• Title/Summary/Keyword: Subsurface dam

Search Result 35, Processing Time 0.024 seconds

A study on the flood runoff analysis with TANK MODEL (탱크 모델에 의한 홍수(洪水) 유출량(流出量) 해석(解析)에 관(關)한 연구(硏究))

  • Hong, Chang-sun;Choi, Han-kuy
    • Journal of Industrial Technology
    • /
    • v.3
    • /
    • pp.95-101
    • /
    • 1983
  • This study aims at the determination of the coefficienties of runoff and infiltration affecting runoff. The rating curve is more available than the peak flood runoff to determine flood control plan of flood control reservoir and the volume of hydroelectric power plant, or to make multipurpose dam. In hydrologic analysis and design, it is necessary to develop relations between precipitation and runoff, possible using some of the factors affecting runoff as parameters. In order to calculate the runoff discharge, the runoff process constituting elements are divided to the surface runoff, the subsurface runoff and the groundwater runoff. By comparing the computed hydrograph with the measured hydrograph, determinned the watershed TANK Model constant Varying the tank model constant for approximating the computed hydrograph to the measured hydrograph.

  • PDF

The Study on Constructing Underground Wall to Prevent Seawater Intrusion on Coastal Areas (지하수댐 물막이벽 시공법과 해안지역 염수침입 방지기술 개선 방안)

  • 부성안;이기철;김진성;정교철;고양수
    • The Journal of Engineering Geology
    • /
    • v.12 no.2
    • /
    • pp.215-234
    • /
    • 2002
  • Groundwater Dam is one of the reliable techniques to get huge amount of groundwater abstraction for municipal, agricultural, drinking, industrial water supply system. It can be a major technique to solve water shortage problems when it based on the sufficient watershed, proper topology, and adequate aquifer distribution and pollution control, Groundwater Dam had initiated its construction by RDC(former KARICO) in early eighties in Korea and 4 of it in total were added more until late eighty. However, this technique has shrunken its application due to gradually decreased yield rate after sever years of construction. After we studied several existing sites precisely, we concluded that the main reason of decreasing yield rate was come form engineering roughness on construction in early nineties. Theoretically, the technique itself seemed to be little detectives however, there were a little application in the fields in Korea. With the recent advance in engineering fields, those defects in construction would be no longer obstacle to construct underground wall and the technique could be a one of major ground water production technique in the future. It is essential to study following items thoroughly before select the appropriate site. The topography and the site of the underground wall, aquifer distribution, the specific technique for wall construction to block groundwater flow effectively and strict quality control during construction are critical. The surface and ground water monitoring data should be collected. Sustainability of the Groundwater Dam with huge groundwater abstraction in long term should be based on the long-term water balance analysis for each site. The water quality, environmental effect analysis and maintenance achedule should be also analyzed and planned in prior. It is suggested that the two consecutive underground wall in the coastal area to prevent seawater intrusion beneath a single wall.

Geostatistical Integration of MT and Borehole Data for RMR Evaluation (암반등급 평가를 위한 MT와 시추공 자료의 지구통계학적 복합해석)

  • Oh, Seok-Hoon;Chung, Ho-Joon;Lee, Duk-Kee
    • Geophysics and Geophysical Exploration
    • /
    • v.7 no.2
    • /
    • pp.121-129
    • /
    • 2004
  • The geostatistical approach was applied to integrate MT (Magneto-telluric) resistivity data and borehole information for the spatial RMR (Rock Mass Rating) evaluation. Generally, resistivity of the subsurface is believed to be positively related to the RMR, thus the resistivity and borehole RMR information was combined in a geostatistical approach. To relate the two different sets of data, we take the MT resistivity data as secondary information and estimate the RMR mean values at unsampled points by identification of the resistivity to the borehole data. Two types of approach are performed for the estimation of RMR mean values. Then the residuals of the RMR values around the borehole sites are geostatistically modeled to infer the spatial structure of difference between real RMR values and estimated mean values. Finally, this geostatistical estimation is added to the previous means. The result applied to a real situation shows prominent improvements to reflect the subsurface structure and spatial resolution of RMR information.

