• Title/Summary/Keyword: System Budget

Search Result 1,490, Processing Time 0.028 seconds

Pavement Maintenance System Through using the Permutation Algorithm (순열알고리즘을 이용한 도로포장의 유지보수)

  • Jang-Rak, Kim;Sang-Yum, Lee;Sungho, Mun
    • International Journal of Highway Engineering
    • /
    • v.16 no.5
    • /
    • pp.67-72
    • /
    • 2014
  • PURPOSES : This study focuses on conducting pavement rehabilitation for more deteriorated roads given a limited government budget. METHODS : Therefore, we apply a optimization programming model of the permutation algorithm used for rehabilitating more deteriorated pavement areas, which is subjected to the limited budget. RESULTS : The permutation algorithm was evaluated in terms of determining the maximized rehabilitation of deteriorated pavement areas, using the newly developed performance models such as fatigue cracking, rutting, international roughness index(IRI) through the surveying data from 2006 to 2012. When compared with a traditional model of the so-called worst-first sequence(WFS) method, the permutation algorithm worked better than the WFS method, resulting in covering more deteriorated pavement areas given the limited government budget. CONCLUSIONS : Through a case study, it could be concluded that the permutation algorithm provides more reliable results in terms of rehabilitating more deteriorated pavement areas given the limited budget.

Comparison of Daily Soil Water Contents Obtained by Energy Balance-Water Budget Approach and TDR

  • Rim, Chang-Soo
    • Korean Journal of Hydrosciences
    • /
    • v.8
    • /
    • pp.57-68
    • /
    • 1997
  • The daily soil water contents were obtained from the time domain reflectometry(TDR) method and energy balance-water budget approach with eddy correlation at the two small semiarid watersheds of Lucky Hills and Kendall during the summer rainy period. There was a comaprison of daily soil water content measured and estimated from these two different approaches. The comparison is valuable to evaluate the accuracy of current soil water content measuring system using TDR and energy balance-water budget approach using eddy correlation method at a small watershed scale. The degree of simiarity between the regressions of these two methods of measuring soil water content was explained by determining the correlations between these methods. Simple linear regression analyses showed that soil water content measured from TDR method was responsible for 58% and 63% of the variations estimated from energy balance-water budget approach with edy correlation at Lucky Hills and Kendall, respectively. The scatter plots and the regression analyses revealed that two different approaches for soil water content measurement at a small watershed scale have no significant difference.

  • PDF

A Study on Budget Decision Model for Initial Provisioning Spare Parts (초기보급 예비부품을 위한 예산결정 모델연구)

  • Hwang Heung-Seok
    • Journal of the military operations research society of Korea
    • /
    • v.16 no.2
    • /
    • pp.75-82
    • /
    • 1990
  • When the new equipment or weapon system is introduced to the operating unit its repair facilities and spare parts supply channels are not regularly generated. therefore, its required spare parts are initially supplied at the same time when the main equipment is deployed. For these circumstances, we are faced with the following problems : the first one is to decide the budget amounts to acquire the spare parts, the second is to choose the amounts of initial provisioning spare parts, and the third one is how to allocate the given budget for the initial provisioning spare parts. This paper emphasizes on determining the budget amounts, but also suggests the spare parts allocating methods.

  • PDF

A Study on Link Budget Analysis of Wireless UWB Ranging System (무선 UWB 거리인식 시스템을 위한 Link Budget 분석에 관한 연구)

  • Roh, Jae-Sung;Shin, Yu-Sub
    • Proceedings of the Korea Information Processing Society Conference
    • /
    • 2011.04a
    • /
    • pp.659-661
    • /
    • 2011
  • 최근 WPAN 분야의 솔루션인 IEEE 802.15.4a는 저소비 전력으로 통신과 거리측정을 동시에 가능케 하는 PHY 제정을 목표로 하고 있다. 본 논문은 IEEE802.15.4a 물리계층에서 사용하는 UWB 신호를 대상으로 거리인식 시스템을 위한 Link Budget을 분석한다. 거리인식 시스템의 성능은 무선 채널의 다중경로 프로파일에도 관계된다. 따라서 본 연구에서는 IEEE 802.15.4a 채널 특성인 Residential 및 Office 환경을 고려하여 거리인식 시스템을 위한 Link Budget을 분석하였으며 연구된 내용은 다양한 거리추정 방식에 적용하여 거리추정 정밀도 향상에 기여할 수 있을 것이다.

