• 제목/요약/키워드: Subway tunnel

검색결과 381건 처리시간 0.026초

터널통과 전동차 내외부 소음 특성 규명 (Identification of Noise Characteristics for Subway Train Passing through the Underground Tunnel)

  • 조준호;이규진;정우성;홍철기
    • 한국소음진동공학회:학술대회논문집
    • /
    • 한국소음진동공학회 2002년도 추계학술대회논문집
    • /
    • pp.340-345
    • /
    • 2002
  • Passengers in automobile or train are exposed to a worse noise environment when they are in the tunnel than in the open field. This is due to a relatively higher space density of sound energy by multiple reflection phenomenon of noise generated by operation of transportation vehicles from tunnel wall compared to open field. In this study, noise characteristics of subway train running through a tunnel were investigated at straight/curved track and tunnel type(semi circular/box). Also the noise measured simultaneously at inner and outer sides of train running through a tunnel, so that the coherence of the various noise sources of subway train to inner noise was evaluated.

  • PDF

지하철 대단면 터널의 설계와 시공관리 사례 (Design and Construction of a Large Section Tunnel for a Subway Station)

  • 문상조;장석부;정준화
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 1999년도 봄 학술발표회 논문집
    • /
    • pp.285-292
    • /
    • 1999
  • Recent development cases of transportation utilities using tunnelling method in metropolitan sites have been increased due to the heavily complex environments and restrictions of construction works. The progress of tunnel design and construction to be supported by the tunnel analysis and measurement techniques using computers have increased adoptions of large section tunnels. In this paper, many factors to be considered in designing large section tunnels are discussed and the case of the construction of the subway station tunnel which is recently completed is introduced. This tunnel has a width of 24 m, a height of 16 m, and a excavation section area of 366 ㎡.

  • PDF

지하철의 터널 배수체계에 따른 결함 사레 (Case Study on defects of Tunnel Drainage in Subway)

  • 김석조;이재욱;조성우;신용석
    • 한국터널공학회:학술대회논문집
    • /
    • 한국터널공학회 2005년도 학술발표회 논문집
    • /
    • pp.292-298
    • /
    • 2005
  • Tunnel in subway should be designed as a water-proof type tunnel as much as possible but it is difficult to make it come true due to several facts, such as construction technique and cost. A drainage type tunnel as a substitute of a water-proof tunnel lead to the increase of water pressure on the concrete lining that make bad effect to tunnel structure when it has some problem to operate the drainage system. Throughout studying about cases on defects of tunnel drainage in subway We hope it contributes to tunnel maintenance.

  • PDF

Mechanical evolution law and deformation characteristics of preliminary lining about newly-built subway tunnel closely undercrossing the existing station: A case study

  • Huijian Zhang;Gongning Liu;Weixiong Liu;Shuai Zhang;Zekun Chen
    • Geomechanics and Engineering
    • /
    • 제35권5호
    • /
    • pp.525-538
    • /
    • 2023
  • The development of a city is closely linked to the construction and operation of its subway system. However, constructing a new subway tunnel under an existing station is an extremely complex task, and the deformation characteristics and mechanical behavior of the new subway tunnel during the excavation process can greatly impact the normal operation of the existing station. Although the previous studies about the case of underpass engineering have been carried out, there is limited research on the condition of a newly-built subway tunnel that closely undercrossing an existing station with zero distance between them. Therefore, this study analyzes the deformation law and mechanical behavior characteristics of the preliminary lining of the underpass tunnel during the excavation process based on the real engineering case of Chengdu Metro Line 8. This study also makes an in-depth comparison of the influence of different excavation methods on this issue. Finally, the accuracy of numerical simulation is verified by comparing it with on-site result. The results indicate that the maximum bending moment mainly occurs at the floor slab of the preliminary lining, while that of the ceiling is small. The stress state at the ceiling position is less affected by the construction process of the pilot tunnel. Compared to the all-in-one excavation method, although the process of partial excavation method is more complicated, the deformation of preliminary lining caused by it is basically less than the upper limit value of the standard, while that of the all-in-one excavation method is beyond standard requirements.

지하철 터널부로의 열 및 연기배출에 관한 연구 (A Study of Heat and Smoke Exhaust to Subway Tunnel Direction)

  • 이동호
    • 한국안전학회지
    • /
    • 제19권3호
    • /
    • pp.1-8
    • /
    • 2004
  • This study aims to derive the operation method of a comprehensive ventilation system which is capable of providing passengers with safe exit paths from platforms in onboard fire situations. To accomplish this, the airflow distributions in subway platforms under 6 types of tunnel vent system were calculated in addition to having analyzed diffusion behaviors of smoke and heat exhaust in such states by performing 6 kinds of different ventilation scenarios in a 3-D Fire Dynamic Simulation (FDS) simulation model. In order to recommend the mechanical smoke exhaust operation mode, Subway Environmental Simulation(SES) is used to predict the airflow of the inlet and outlet tunnel for the subway station to clarify the safety evaluation fir the heat and smoke exhaust on subway fire events.

