Face Recognition assumes much significance in the context of security based application. Normally, high resolution images offer more details about the image and recognizing a face from a reasonably high resolution image would be easier when compared to recognizing images from very low resolution images. This paper addresses the problem of recognizing faces from a very low resolution image whose size is as low as $8{\times}8$. With the use of CCTV(Closed Circuit Television) and with other surveillance camera-based application for security purposes, the need to overcome the shortcomings with very low resolution images has been on the rise. The present day face recognition algorithms could not provide adequate performance when employed to recognize images from VLR images. Existing methods use super-resolution (SR) methods and Relation Based Super Resolution methods to construct from very low resolution images. This paper uses a learning based super resolution method to extract and construct images from very low resolution images. Experimental results show that the proposed SR algorithm based on relationship learning outperforms the existing algorithms in public face databases.
Based on a 405m high super-tall building, the influence of outriggers, different shapes and layouts of structural plane and elevation on structural efficiency under lateral forces is studied in this paper. A calculation formula concerning the structural efficiency is given. The study shows that structural efficiency can be improved by triangulating the plane shape, using mega columns, the peripherization of the plane layout, tapering the elevation shape and setting bracing structure in the elevation. The arrangement of outriggers between the core tube and flange frame can reduce the shear lag effect in order to improve structural efficiency. The essence of improving structural efficiency of super-tall buildings is to maximize the plane bending stiffness and to make its deformation approach to plane section assumption.
Constructing large-scale mat foundation mass concrete is increasing for the stability of building structure, because a lot of high rise building are being built in order to make full use of limited space. However, It is of increasing concerns that because limited placing equipments, available job-site and systems for mass concete placement in construction field do not allow to place great quantity of concrete at the same time in large scale mat foundation, consistency between placement lift can not be secured. And also, it is likely to crack due to stress caused by the difference of hydration heat generation time. To find out the solution against above problems, this study is to reconfirm the performance of normal concrete designed by mix proportion and super retarding concrete. The Fundamental test shows what happens if low heat proportioning and control method of setting time are applied at the job-site of newly constructed high rise building. The test result show that slump flow of concrete has been somewhat increased as the target retarding time gets longer, while the air content has been slightly decreased but this is no great difference from normal concrete. The setting time shows to be retarded as target retarding time gets longer, the range of retarding time increases. It is necessary to increase the amount of mix of super retarding agent in the proportion ration by setting curing temperature high since outdoor curing is about 6 hours faster than standard curing, which means the temperature of the concrete will be higher than the temperature of the surrounding environment, due to its high hydration heat when applying in a construction site. The compressive strength of super retarding concrete appears to be lower than normal concrete due to the retarding action in the early stage. However, as the time goes by, the compressive strength gets higher, and by the 28th day the strength becomes the same or higher than normal concrete.
Cranenbroeck, Joel Van;Hayes, Douglas McL;Sparks, Ian R
한국항해항만학회:학술대회논문집
/
한국항해항만학회 2006년도 International Symposium on GPS/GNSS Vol.1
/
pp.465-469
/
2006
In recent years there has been considerable interest in the construction of super high-rise buildings. From the prior art, various procedures and devices for surveys during and after the phase of erection of a high-rise building are known. High-rise buildings are subject to strong external tilt effects caused, for instance, by wind pressures, unilateral thermal effects by exposure to sunlight, and unilateral loads. Such effects are a particular challenge in the phase of construction of a high-rise building, in as much as the high-rise building under construction is also subject to tilt effects, and will at least temporarily lose its - as a rule exactly vertical - alignment. Yet construction should progress in such a way that the building is aligned as planned, and particularly so in the vertical, when returning into an un-tilted basic state.It is essential that a straight element be constructed that theoretically, even when moving around its design centre point due to varying loads, would have an exactly vertical alignment when all biasing conditions are neutralised. Because of differential raft settlement, differential concrete shortening, and construction tolerances, this ideal situation will rarely be achieved. This paper describes a procedure developed by the authors using GPS observations combined with a network of precision inclination sensor to provide reliable coordinated points at the top of the worldwide highest-rise building under construction in Dubai.
초고층 건물의 환기계획에서 설비의 효율적인 운영을 위해 환기설비는 제연설비 겸용으로 사용되고 있다. 본 연구에서는 지하 4층 지상 59층의 초고층 건물을 분석모델로 선정하고 수치해석을 통해 연기이동력에 의한 층별 압력분포를 검토하였으며, 분석모델 건물에서의 연기이동력이 환기 및 제연에 미치는 영향을 규명하였다. 또한 이들 결과를 바탕으로 분석모델 건물의 환기계획에서 주방용 환기댐퍼를 환기-제연 겸용으로 설계할 때 연기이동의 복합력과 요구되는 댐퍼의 개폐력과의 관계를 운동해석 시뮬레이션을 통해 결정하였고, 그 결과로부터 적합한 댐퍼의 구동장치를 선정하였다.
