• Title/Summary/Keyword: Subway tunnel

Search Result 381, Processing Time 0.026 seconds

Application of Back Analysis for Tunnel Design by Modified In Situ Rock Model (현장암반 모델을 적용한 터널의 역해석)

  • Kim, Hak-Mun;Lee, Bong-Yeol;Hwang, Ui-Seok;Kim, Tae-Hun
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.2 no.3
    • /
    • pp.25-36
    • /
    • 2000
  • The purpose of this research work is to propose an analytical method of tunnel design based on reasonable site data. Therefore the proposed design method consists of monitoring data and Modified In Situ Rock Model. Also the Rock Mass Rating for very poor quality rock is very difficult to estimate, the balances between the ratings may no longer gives a reliable basis for the rock mass strength. But in reality Rock Mass Rating is only the property which can be obtained from face mapping records of the exposed tunnel face during construction stage. Evaluation of rock parameters for the actual design prior to tunnel construction should be corrected during tunnelling process in particularly complex ground conditions. This study intends to investigate application of in-situ rock model to soft rock tunnelling (weathered rock) by face mapping results and site measurement data that are obtained at the costraction site of Seoul Subway Tunnel. For the preparation of more reliable ground parameters, the Rock Mass Rating values for the weathered rocks were modified and readjusted in accordance with the measurement data. The modified input parameters obtained by the proposed method are used for the prediction of the tunnel behavior at subsequent construction stages. The results of this study revealed that more reasonable feed back tunnel analysis can be possible as suggested. Ample measurement data would be able to confirm the new proposed technique in this research work.

  • PDF

A Field Case on the Pilot Constructions and Changes of a Braced Cut Wall in a Coastal Filled Land (해안매립지반에서의 토류가시설 시험시공 및 변경사례)

  • Hwang, Young-Chul;Kim, Ki-Rim;Kim, Yeon-Jung
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2006.10a
    • /
    • pp.46-55
    • /
    • 2006
  • There are many kinds of braced cut wall methods as the sheet pile, SCW, CIP and slurry wall which is adoptable for a deep excavation construction in a coastal filled land. The braced cut wall which has a strong stiffness is very stable but it has the weak point that the construction cost is high. Thus when a braced cut wall is designed, the geotechnical engineers choose the braced cut wall which has more safe and economic in the consideration of surrounding buildings near the construction site. Especially, when the sheet pile method as a braced cut wall is cheesed, the layer order and consistence of a coastal deposit stratum are considered and the pile driving method is also considered. This paper introduces the case that the originally box-type sheet pile wall was changed to U-type and high strength material after the pilot test at the subway construction site in a coastal filled land. This paper also introduces the case that the sheet pile's driving method was changed to special method in the section of the temporary coffer dam which had made when the present coastal filled land was formed.

  • PDF

Risk management applicable to shield TBM tunnel: II. Risk analysis methodology (쉴드 TBM 터널에 적용 가능한 리스크 관리: II. 리스크 분석 방법)

  • Hyun, Ki-Chang;Min, Sang-Yoon;Moon, Joon-Bai;Jeong, Gyeong-Hwan;Lee, In-Mo
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.14 no.6
    • /
    • pp.683-697
    • /
    • 2012
  • In this paper, a risk analysis methodology applicable to shield TBM tunnels was studied. Fault Tree Analysis (FTA) was utilized to identify all risk items and to calculate the probability of failure of each item and Analytic Hierarchy Process (AHP) was used to obtain the impact of each risk item. Finally, a risk level of each risk item can be assessed. Developed methodology is applied to a Seoul subway site in which EPB shield tunnel method was utilized and it was found that risk analysis results matched reasonably well with field data.