A Study on the Improvement of Classification System for the Budget Management of the Environmental R&D (환경 R&D 예산관리를 위한 환경기술분류체계 개선에 관한 연구)

  • Kang, Sung Goo;Kim, Young-Soo;Jung, Sung Hoon
    • Clean Technology
    • /
    • v.11 no.2
    • /
    • pp.91-104
    • /
    • 2005
  • We studied more effective Environmental R&D management system which can be used in the budget allocation of the national R&D budget by the newly opened governmental administration system of science and technology. As a first step, we surveyed classification systems for the environmental technology which can be applied to the analysis of the national R&D budget. Each organization, either inland and oversea, has its own classification system for the environmental technology. However, we found that each systems can lead different results. It would be beneficial if an efficient standard classification system could be generated. The new system classified the environmental technology by the environmental management area(media) like most present systems rather than by the technical characteristics. The new system included all the areas of the environmental management and maintained consistent principles. The new system would help efficient management of the national R&D of the environment technology, if the national standard classification can be changed by the new system. To the researchers and professionals the new system will help them noticing the status of the environmental R&D and avoiding duplicate research, so that they can do research more efficiently and can achieve maximized results.

  • PDF

A Study on the Programs of the Betterment in Medical Care Guarntee for Korean Seniors (한국 노인의료보장제도의 개선방안에 관한 연구)

  • Cho Young-Hwan;Kim Hyun-Joo;Park Young-Han
    • The Journal of Korean Physical Therapy
    • /
    • v.10 no.1
    • /
    • pp.105-125
    • /
    • 1998
  • We are confronted by increase in old people due to the improvement in medical science, public hygiene and socioeconimic status in 20th century. But our medical security system for old people dees not meet the need for medical service of old people. Current medical insurance system restricts term and extent in allowance although the characteristics of the disease of the aged people need medical care of Bong duration and high cost. And in the medicaid system the speciality of the aged people is not recognized and the budget of the government is scanty. In addition many old people to our country are in economic distress due to low income. But the government authority does not give sufficient consideration for eld people in law, policy and budget. To improve social security system for old people it is necessary to increase the budget for the security of old people, to enhance the traditional respect for the aged, to improve medical security system by improving the accessibility to medical service and by expanding the allowance of medical insurance, and to expand the public welfare institutions. And these are roles for all the family. the society and the nation as well as the aged people themselves.

  • PDF

A Case Study on the Business Innovation for increasing National Science and Technology Competitiveness power - Simplification and Digitalization of R&D Expenses Performance procedure - (국가과학기술경쟁력 제고를 위한 과학기술부 업무혁신 사례 - 연구비 집행절차 간소화 및 디지털화 -)

  • Kim, Bong-Su;Lee, Eun-Yeong;Choe, Un-Baek;Jang, Bo-Hyeon
    • 한국디지털정책학회:학술대회논문집
    • /
    • 2007.06a
    • /
    • pp.51-58
    • /
    • 2007
  • Considering innovation a key to raising living standards, the Ministry of Science and Technology has put in place various measures meeting the needs of the newly promoted Deputy Prime Minister of Science and Technology. Such measures include business process reengineering as streamlining the work process to achieve the improvement in quality and efficiency: building the integrated performance management system to promote performance-or tented environment; and running the 1ifelong learning system for better competitiveness of government officials. Further to the innovation efforts at work, the number of steps of the R&D budget execution is streamlined from eight to five and its payment period is considerably reduced to 15 days from 60 days. In addition, the digitalized R&D budget management systems such as e-Contract System, One-click Processing Monitoring System, and Information Service System through Short Message Service (SMS) will contribute to improving R&D performance. And these systems are efficiently integrated into a portal interface named "Yeon-gu-ma-ru." The Ministry of Science and Technology, spearheading nationwide innovation, will continue efforts to make viable achievements of innovation.