초고층 빌딩 건설 시 요구되는 성능위주 소방설계는 인명 안전을 확보할 수 있는 능동적인 대책으로서 화재 위험성을 평가하고, 공학적 분석 결과를 토대로 하여 방재시스템을 구축하는 것으로 관련 법규 및 기준을 적용하여 수행하는 기존의 설계 방식보다 인명 안전의 확보에 있어서 매우 효율적이고 타당하다고 보여진다. 본 연구는 피난 요구 시간인 RSET과 피난이 가능한 시간인 ASET에 의한Time-line Analysis을 적용하였으며 또한 ASET과 RSET을 비교, 분석하기 위하여 화재 및 피난 시뮬레이션을 수행하였다. 연구 결과, 스프링클러설비가ASET을 증가시켰으며, 화재감지 및 경보시간의 단축이 RSET을 효과적으로 감소시켜 주고 있다. 단축된 시간은 인명의 안전을 확보하는데 많은 영향을 미치는 것으로 확인되었다. 또한 소화설비, 화재 감지 및 경보설비가 정상적으로 작동되도록 유지 관리되는 것도 중요한 것으로 파악되었다. 화재의 성상을 데이터 베이스화하고 피난 대응 프로그램 등이 구축되면 성능위주 설계에 유용한 자료로 이용될 수 있다.
The ASHRAE Technical Committee for Tall Buildings, TC 9.12, has defined a tall building as one whose height is greater than 300 feet (91m). Since the publication of the HVAC Design Guide for Tall Commercial Buildings in 2004, there were only about 300 buildings taller than 200 meters; this number has risen to 600 in 2010 and the prediction 765 buildings taller than 200 meters in 2012. There has also been an introduction of two new classes of tall buildings: ${\bullet}$ Mega tall, which are buildings taller than 300 m, and ${\bullet}$ Super tall, which are buildings taller than 600 m. The effect of ambient air temperature over the height of buildings, especially Mega tall and Super tall buildings. The ambient climatic conditions vary with altitude and these changes in ambient conditions can seriously affect load calculations and performance of super and mega tall buildings. This paper presents revised calculations for stack effect for Tall, Mega Tall and Super tall Buildings.
인간 생활을 보다 편리하게 하기 위하여 대형 빌딩, 복합상가, 대형 지하시설물 등을 포함한 최근 건물들은 점점 대형화 및 초고층화가 되어 가고 있는 추세이다. 그러나 초고층 건물들이 많이 증가할수록 화재 등 대형 재난에 대한 위험성도 점점 증가하고 있다. 특히, 초고층 건물에 화재와 같은 대형 재난이 발생할 경우에 재실자를 대상으로 신속하고 정확한 피난유도가 이루어지지 않는다면, 인명 피해는 상상 이상으로 엄청날 것이다. 따라서 건물 내부에 있는 재실자들이나 구조가 필요한 사람들을 대상으로 신속한 피난 유도 및 구조가 이루어져야 하며, 이를 위해서는 건물 내부에 있는 사람들의 규모와 위치 식별 및 파악이 선행되어야 한다. 이를 위하여 먼저 건물 내부의 재실자 파악을 위한 기존 위치추적기술에 대한 선행연구를 수행한다. 그리고 이를 기반으로 본 논문에서는 실제 재난 발생 시에 초고층빌딩을 대상으로 위치식별기술을 활용하여 실시간 인원수를 파악하여 밀집도를 개선하고 피난시간을 단축할 수 있는 방안에 대해 연구하고자 한다.
최근의 건축공사는 고층화되어 가는 추세이며 원가절감과 공기단축, 생산성 향상 등이 요구되고 건설자동화의 도입을 통한 총생애자동화시스템의 도입이 시급히 요구되는 추세이다. 이에 따라 본 연구에서는 초고층 빌딩 건축에 주로 사용되는 커튼월 공법과 제조업에서의 SCM기법, 최신의 RFID기법을 이용하여 초고층 건축물 커튼월의 자동화 관리시스템을 구축을 위한 방안을 제시하였다. SCM기법이란 생산에서 판매에 이르는 전단계의 과정을 연결, 관리하는 것을 의미하고 커튼월은 빌딩 건축에서 골조공사의 공기단축과 단순화를 위해 가장 많이 활용되는 건식공법으로 건설공사에서 가장 제조업에 가까운 형태의 공사로 볼 수 있다. 또한 RFID는 SCM의 구현방법으로 자재의 흐름과 생산프로세스, 그리고 정보관리 시스템의 도구로 사용되며 이들을 활용한 총생애자동화시스템은 생산과정 뿐만 아니라 사후관리 과정에도 효율적이며 높은 생산성과 경제성 향상에 기여한 것으로 기대된다.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.