Numerical Simulation for Evaluation the Feasibility of Using Sand and Gravel Contaminated by Heavy Metals for Dam Embankment Materials (중금속으로 오염된 사력재의 댐축조 재료 활용 가능성 평가를 위한 수치 모델링)

  • Suk, Hee-Jun;Seo, Min-Woo;Kim, Hyoung-Soo;Lee, Jeong-Min
    • Economic and Environmental Geology
    • /
    • v.40 no.2 s.183
    • /
    • pp.209-221
    • /
    • 2007
  • Numerical analysis was performed to investigate the effect of heavy metal contamination on neighboring environment in case a dam is constructed by using rockfill materials contaminated by heavy metals. The numerical simulation carried out in this research includes both subsurface flow and contaminant transport in the inside of the CFRD(Concrete Faced Rockfill Dam), using two commercial programs, SEEP2D and FEMWATER. The three representative cases of scenarios were chosen to consider a variety of cases occurring in a dam site; (1) Scenario 1 : no crack in the concrete face slab, (2) Scenario 2 : a crack In the upper part of face slab, and (3) Scenario 3 : a crack between plinth and face slab in the lower part of face slab. As a result of seepage analysis, the amount of seepage in scenario 2 was calculated as $14.31\sim14.924m^3/day$ per unit width, corresponding to the 1,000 times higher value than that in other scenarios. Also, in the simulation of contaminant transport by using FEMWATER, specified contaminant concentration of 13 ppb in main rockfill zone was set to consider continuous leakage from the rock materials. Through the analysis of contaminant transport, we found that elapsed times to take for the contaminant concentration of about 2 ppb to arrive at the end of a dam are as follows. Scenario 1 has the elapsed time of 55,000 years. In Scenario 2. it is 50 years. Finally, scenario 3 has 27,000 years. The rapid transport of the contaminant in scenario 2 was attributed to greater seepage flow by 500 times than other scenarios. Although, in case of upper crack in the face slab, it was identified that the contaminant might transport to the end of a dam within 100 years with about 2 ppb concentration, however, it happened that the contaminant was hardly transported out of the dam in other scenarios, which correspond to either no crack or a crack between plinth and face slab. In conclusion, the numerical analysis showed that the alternative usage of the contaminated sand and gravel as the dam embankment material can be one of the feasible methods with the assumption that the cracks in a face slab could be controlled adequately.

A Study on the Heavy Metal Contents of Soil and Rice in the Kum River Basin (금강유역 논토양과 현미의 중금속 함량에 관한 연군)

  • Kim, Young-Oh;Yoo, Hyung-Yul;Lee, Jae-Hyung;Ki, No-Suk;Hwang, In-Dam
    • Journal of Preventive Medicine and Public Health
    • /
    • v.21 no.2 s.24
    • /
    • pp.320-328
    • /
    • 1988
  • This study was carried out to investigate the heavy metal contents and their correlationship between paddy soil and brown rice near the Kum-River area. In this study, eighty soil samples and forty brown rice samples were taken from the paddy soil. The contents of heavy metals were measured by flame atomic absorption spectrophotometry. The results were as follows: 1. The average contents of soluble heavy metals in surface soil were Cd 0.19, Cu 15.31, Zn 18.10 and Pb 9.08 ppm. The average contents of soluble heavy metals in subsurface soil were Cd 0.19, Cu 14.52, Zn 17.75 and Pb 8.11 ppm. There was no statistically significant difference between the two layers. 2. The contens of Cu, Zn and Pb of Taejeon(S6) and Cd of Sinbyung(S5) in surface soil were higher than those of other areas. The contents of Cd and Cu of Taejeon(S6) and Zn and Pb of Kumnam(S3) in brown rice were higher than those of other areas and four heavy metals in soil and brown rice of Simchon(S7) were lower than those of other areas. 3. The ratio of soluble contents(Cd:Cu:Zn:Pb) in surface soil was 1:79:93:47, that of soluble contents in subsurface soil was 1:76:94:43, and that of total contents in brown rice was 1:84:294:12. 4. The correlationship of the content between soluble heavy metals in surface(0-15 cm depth) soil total heavy metals in brown rice was found to be order of Cd>Cu>Zn>Pb. The correlationship of the content between soluble heavy metals in subsurface(20-30 cm depth) soil and total heavy metals in brownricewasfoundtobeorderofcu>Cd>Zn>Pb.

