• Title/Summary/Keyword: Subway Load

Search Result 81, Processing Time 0.026 seconds

The Study on Determination of Benefit Factor as Constructing Traffic Facilities Using ANP (ANP기법을 이용한 교통시설 건설사업의 편익항목 선정에 관한 연구)

  • Kim, Man Kyeong;Jung, Hun Young;Lee, Sang Yong
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.26 no.1D
    • /
    • pp.41-47
    • /
    • 2006
  • The construction of traffic facilities has generated a variety of problems in the equality and efficiency when it would be planed and evaluated. One of the reasons for these phenomena isn't the definition of an objective standard about benefit items. Thus, results of evaluation couldn't give a demonstration of confidence. But, the traffic facility construction and its operation costs are securely appeared. Therefor, it will be demonstrated to decide the benefit items in this study. Before deciding the items, user's satisfaction evaluation and economic analysis would be carried. We find out subway user's satisfaction higher than load traffic mode user in satisfaction evaluation, while subway's economic feasibility is lower than load facility, as a result of B/C analysis. In this inconsistent results, we found out that the benefit value is a little lower because of indefinite standard of it's items as comparing Busan Metropolitan City's population with subway's modal split ratio. Accordingly, we enumerate some benefit items in the case of feasibility evaluation as constructing traffic facility. And each of evaluation items' weight is estimated by using ANP. We found out that the weight value of accessibility has the highest one, that of punctuality has second, that of travel time has third, and benefit items according to improvement of user's traffic condition have much more important than those which were considered in the existence economic analysis.

A Study on Secondary Lining Design of Tunnels Using Ground-Lining Interaction Model (지반-라이닝 상호작용 모델을 이용한 터널 2차라이닝 설계에 관한 연구)

  • Chang, Seok-Bue;Huh, Do-Hak;Moon, Hyun-Koo
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.8 no.4
    • /
    • pp.365-375
    • /
    • 2006
  • The structural analysis for the secondary lining of tunnels is generally performed by a frame analysis model. This model requires a ground loosening load estimated by some empirical methods, but the load is likely to be subjective and too large. The ground load acting on the secondary lining is due to the loss of the supporting function of the first support members such as shotcrete and rockbolts. Therefore, the equilibrium condition of the ground and the first support members should be considered to estimate the ground load acting on the secondary lining. Ground-lining interaction model, shortly GLI model, is developed on the basis of the concept that the secondary lining supports the ground deformation triggered by the loss of the support capacity of the first support members. Accordingly, the GLI model can take into account the ground load reflecting effectively not only the complex ground conditions but the installed conditions of the first support members. The load acting on the secondary lining besides the ground load includes the groundwater pressure and earthquake load. For the structural reinforcement of the secondary lining based on the ultimate strength design method, the factored load and various load combination should be considered. Since the GLI model has difficulty in dealing with the factored load, introduced in this study is the superposition principle in which the section moment and force of the secondary lining estimated for individual loads are multiplied by the load factors. Finally, the design method of the secondary lining using the GLI model is applied to the case of a shallow subway tunnel.

The Development of Equalizing Spacer for Minimization of Voltage Drop according to DC Feeder Extension (직류 급전선 증설에 따른 전압강하 최소화를 위한 균압 스페이서 개발)

  • Lee, Jae-Bong;Seo, Il-Kwon;Na, Youn-Il;Kim, Jae-Moon
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.63 no.7
    • /
    • pp.1013-1018
    • /
    • 2014
  • This paper described the development of equalizing spacer for minimization of voltage drop according to DC feeder extension. Power consumption is increased as shorter interval of train driving time and transportation capacity increase in urban subway. Therefore we investigated voltage drop of catenary at a point in case of traction driving of a train in parallel to the DC power supply system. Based on it's result, equalizing spacer is designed and fabrication to minimize the voltage drop in accordance with the power supply line arranged in three rows, and then its performance was confirmed that the stress distribution of main body and the distributed load are satisfied through the body structure modeling.

