• 제목/요약/키워드: Substandard Construction Project

검색결과 3건 처리시간 0.012초

Factors Affecting Quality Management Failure in Construction Projects

  • Lee, Seulki;Yu, Joungho
    • 한국건설관리학회논문집
    • /
    • 제25권4호
    • /
    • pp.66-81
    • /
    • 2024
  • Identifying the root causes of substandard construction projects is crucial considering the social and economic issues structural failures can cause. To date, the focus has predominantly been on identifying and penalizing the culprits rather than uncovering the fundamental reasons. Therefore, this study aims to identify various factors that contribute to failures in construction project quality management, including aspects of substandard construction projects, and determine the relationship between these factors and substandard construction projects. Through a literature review and case analysis, 61 influential factors were identified. A survey targeting participants including structural designers, architectural designers, construction companies, CM, and researchers was conducted to gauge the consensus on these factors. A regression analysis was performed based on data from 724 survey respondents. Ultimately, based on the 17 key influencing factors identified by the regression analysis, 9 preventive measures against substandard construction projects were proposed. This study is significant as it elucidates the reasons behind construction project quality management failures that lead to substandard construction projects and establishes a framework for developing practical solutions to real-world problems rather than theoretical or abstract ones.

공동주택 리모델링 사업관리를 위한 영향요인 분석 -시공단계를 중심으로- (An Analysis of Influence Factors for the Remodeling Project Management of Apartment Buildings -Focused on Construction Phase-)

  • 심규정;서종민;나영주;송용식;김선국
    • KIEAE Journal
    • /
    • 제8권5호
    • /
    • pp.77-83
    • /
    • 2008
  • Housing development, particularly apartment buildings, has been increasingly growing due to the construction promotion policy of the government since the 1980s. However such a volume-oriented policy results in unfavorable side effect of substandard quality and early deterioration in line with the expansion in volume. As part of measures to deal with the problems, rebuilding and remodeling have surfaced as alternative recently. Remodeling is expected to create the more benefits, compared to the rebuilding, in cost, efficiency and duration. To come up with the solution to such a challenge, it's necessary to analyze the influence factors of remodeling. Hence, the study was intended to compare the remodeling in the aspect of influence factors. The results of this study is expected to the propose of effectual management factors of the remodeling construction.

최저통합환산가격 개념을 적용한 기술제안 기반 입찰제도 (Technical Proposal based Bidding System Applying the Concept of the Lowest Total Combined Bid Price for Supplying Affordable Housing)

  • 조건희;강승희;이정석;손정락;방종대
    • 한국건설관리학회논문집
    • /
    • 제11권2호
    • /
    • pp.94-105
    • /
    • 2010
  • 최근 도시내 기반시설이 노후화된 불량지구에 거주하는 사회적 약자(저소득층, 도시빈곤층)가 도시재생과정에서 지불능력한계 등에 의하여 재정착하지 못하고 있는 문제는 사회적 이슈로 부각되고 있다. 이에 본 연구에서는 사회적 약자의 재정착을 위한 방안 중 하나로 '입찰가격 최적화 및 생산비용 절감', '공기단축을 통한 비용절감', '적정 품질 만족'을 목적으로 한 '최저통합환산가격(입찰가격+공사기간환산가격) 개념의 기술제안 기반 입찰제도'를 제시하였으며, 이는 프로젝트단위 기술제안, 공종단위 기술제안, 공기단축 기술제안을 기반으로 이루어진다. 본 연구에서 제안한 최저통합환산가격 개념의 기술제안 기반 입찰제도는 공기단축에 의한 추가적인 인력 및 장비의 투입과 품질향상 등에 의하여 직접비는 상승되나 공기단축에 의한 발주자 비용, 감리비, 원주민 보상비에 대한 이자비용, 간접비, 이자 지급비, 물가 상승비 등의 절감이 기대된다. 이와 더불어 공기단축 및 공사비 절감 관련 기술 지식의 축적은 향후 프로젝트 공사비 및 공사기간 최적화가 가능함은 물론 국가 및 기업 경쟁력 향상이 기대된다.