A study on behavioral characteristics of concrete lining based on the equations of relaxed rock loads (이완하중 산정식에 따른 콘크리트라이닝 거동특성에 관한 연구)

  • Kim, Sang-Hwan;Park, Inn-Joon;Moon, Hoon-Ki;Shin, Yong-Suk
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.12 no.6
    • /
    • pp.443-450
    • /
    • 2010
  • A concrete lining of NATM tunnel had been considered as interior materials. But recently we consider it as structural materials. Therefore we must consider various loads. Relaxed rock load is a main load which decides thickness and reinforcement presence of concrete lining. In practice conservatively, Terzaghi's rock load theory has been accepted to estimate relaxed rock loads in urban subway tunnel design. This study investigates the equations of relaxed rock loads used in the design of NATM concrete lining. Structural analysis are executed based on various equations of relaxed rock loads, and concrete lining forces are compared.

A Study on the Behaviour of the Station Structure due to Adjacent Construction (근접시공에 따른 정거장구조물 거동특성에 관한 연구)

  • Chung, Jeeseung;Kim, Manhwa;Lee, Sungil;Kim, Hongjoo;Shin, Youngwan
    • Journal of the Korean GEO-environmental Society
    • /
    • v.17 no.11
    • /
    • pp.55-64
    • /
    • 2016
  • Recently, it has been made many adjacent construction of inter-facility by the expansion of urban infrastructure facilities using the underground space. The complaints relating to the stability of the facility by adjacent construction is common. In this study, it was conducted for the subway line 5 Gimpo airport station structure in the upper Gimpo urban railway to determine the behavior characteristics of station structure according to adjacent construction. It was performed evaluation of the safety zone and excavation method for station structure. And after a review of damage evaluation, track irregularities and structural calculation by using a numerical analysis, stability of the station structure according to adjacent construction was evaluated to be secured. This study is expected to be used as basic data in advance if you need to review the effects of nearby structure according to adjacent construction.

The deformation behavior of soil tunnels reinforced with RPUM and fiberglass pipes (RPUM과 유리섬유 파이프로 막장을 보강한 토사터널의 변형거동)

  • Nam, Gi-Chun;Heo, Young;Kim, Chi-Whan;You, Kwang-Ho
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.4 no.3
    • /
    • pp.185-193
    • /
    • 2002
  • In this paper, deformation behavior of shallow subway tunnel excavated in weathered soil and reinforcement effects of longitudinal support measures are investigated via three dimensional FDM analysis. Two excavation methods, half-face excavation and full-face excavation, are considered in simulation to study the influences of excavation methods on tunnel deformation behavior. In addition, the reinforcing effects of RPUM and fiberglass pipe are compared. Face extrusion, covergence, preconvergence, and sidewall displacement are investigated to analyze tunnel deformation behavior, and surface settlement is used to analyze the effects of excavation methods and longitudinal supports measures. The simulation results show that half-face excavation induces larger convergence, preconvergence, sidewall displacement, surface settlement than full-face excavation, while full-face excavation induces larger extrusion than half-face excavation. In addition, under same excavation method, all displacements are larger when RPUM is only used for longitudinal support than when RPUM is jointly used with fiberglass pipes.

  • PDF

A Case Study on Blasting at the Tunnel Excavation in an Adjacent Section of a Subway Station (지하철역 인접구간에서의 터널 발파굴착 사례)

  • Lee, Hyo;Kim, Jeoung-Hwan;Hwang, Nam-Sun
    • Explosives and Blasting
    • /
    • v.40 no.2
    • /
    • pp.25-34
    • /
    • 2022
  • Recently, there has been an increasing number of cases of improving constructability by using electronic detonators with precise delay time in tunnel blasting sites. This case is a case of conducting test blasting using with non-electric detonator and electronic detonator at the site of 『Seoul Metropolitan Area Express Railroad Route A Private Investment Project Section 00』 that requires careful management of vibration and noise. Although this site was designed with a non-electric detonator, it was attempted to improve the advance rate and control vibration and noise by mixing the non-electric detonator and the electronic detonator due to the decrease in the advance rate. As a result of the blasting, the target value was achieved with an advance rate of about 85% and a maximum measured value of vibration and noise is 0.215cm/sec and 73.22dB(A) which were measured below regulatory standards. As blasting works in downtown areas, it is necessary to designate measurement and management objects to continuously manage vibration and noise.

