• 제목/요약/키워드: Supplier development

검색결과 252건 처리시간 0.027초

기술척도 적용 연구 (A Study on Technical Measures and their Application)

  • 최석
    • 시스템엔지니어링학술지
    • /
    • 제3권2호
    • /
    • pp.3-8
    • /
    • 2007
  • Technical Measures includes Measures of Effectiveness(MOEs), Key Performance Parameters(KPPs), Measures of Performance(MOPs) and/or Technical Performance Measures(TPMs). Technical measurement is the set of measurement activities used to provide supplier and/ or acquirer insight into progress in the definition and development of the technical solution, ongoing assessment of the associated risks and issues. This paper describes how technical measures can be applied, using the measurement process described in the previous study and shows the relationship between the various types of technical measures.

  • PDF

임베디드를 이용한 터빈 발전기 조정율 모니터링 시스템 개발 (Development of Turbine Generator Speed Droop Monitoring System Using Embedded)

  • 장민규;전일영;이성근;김윤식
    • 전력전자학회:학술대회논문집
    • /
    • 전력전자학회 2004년도 전력전자학술대회 논문집(2)
    • /
    • pp.910-913
    • /
    • 2004
  • This paper is about to develop a system to monitor speed droop rate characteristic of turbine governor for electric power plant. High quality electricity can be obtained, and so electricity supplier get more profit through it. Developed system presents basis of judgement of unusual system and proper maintenance time for the governor and power plant.

  • PDF

마이크로프로세서를 이용한 도매시장의 전자경매시스템 개발 (The Development of Electronic Auction System(EAS) for Wholesale Market using Microprocessor)

  • 최한수;정헌
    • 제어로봇시스템학회논문지
    • /
    • 제5권7호
    • /
    • pp.855-861
    • /
    • 1999
  • In this paper, we present new application for the auction method which has been based on one-chip microprocessors. We develop the portable wired terminal for market blocker. And, using that, the recommended price of products is able to push into and show the information of action status. Through our research, using EAS(Electronic Auction System), we can prevent supplier from blocker's rigging the market, because anyone who have a qualification for the action blocker is able to participate in action.

  • PDF

Highly integrated LCD bias and control IC

  • Nachbaur, Oliver
    • 한국정보디스플레이학회:학술대회논문집
    • /
    • 한국정보디스플레이학회 2009년도 9th International Meeting on Information Display
    • /
    • pp.1236-1239
    • /
    • 2009
  • Each LCD TFT panel requires a power supply IC on the panel board. The IC provides the power rails for the timing controller, source and gated driver IC and others. The industry trend moves towards higher integrated devices. The challenge for the panel manufacturer is the development and implementation of such an IC in cooperation with the semiconductor supplier. If not done carefully the solution will not reduce the overall solution cost or can't provide the expected performance and reliability. This paper discusses the key considerations to successfully develop and integrate a highly integrated LCD bias IC into the system.

  • PDF

주요선진국의 가스기술기준 체제분석 및 제도개선 발전 모형 (Analysis of Safety Decrees for Gas Safety Management System and its Development)

  • 김봉진;강경식
    • 대한안전경영과학회지
    • /
    • 제3권2호
    • /
    • pp.51-63
    • /
    • 2001
  • Korea gas industrial because of received LNG in 1987 was converted by the Gas Safety Management System in relation to city gas, LPG and LNG. Gas accident were caused by treatment problem on the supplier and user, on technical and use management mater, on facilities and goods, and included problem with gas safety connection system. This study is present standard application plan of each department to use planning gas technical standard and gas utilization standard of introduction model than statute for change of self-regulation management system and complicated regulation of examination center and order.

  • PDF

물류망 설계 및 계획을 위한 컴퓨터 시뮬레이터의 개발 (Development of a Logistics Network Simulator)

  • 박양병
    • 산업공학
    • /
    • 제14권1호
    • /
    • pp.30-38
    • /
    • 2001
  • Logistics network management has become one of the most important sources of competitive advantage regarding logistics cost and customer service in numerous business segments. Logistics network simulation is a powerful analysis method for designing and planning the logistics network optimally in an integrated way. This paper introduces a logistics network simulator, LONSIM, developed by author. LONSIM deploys a mix of simulation and optimization functions to model and analysis logistics network issues such as facility location, inventory policy, manufacturing policy, transportation mode, warehouse assignment, supplier assignment, order processing priority rule, and vehicle routes. LONSIM is built with AweSim 2.1 and Visual Basic 6.0, and executed in windows environment.

