일형식 부하 크기에 따른 전압강하 측정 및 분석)

  • Kim, Joo-Rak;Jang, Dong-Uk;Chang, Sang-Hoon;Lee, Young-Heum
    • Proceedings of the KSR Conference
    • /
    • 2011.05a
    • /
    • pp.940-947
    • /
    • 2011
  • Load capacity varies according to a day of the week in traction power supply system, because time schedule in railway is changed as demand for passengers and freights. Therefore, Voltage drop also varies as load capacity. In Korea railway, Voltage collected from catenary in train is decreased, as load supplied traction power supply system is increased. Therefore, investigation about voltage drop should be performed, before development of countermeasure against voltage drop. The investigation can be performed by simulation or field test. Naturally, field test is more precise than simulation. In addition, field test should be carried out at peak load. This paper presents test and analysis about voltage drop in railway. The test is performed in both a day of the week and weekend. The analysis is figured out comparison load capacity between two days and voltage drop across terminal.

  • PDF

Traffic Capacity Estimate of Personal Rapid Transit System based on Digraph Model (소형자동궤도차량 시스템의 그래프 모델 기반 수송능력 추정)

  • Won, Jin-Myung
    • Journal of Institute of Control, Robotics and Systems
    • /
    • v.13 no.3
    • /
    • pp.263-267
    • /
    • 2007
  • This study proposes a new methodology to estimate the traffic capacity of a personal rapid transit(PRT) system. The proposed method comprises three steps. The first step models the guideway network(GN) of PRT as a digraph, where its node and link represent a station and a one-way guideway link between two stations, respectively. Given local vehicle control strategies, the second step formulates the local traffic capacities through the nodes and links of the GN model. The third step estimates the worst-case local traffic demands based on a shortest-path routing algorithm and an empty vehicle allocation algorithm. By comparing the traffic estimates to the local traffic capacities, we can determine the feasibility of the given GN in traffic capacity.

Capacity Analysis of MMR(Mobile Multihop Relay) System (MMR(Mobile Multihop Relay) 시스템의 용량 분석)

  • Lee, Kang-Won;Kook, Kwang-Ho;Choi, Song-In
    • IE interfaces
    • /
    • v.21 no.2
    • /
    • pp.189-197
    • /
    • 2008
  • This study shows achievable capacity gain from the MMR system. Relay stations are placed along the cell boundary in tiers. We can have as many tiers of relays and as many relays in each tier as we want. A model is developed, which can estimate the system capacity varying the number of relays in each tier and the bandwidths allocated to the BS and the RS. It is shown that maximum capacity increases are 21.5% and 18.9% when we have relays in the first tier only and in the first and the second tiers, respectively.

Analysis on the Application Capacity of the Superconducting Fault Current Limiter considering Reclosing and Fault Current (전력계통에 초전도한류기 적용시 차단용량 확보를 위한 초전도한류기 적용방안 연구)

  • Kim, Jin-Seok;Lim, Sung-Hun;Kim, Jae-Chul
    • Proceedings of the KIEE Conference
    • /
    • 2015.07a
    • /
    • pp.592-593
    • /
    • 2015
  • Recently, the fault current has increased to exceed the rated breaking capacity of protective device due to the growth of the power demand on the power system where is changed into the loop-, mesh-, network grid. To limit fault current, the superconducting fault current limiter (SFCL) is announced with various methods. In many researches, the current limiting effect with the SFCL has been analyzed considering the rated breaking capacity of the CB with one fault condition. However, the power system has various short circuit and operation conditions. In order to select the capacity of the SFCL with reclosing operation and burden of the fault current on the protective device, the characteristics of the power system were investigated. Through the analysis, the evaluation method of the current rate was improved.