A study on hydraulic back analysis for an urban tunnel site and stability analysis based on hydro-mechanical coupling analysis (도심지 터널 용출수 발생구간에서의 수리 역해석 및 수리-역학 연계해석을 통한 안정성 해석 연구)

  • Park, Inn-Joon;Song, Myung-Gyu;Shin, Uyu-Soung;Park, Yong-Su
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.10 no.4
    • /
    • pp.397-404
    • /
    • 2008
  • Excessive amount of groundwater flowed into tunnel, while constructing Incheon international airport railway. Tunnel passes under subway line no. 2 with only 1.76 m below. To protect the existing structure, TRcM excavation method was applied. As station and construction shaft are already constructed, which are located back and forth of TRcM section, 86.4 ton per day of groundwater inflow is against expectation. To identify mechanism of excessive water inflow, hydraulic back analyses were performed. Then, hydro-mechanical coupled analysis were also performed with the hydrogeologic parameters identified, whose results are investigated for checking the stability of adjacent structures to the tunnel under construction. And a number of mechanical analyses were also performed to check the hydro-mechanical coupling effect. The result from the mechanical analysis shows that subsidence and tunnel ceiling displacement will be 0.85 mm and 1.32 mm. The result of hydro-mechanical couple analysis shows that subsidence and maximum tunnel ceiling displacement will be 1.2 mm and 1.72 mm. Additional displacements caused by groundwater draw down were identified, however, displacement is minute.

  • PDF

A Study on the Three Dimensional Finite Element Analysis for the Tunnel Reinforced by Umbrella Arch Method (Umbrella Arch 공법이 적용된 터널의 3차원 유한요소 해석에 관한 연구)

  • 김창용;배규진;문현구;최용기
    • Tunnel and Underground Space
    • /
    • v.8 no.3
    • /
    • pp.209-225
    • /
    • 1998
  • Recently, Umbrella Arch Method(UAM), one of the auxiliary techniques for tunnelling, is used to reinforce the ground and improve stability of tunnel face. Because UAM combines the advantages of a modern forepoling system with the grouting injection method, this technique has been applied in subway, road and utility tunnel sites for the last few years in Korea. Also, several research results are reported on the examination of the roles of inserted pipes and grouted materials in UAM. But, because of its empirical design and construction methodology, more qualitative and systematic design sequences are needed. Therefore, above sequences using numerical analysis are proposed and, the effects of some design parameters were studied in this research. In order to acco,mplish these objects, first, the roles of pipe and grouting materials, steel-rib and the others in ground improving mechanism of UAM are clarified. Second, the effects of design parameters are investigated through parametric studies. Design parameters are as follows; 1) ground condition, 2) overburden, 3) geometrical formulation of pipes, 4) grouting region and 5) characteristics of pipes.

  • PDF

An analysis of excavation cycle time for Korean tunnels and the comparison with the Standard of Construction Estimate (국내터널 굴착 사이클타임에 대한 분석결과와 표준품셈과의 비교)

  • Kim, Yangkyun;Kim, Hyung-Mok;Lee, Sean S.
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.21 no.1
    • /
    • pp.137-153
    • /
    • 2019
  • Estimating tunnel construction time and costs are the most fundamental part of a tunnel project planning, which has been generally assessed on a deterministic basis until now. In this paper, excavation cycle time was investigated for two road tunnels and one subway tunnel, and the results were compared with the Standard of Construction Estimate (SE), which is made for the estimation of construction time and cost in a design stage. The results show that the difference in cycle time between SE and actual cycle time is 50%, 7% and 31% respectively for the three tunnels, which means that SE does not reflect practical operation time. The major reasons of the difference are skilled level of tunneling workers, the change of operation sequences for more effective operations, much more complicated working atmosphere in a tunnel than the assumption of SE etc. Finally, even though the results can not be generalized since investigated tunnels are only 3, but it is thought that SE needs to be upgraded into the model able to consider quite common situations through additional tunnel investigation and studies in the future.