도시철도 터널구조체의 내화안정성 평가를 위한 표준시간-온도곡선 적용 (Time-Temperature Curve for Fire Safety Assessment of Metropolitan Transit Tunnels)

  • 원종필;최민정;이수진;이상우
    • 한국구조물진단유지관리공학회 논문집
    • /
    • 제14권3호
    • /
    • pp.118-122
    • /
    • 2010
  • 본 연구는 도시철도 터널내 화재시 구조체의 내화성능을 평가하기 위한 기준을 제시하고자 실시하였다. 현재 국내 도심의 지하철 터널 구간은 135km로써 그 규모가 세계 4위이며 대도시들의 도시철도 터널건설의 증가와 그 연장이 길어짐에 따라 터널 내 화재사고가 갈수록 높아지고 있는 상황이다. 하지만 국내에는 도시철도 터널 화재에 대한 내화성능평가에 기본적으로 적용되는 시간-온도 곡선이 없다. 따라서 본 연구에서는 국내 도시철도 터널의 통행량, 차량 종류 등을 고려한 열방출율을 기초로 외국에서 제시된 시간-온도 곡선을 검토하였으며 국내 실정에 맞는 설계화재 모델을 제시하였다. 또한 제시된 설계화재모델에 대해 수치해석을 통하여 화재시 도시철도 터널 구조체의 온도분포를 산정하였다.

지하철 본선터널 제연성능 실물 실험 (Full-Scale Test of Smoke-Control Performance of a Subway Tunnel)

  • 박원희;이덕희;정우성
    • 한국화재소방학회논문지
    • /
    • 제25권4호
    • /
    • pp.94-102
    • /
    • 2011
  • 지하철 본선터널에서 고온 연기시험을 수행하였다. 고온의 화재연기를 모사하기 위하여 약 1.0MW의 알콜트레이 및 연기발생장치를 이용하였다. 화재발생후 9분 후에 터널내에 설치된 팬이 순차적으로 작동하여 화재 연기가 제어되는지를 확인하였다. 터널내의 주요 위치에서의 풍속, 풍향, 온도 및 연기농도 등을 측정하여 이를 화재안전 관점에서 분석하였다. 화재 인근의 천장부분의 풍속 측정값으로 연기의 속도를 구하였으며, 위치별 제연기류가 형성되는 시간이 상이한 것을 확인하였다. 본 연구에서 계측된 풍속분포를 이용하여 지하철 본선터널 제연설비 성능 평가를 위한 수치해석의 경계값 및 비교결과로 활용될 것이다.

CONSTRUCTION OF SUBWAY TONNEL BENEATH EXISTING VEHICLE UNDERPASS

  • Kim, In-Kuin
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 1990년도 PROCEEDINGS OF THE FIRST KOREA-JAPAN JOINT GEOTECHNICAL SEMINAR ON EXCAVATION and TUNNELING IN URBAN AREAS
    • /
    • pp.25-34
    • /
    • 1990
  • For the construction of twin single track subway tunnels by NATM within close proximity of existing vehicle underpass in the highly congested area of downtown Seoul, finite element analyses were performed to evaluate the ground responses during tunnelling and also the stability and safety of the underpass structure and subway tunnels. Results of the analyses indicated the need to improve the soil beneath the underpass, and pre-grouting was carried out prior to the tunnel excavation. During tunnel construction field measurement program was implemented to confirm the results of anslyses and to control the tunnel construction procedures, thus ensuring stability of the existing structres.

  • PDF

터널내의 흡음재 부착 효과 연구 (A Study for the Effect of Sound Absorbing Materials in the Tunnel)

  • Park, Han-Lim;Lee, Duck-Joo
    • 한국소음진동공학회:학술대회논문집
    • /
    • 한국소음진동공학회 2001년도 춘계학술대회논문집
    • /
    • pp.750-750
    • /
    • 2001
  • Todays, according to development of traffics, there are so many tunnels around us. Tunnels are used for trains, subway trains, cars, etc. Especially for subway, all of its routes are tunnels. So the noise of the subway train cannot radiated out of the station and the noise level in the station and train cabin is so high. There are some methods to reduce this noise and one of them is using absorbing materials. But the area of the tunnel and station is very large, so it is important to determine the effective position and amount of absorbing materials before attaching them. In this study, we studied the effect of sound absorbing materials in the tunnel using boundary element method. We applied BEM for general boundary conditions. With BEM calculations, we found the effect of absorbing materials and effective positions for the subway tunnel and station.

  • PDF

이중 복합터널 상부구조물의 진동에 대한 안정성 평가 (Estizmation of Structure Stability on the Ground to Vibration from Dual Composite Tunnels)

  • 신승목;장연수;이우진;권순정
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2008년도 추계 학술발표회
    • /
    • pp.1244-1250
    • /
    • 2008
  • The site of interest is a residence redevelopment area which has excavation construction with cut-off walls. The site is located over Dong-Mang-Bong tunnel and Seoul No. 6 subway tunnel. This study analyzed numerically the influence of vibrations from No. 6 subway tunnel to the basement of the redeveloped apartment away from the distance about 11m. Kyoung-bu highspeed railway's time history model with linearly reduced maximum acceleration is applied to take into the subway maximum speed of 75km/h. The maximum velocity of vibration for the cross section of the interest was estimated as 0.28cm/sec which satisfied the allowable standard of 0.5cm/sec for apartment and residence of Seoul.

  • PDF