  • PDF

Distribution and Behavior of Mixed Contaminants, Explosives and Heavy Metals, at a Small Scale Military Shooting Range (국내 소규모 군사격장 복합오염물질(화약물질 및 중금속)의 분포 및 거동)

  • Park, Seokhyo;Bae, Bumhan;Kim, Minkyung;Chang, Yoonyoung
    • Journal of Korean Society on Water Environment
    • /
    • v.24 no.5
    • /
    • pp.523-532
    • /
    • 2008
  • A phase II site investigation and feasibility study was conducted at a military mortar shooting range near the demilitarized zone (Kyunggi, South Korea) to assess the extent of contaminants migration to the nearby Imjin river in which a flood control dam is under construction. The results showed that silty-clay soils around target areas were co-contaminated with heavy metals (Cd, Cu, and Pb) and explosives (HMX, RDX, and TNT). The total amount of contaminant was estimated to be 497.1 kg-RDX, 20.6 kg-HMX, 1.4 kg-TNT, 35.2 kg-Cd, 4,331 kg-Cu, and 5,115 kg-Pb, respectively. Both heavy metals and explosives were almost equally distributed on each soil particle size fraction. Neither subsurface soil samples nor ground water samples showed signs of contamination above the environmental criteria. The major migration route of contaminants was soil particles in surface run-off during rain at which a mass discharge rate of 30.0 mg-RDX/hour was observed.

A Study of the Management of Groundwater Reservoir by Numerical Three Dimensional Flow Model (3차원 흐름모델을 이용한 지하저수지의 관리에 대한 연구)

  • 신방웅;김희성
    • The Journal of Engineering Geology
    • /
    • v.5 no.3
    • /
    • pp.289-300
    • /
    • 1995
  • At the initial stage of the underground reservoir design one should thoroughly consider surface and subsurface hydrology, hydrogeologic characteristics of aquifer system, and the function of cut - off wall because it is linked to the effective management. In this study, three dimensional finite difference model was applied to analyse the function of Ian underground reservoir at Kyungbuk Province. The steady and unsteady state conditions after construction of the underground dam were simulated through the model, and from these results the groundwater budget and the safe yield were determined. The model simulation indicates the infiltration of irrigation water to be one of the major factors of seasonal fluctuation of groundwater level. The recharge rates of irrigation water were estimated as 4.3mm/d during May and June, and 1.7mm/d during July and Agust. Groundwater recharge from the watershed area estimated to about $0.04m^3/s$, almost consistent through the year. In 1984, groundwater discharge through the transverse section of the dam was $0.002m^3/s$ and the optimum yield for two momths(July and Aguest)was $254000m^3$, however, the discharge became $0.013m^3/s$ in1993, implying the failure of cut -off function. without appropaiate of the cut - off wall, optiumum yield during the irrigaton period would be $93, 000m^3$.