The Simulation and Experimental Study on the Bridge Response of AGT Bridge - Vehicle interaction System (AGT 시스템 교량-차량 상호작용에 의한 교량응답 시뮬레이션 및 실험)

  • Na, Sang-Ju;Kim, Ki-Bong;Song, Jae-Pil;Kim, Hyun-Ho
    • Proceedings of the KSR Conference
    • /
    • 2007.11a
    • /
    • pp.395-400
    • /
    • 2007
  • LRT(Light Railway Train), which is a intermediate system of train and bus, is arose for the solution of subway construction cost and the transportation capacity of bus. LRT was introduced in 1980's. About 30 local governments are plan to introduce LRT or constructing LRT, at present. AGT(Automated Guide-way Transit) system, which is a kind of LRT, is operated without driver. Rubber wheeled AGT system can reduce the noise and vibration compare to steel wheeled AGT, so it is estimated as ideal transportation system for urban area. And live loads at bridge are classified as the static load of vehicle and the dynamic wheel contact load which is occurred from the interaction of bridge and vehicle vibration, and the surface roughness. In the case of AGT system, the dynamic increment factor of bridge is greater than the normal train bridge and roadway bridge, because, the weight of AGT vehicle is more light that the train of truck. The exact method for dynamic increment factor is experiment. But this method is needed much money and time, moreover, this method cannot be adopted in design. Therefore, a simulation program for the interaction of AGT bridge, vehicle and surface roughness was developed, in this study. And the program was verified by experiment. As a result, the accuracy of the simulation program can be verified.

  • PDF

Calculation and field measurement of earth pressure in shield tunnels under the action of composite foundation

  • Chi Zhang;Shi-ju Ma;Yuan-cheng Guo;Ming-yu Li;Babak Safaei
    • Geomechanics and Engineering
    • /
    • v.34 no.1
    • /
    • pp.17-27
    • /
    • 2023
  • Taking a subway shield tunnel in a certain section of Zhengzhou Metro Line 5 as an example, the field tests of shield cutting cement-soil monopile composite foundation were carried out. The load and internal force of the tunnel lining under the action of composite foundation were tested on-site and the distribution characteristics and variation laws of earth pressure around the tunnel under the load holding state of the composite foundation were analyzed. Five different load combinations (i.e., overburden load theory + q0, Terzaghi's theory + q0, Bierbaumer's theory + q0, Xie's theory + q0, and the proposed method (the combination of compound weight method and Terzaghi's theory) + q0) were used to calculate the internal force of the tunnel structure and the obtained results were compared with the measured internal force results. The action mode of earth pressure on the tunnel lining structure was evaluated. Research results show that the earth pressure obtained by the calculation method proposed in this paper was more consistent with the measured value and the deviation between the two was within 5%. The distribution of the calculated internal force of the tunnel structure was more in line with the distribution law of field test data and the deviation between the calculated and measured values was small. This effectively verified the rationality and applicability of the proposed calculation method. Research results provided references for the design and evaluation of shield tunnels under the action of composite foundations.

The design of adaptive Controller for the Voltage Bus Conditioner for the improvement of the Power Quality in the DC Power Distribution System (DC 배전시스템의 품질향상을 위한 VBC 적응제어)

  • Woo, Hyun-Min;Lee, Byung-Hun;Chang, Han-Sol;La, Jae-Du;Kim, Young-Seok
    • Proceedings of the KSR Conference
    • /
    • 2011.10a
    • /
    • pp.2348-2356
    • /
    • 2011
  • In recent years, many researches for DC power distributed system (PDS) are being preformed and the importance of the DC PDS is more and more emphasized. Furthermore, in the railway system, the DC PDS is used in subway station lighting, facilities, etc. In the DC PDS, DC bus voltage instability may be occurred by the operation of multiple parallel loads such as pulsed power load, motor drive system, and constant power loads. Thus, good quality and high reliability for electric power are required and voltage bus conditioner (VBC) may be used the DC PDS. The VBC is a DC/DC converter for mitigation of the bus transients. In this paper, adaptive controller is designed. The simulation results by PSIM are presented for validating the proposed control algorithm.