  • PDF

고고도 모사용 소형시험장치 연구 (A Study of Simplified Test Rig for High Altitude Simulation)

  • 이지형;오종윤;박익수
    • 한국군사과학기술학회지
    • /
    • 제7권4호
    • /
    • pp.133-137
    • /
    • 2004
  • A simplified test rig to simulate high-altitude environments was designed by analyzing the AEDC (Arnolds Engineering Development Center) report regarding simulated altitude testing. The test rig consists of a vacuum chamber, a supersonic nozzle connected to a cold-gas supplier and a diffuser. The preliminary tests were conducted to validate the AEDC design concepts. The test results showed that sub-atmospheric pressure(1.0psia) environments were realized inside the vacuum chamber and the design concepts were confirmed.

시제열차 개발에서의 신뢰성 관리 체계 (Reliability Management Process for the Development of a Prototype Train)

  • 최성훈;박춘수;이태형
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2007년도 추계학술대회 논문집
    • /
    • pp.206-210
    • /
    • 2007
  • IEC 62278 presents a process to implement a consistent approach to the management of reliability for railway applications. A reliability program has to be established at the outset of a project in order to manage reliability activities effectively through the life cycle. The first step of the reliability program is to evaluate reliability requirements and targets based on the system specifications. The system specifications are derived from the customer's needs. The way in which the system requirements reflect the customer's needs is strongly dependent on the characteristics of the product. In general the customer of commercial trains presents the system requirements from their needs. However, the relation between the customer and supplier is equivocal for a project to development a prototype train, and the reliability program should be different from that of an usual commercial project. This paper deals with a process to manage reliability activities for the development of a protype train based on the experiences obtained from the development of the Korea High-Speed Train: Hanvit-350.

  • PDF

시제열차 개발에서의 신뢰성 관리 체계 (Reliability Management Process for the Development of a Prototype Train)

  • 최성훈;박춘수;이태형
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2008년도 춘계학술대회 논문집
    • /
    • pp.1083-1088
    • /
    • 2008
  • The first task for the development of a train system is to define the system and to determine its requirements. Reliability target is one of the requirements defined in the system requirements. In railway applications it is advised to follow the procedures given in IEC 62278 to fulfill reliability requirements. The reliability requirements are derived from the customer's needs. The way in which the system requirements reflect the customer's needs is strongly dependent on the characteristics of the product. In general the customer of commercial trains presents the system requirements from their needs. However, the relation between the customer and supplier is equivocal for a project to development a prototype train, and the reliability program should be different from that of an usual commercial project. This paper deals with the reliability management and assessment plan carried out for the on-going "Next generation high-speed train development project".

  • PDF

타이어 시뮬레이터를 이용한 능동형 타이어 공기압 제어 시스템 개발 (Development of an Active Tire Pressure Control System Using a Tire Simulator)

  • 이규철;류관희;이중용;홍지향;김혁주;유지훈
    • Journal of Biosystems Engineering
    • /
    • 제35권1호
    • /
    • pp.21-30
    • /
    • 2010
  • This study was performed to develop an active tire pressure control system that can adjust tire pressure to the optimum level according to traveling and working condition of agricultural tractor. For the development of active tire pressure control system, pneumatic supplier, solenoid valve block including pneumatic supply line, infinite rotation type pneumatic supplier with rotary joint unit, tire pressure transceiver module and control algorithm were developed. Also, tire simulator was developed. Using this tire simulator, the feasibility of each part constructing actual system was tested by checking the performance. The average communication success ratio was 98.3% between tire pressure transmitter and receiver module according to the various tire rotational speed and data receipt position of receiver module. The communication performance of the developed transmitter and receiver module was very stable in any condition. The tire pressure control system was accomplished by using the proportional control algorithm in this study. Also tire pressure control performance of developed control system was analyzed by using the tire simulator. As a result of control performance analysis to the developed system, the developed control system took 307 seconds to inflate agricultural tractor's tire from 50 kPa to 180 kPa. In opposite case, it took 210 seconds. Also it was able to control the tire pressure accurately under ${\pm}0.9%$ (FS) in any condition.