  • PDF

A Method of Progress Management of Projects Based on Schedule for Small and Medium Enterprises (중소기업을 위한 일정 기반의 프로젝트 진도 관리 방안)

  • Oh, Joseph;Kim, Bo-Hyun;Baek, Jae-Yong;Jung, So-Young;Choi, Young-Jae
    • IE interfaces
    • /
    • v.25 no.2
    • /
    • pp.276-282
    • /
    • 2012
  • Earned value management(EVM) based progress management was designed to systematically manage large or huge projects with budget based criteria. For this reason, existed methods of EVM based progress management have a practical difficulty to apply to small and medium enterprises(SMEs) not possessing enough human resource, time, and cost. In other words, SMEs have performed simultaneously many small-sized projects emphasizing more project delivery than project budget. This study focuses on the area of project management applying to many small-sized projects simultaneously conducted by SMEs. Thus, the method proposed in this study is to manage only the progress of projects after removing cost factor in order to reduce man powers required for allocating the budget of projects to their all activities in detail in the stage of project planning. This study reveals that SMEs are able to manage progress of many projects easily and intuitively using the proposed method.

Carbon Budget and Network Analysis of a Surf Zone Ecosystem by NETWRK (NETWRK을 이용한 쇄파대 생태계의 탄소수지와 네트웍 해석)

  • KANG Yun Ho
    • Korean Journal of Fisheries and Aquatic Sciences
    • /
    • v.37 no.1
    • /
    • pp.33-43
    • /
    • 2004
  • A carbon budget model was constructed and analyzed for the Bangjukpo surf zone ecosystem in southern Korea by using the NETWRK. The model consists of 11 living and 1 non-living groups. Using boxes and arrows, a topological map was created to depict biomasses of each group and exchange rates between them. The system includes primary producers of phytoplankton and benthic algae, primary consumers of particle feeding zooplankton, carnivorous zooplankton, meiobenthos, malacostracans and bivalves, and top consumers of detrivorous, omnivorous, carnivorous and piscivorous fishes. The surf zone ecosystem was analyzed by means of network analysis, showing total system throughput of $574\;gCm^{-2}yr^{-1},$ development capacity of $1,876\;gCm^{-2}yr^{-1},$ ascendancy value of $768\;gCm^{-2}yr^{-1},$ Finn cycling index of $4.4\%$ and internal relative ascendancy of $27\%.$ These results were compared with similar data from other systems.

Application of Personal Digital Assistant (PDA) for Mobile Bridge Management System (MBMS) (PDA를 이용한 무선교량유지관리(MBMS) Application 개발)

  • 이태식;이동욱;이성현
    • Journal of the Korean Society for Railway
    • /
    • v.7 no.3
    • /
    • pp.223-231
    • /
    • 2004
  • The accumulated BMS data have made it easy to make reasonable decision-making for bride maintenance and repair work. In the developing period of BMS, the bridge management was not easy due to the lack of understanding of BMS and low credibility of the data. In recent years, it has been possible to enhance the credibility of the data and to expand the application scopes of BMS with the efforts of Local Road Construction Offices. The reasonable decision making for bridge management can improve the performance of bridges under the practical constraints such as limited budget. It can then result in the reduction of bridge maintenance budget. This study provides the methodology for the application of mobile internet-based KOBMS for bridge management. The data flow for BMS is the most important factor for decision-making on budget allocation, and this study establishes the basic scheme of the data flow for BMS. The implementation of PDA for BMS may suggest a new paradigm of 'Mobile' in the field of construction management.