  • PDF

Rolling Stock Fire Engineering aspect of System Engineering (System Engineering 측면에서 전동차 화재기술관리)

  • Chang, Jung-Hoon;Kang, Chan-Yong
    • Proceedings of the KSR Conference
    • /
    • 2005.05a
    • /
    • pp.163-168
    • /
    • 2005
  • In case of rolling stock, SEMS is generally applied in the advanced countries, but is start stage in our country. SEMS is defined the system engineering management system in order to achieve the optimized train performance among the several client requirements aspect of technical engineering management during the design life cycle. And the fire engineering activities in hong kong EMU project are introduced aspect of SEMS in this paper. The fire engineering at rolling stock in view of SEMS controls to apply the satisfied interior material by the fire safety standards (regulation of the commute urban subway safety guideline by the MOCT, BS 6853, NFPA 130, NF F 16-101) and to minimize the fire load in order that passengers egress safe from the fired rolling stock. The rolling stock in the advanced countries is designed to stand for 15-20 minutes in considering the rolling stock to be fired in tunnel. For passenger fire safety, the passenger evacuation provision and progress is set up.

  • PDF

A study of open cut box curvert tunnel strengthening systems in domestic underground railway (도시철도 개착식 터널의 내진성능보강시스템 개발에 대한 연구)

  • Kim, Ki-Hong;Kwon, Min-Ho;Kim, Jin-Ho;Hur, Jin-Ho
    • Proceedings of the KSR Conference
    • /
    • 2010.06a
    • /
    • pp.1132-1137
    • /
    • 2010
  • There are execute of new laws about prevent of earthquake diaster in nation because of some increments of big earthquake occurence frequency. Now develope new composit plate by ductile fiber with strong mechanic materials, which compose of strengthening systems for the underground structures subject to forced displacements. This study is to focus to develop the retrofitting system for the cut and cuver tunnels built without earthquake type load scenario, so that it can provide the safety of existing urban subway system against earthquakes.

  • PDF

A Study on the High Performance PWM Technique for a Propulsion System of Railway

  • Lee, K.J.;Jeong, M.K.;Bang, L.S.;Seo, K.D.;Kim, N.H.
    • Proceedings of the KIPE Conference
    • /
    • 1998.10a
    • /
    • pp.425-430
    • /
    • 1998
  • This paper presents a high performance low switching PWM technique for the propulsion system of railway such as subway and high speed train. In order to achieve the continuous voltage control to six-step and a low harmonics with low switching frequency under 500Hz, the synchronous PWM technique is combined with a space vector overmodulation and implemented by using DSP. Improved performance and a validation of proposed method are showed by the digital simulation and the experimental results using a 1.65MVA IGBT VVVF inverter and inertia load equivalent to 160 tons railway vehicles.

  • PDF

Analysis of Breaking Accident of FRP Insulator Rod installed in Dead Section (절연구간 조가선 FRP 절연봉의 절단사고 원인분석)

  • Jang, Don-Guk;Lee, Ki-Won;Kim, Ju-Rak;Park, Hyun-June
    • Proceedings of the Korean Institute of Electrical and Electronic Material Engineers Conference
    • /
    • 2003.07a
    • /
    • pp.502-505
    • /
    • 2003
  • The accidnet of breaking insulator rod leads to inturruption of moving the subway. We investigate the analysis of analysis of breaking accident of FRP insulator rod installed in dead section for catenary feeding system. To analysis of accident reason, SEM is used to analysis microscopic struture on surface of cross section of broken FRP insulator rod. At the same time, we examine the chage of atomic amount on solace of accident insulator through EDX analysis. Also, the test for tensional breaking load is condoled to check the mechanical strength.

  • PDF