  • PDF

Implementation of Finite Capacity-Driven MRP-C System (한정된 제조자원능력을 고려한 MRP-C 시스템 적용)

  • 김동규;박재현;강경식
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.22 no.51
    • /
    • pp.117-127
    • /
    • 1999
  • Modern production control systems based on MRPⅡ (Manufacturing Resource planning) didn't solved about the capacity and lead time problems. In the past, It solved that problems under deterministic. Therefore, the problem about determination of correct lead time and finite capacity are studied continuously by researchers. Now, we need to a integrated method that is from low level to high level instead of top-down in MRP. In this research uses the MRP-C(Capacitated Material Requirement Planning) concept that is more efficient then MRP system for capacity and flexible lead time , and shows the MRP-C algorithm and the prototype.

  • PDF

A New Approach to Get the Optimum Channel Capacity in MIMO Systems

  • Su, Pham-Van;Tuan, Le-Minh;Giwan Yoon
    • Proceedings of the Korean Institute of Information and Commucation Sciences Conference
    • /
    • 2002.11a
    • /
    • pp.317-319
    • /
    • 2002
  • In this paper, a new method to get the optimum channel capacity of a Multiple-Input Multiple-Output (MIMO) system is presented. The proposed method exploits the diagonal structure o f channel matrix in order to maximize the channel capacity. The diagonal format of the channel matrix is formed by multiplying the transmitted signal with the precompensated channel (PCC) matrix. Numerical simulations show that the proposed method exploiting the diagonal structure of channel matrix could significantly increase the system capacity compared with the system without applying the diagonal structure of channel matrix.

  • PDF

Calculating the Optimal Capacity of Energy Storage System to Reduce CO2 Emission for Power System in Je-Ju (제주지역 전력계통에 설치되는 에너지 저장장치의 용량별 CO2 절감량 및 최적용량 산정)

  • Lee, Jong-Hyun;Seol, So-Yeong;Ko, Won-Suk;Choi, Jung-In;Bae, Si-Hwa;Hong, Jun-Hee
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.59 no.7
    • /
    • pp.1232-1236
    • /
    • 2010
  • In this Paper, optimal capacity of energy storage and amount of $CO_2$ reduction in Jeju is calculated. Based on electricity demand data of Je-Ju from 2006 to 2007, the estimation electricity demand from 2009 to 2018 is performed. To calculate the amount of maximum $CO_2$ reduction and energy storage capacity in Jeju, the 4th power supply planning and IPCC guideline are used. Finally, Optimal capacity of energy storage and the amount of $CO_2$ reduction are showed.

Optimization of Battery Storage Capacity with Min-Max Power Dispatching Method for Wind Farms

  • Nguyen, Cong-Long;Kim, Hyung-Jun;Lee, Tay-Seek;Lee, Hong-Hee
    • Proceedings of the KIPE Conference
    • /
    • 2013.07a
    • /
    • pp.238-239
    • /
    • 2013
  • It is a crucial requirement to utilize an economical battery capacity for the wind energy conversion system. In this paper, the optimal BESS capacity is determined for the wind farm whose dispatched power is assigned by the min-max dispatching method. Based on a lifetime cost function that indicates the BESS cost spent to dispatch 1kWh wind energy into grid, the battery capacity can be optimized so as to obtain the minimum system operation cost. Moreover, the battery state of charge (SOC) is also managed to be in a safe operating range to ensure the system undamaged. In order to clarify the proposed optimizing method, a 3MW permanent magnet synchronous generator (PMSG) wind turbine model and real wind speed data measured each minute are investigated.

  • PDF

A Study on the Generating Capacity Expansion Characteristics in Jeju Island (제주지역 전력공급 대안과 특성분석)

  • Kim, C.S.;Rhee, C.H.
    • Proceedings of the KIEE Conference
    • /
    • 2004.11b
    • /
    • pp.275-277
    • /
    • 2004
  • Although Jeju island Is connected with main network system by HVDC cable line, it's network assumes the form of independent system in an operating point of view. Therefore Jeju needs it's own independent capacity expansion planning. Continuos growth of demand and increase of antiquated plants in Jeju requires additional generating capacity. This paper analyzes characteristics of two alternatives which include it's own expansion of facilities and capacity expansion of network system for Jeju island. Furthermore this paper evaluates economic efficiency of those alternatives and analyzes long-term program of demand-supply of electricity.

  • PDF