  • PDF

Time-lapse Inversion of 2D Resistivity Monitoring Data (2차원 전기비저항 모니터링 자료의 시간경과 역산)

  • Kim, Ki-Ju;Cho, In-Ky;Jeoung, Jae-Hyeung
    • Geophysics and Geophysical Exploration
    • /
    • v.11 no.4
    • /
    • pp.326-334
    • /
    • 2008
  • The resistivity method has been used to image the electrical properties of the subsurface. Especially, this method has become suitable for monitoring since data could be rapidly and automatically acquired. In this study, we developed a time-lapse inversion algorithm for the interpretation of resistivity monitoring data. The developed inversion algorithm imposes a big penalty on the model parameter with small change, while a minimal penalty on the model parameter with large change compared to the reference model. Through the numerical experiments, we can ensure that the time-lapse inversion result shows more accurate and focused image where model parameters have changed. Also, applying the timelapse inversion method to the leakage detection of an embankment dam, we can confirm that there are three major leakage zones, but they have not changed over time.

Modelling of Permeability Reduction of Soil Filters due to Clogging (흙 필터재의 폐색으로 인한 투수성 저하 모델 개발)

  • ;;Reddi, Lakshmi.N
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 1999.10a
    • /
    • pp.271-278
    • /
    • 1999
  • Soil filters are commonly used to protect the soil structures from eroding and piping. When filters are clogged by fine particles which are progressively accumulated, these may lead to buildup of excessive pore pressures also leading to instability in subsurface infrastructure. A filter in the backfill of a retaining wall, a filter adjacent to the lining of a tunnel, or a filter in the bottom of an earth dam can be clogged by transported fine particles. This causes reduction in the permeability, which in turn may lead to intolerable decreases in their drainage capacity. In this thesis, the extent of this reduction is addressed using results from both experimental and theoretical investigations. In the experimental phase, the permeability reduction of a filter is monitored when an influent of constant concentration flows into the filter (uncoupled test), and when the water flow through the soil-filter system to simulate an in-situ condition (coupled test), respectively. The results of coupled and uncoupled test are compared with among others. In the theoretical phase of the investigation, a representative elemental volume of the soil filter was modeled as an ensemble of capillary tubes and the permeability reduction due to physical clogging was simulated using basic principles of flow in cylindrical tubes. In general, it was found that the permeability was reduced by at least one order of magnitude, and that the results from the uncoupled test and theoretical investigations were in good agreement. It is observed that the amount of deposited particles of the coupled test matches fairly well with that of the uncoupled test, which indicates that the prediction of permeability reduction is possible by preforming the uncoupled test instead of the coupled test, and/or by utilizing the theoretical model.

  • PDF

Trend and Barrier in the Patents of Artificial Recharge for Securing Goundwater (지하수자원 확보를 위한 인공함양 기술 특허동향 및 장벽 분석)

  • Kim, Yong-Cheol;Seo, Jeong-A;Ko, Kyung-Seok
    • Journal of Soil and Groundwater Environment
    • /
    • v.17 no.3
    • /
    • pp.59-75
    • /
    • 2012
  • It is getting difficult to manage water resources in South Korea because more than half of annual precipitation is concentrated in the summer season and its intensity is getting severe due to global warming and climate change. Artificial recharge schemes can be a useful method to manage water resources in Korea adapting to climate change. Patent analysis enables us to prevent overlapping investment and to find out unoccupied technology. In this study, international patent trends and barriers of artificial recharge technology are analysed for patents of Korea, Japan, the United States and Europe. The four artificial recharge methods such as well recharge, surface infiltration, bank filtration and underground structures are classified as main class and the nine sub-technologies such as water intake, water treatment, injection wells, monitoring of groundwater flow, groundwater pumping, surface infiltration/soil aquifer treatment, radial collection well, iron/manganese treatment, and underground subsurface dam are classified as intermediate class. Water intake techniques are subdivided into five classifications. Total 1,281 of patents, searched by WIPS DB tool and selected after removing noisy patents, are analyzed quantitatively to evaluate application trends by year, applicant, country for each classified technologies and analyzed qualitatively to find out occupied and unoccupied technologies. It is expected that upcoming research and development project could be performed efficiently in that an avoidance plan for the similar patents and differentiation plan for the advancing patents are set up based on the quantitative and qualitative analysis results from this research.