• Title/Summary/Keyword: Structure restoration

Search Result 795, Processing Time 0.035 seconds

Evaluation of Characteristics for Stress Distribution on Cylindrical Beam Structure by Deformation and Restoration Process (변형 및 복원공정에 따른 실린더 형상 구조물의 응력분포 특성)

  • Park Chi-Yong;Kim Jin-Weon;Boo Myung-Hwan
    • Transactions of the Korean Society of Mechanical Engineers A
    • /
    • v.29 no.1 s.232
    • /
    • pp.132-138
    • /
    • 2005
  • In heavy industrial fields such as power plant and chemical plant, it is often necessary to restore damaged part of large machinery and structure which is installed in the hazard working place. In this paper, to estimate stress distribution which occurs during damage and restoration of cylindrical beam structure, the finite element technique has been used. A finite element model was verified by experiment for non deformed cylindrical beam structure. The displacements and elastic recovery have an excellent agreement between experiment and finite element analysis. The variations of stress distribution on deformation and restoration procedure for surfaces have been examined. The maximum von Mises stress appears in the surface for deformation and restoration procedure. In deformation procedure, the maximum stress occurs in the vicinity of support body. In restoration procedure, the maximum stress occurs in the vicinity of the fixing body. The fixing body allows avoiding stress concentration in adjacent support structure boundary.

Evaluation of Railroad Restoration Technology using Quick-reaction Expansible Resins (급속 팽창성 수지를 이용한 철로침하 복원공법의 평가)

  • Shin, Eun-Chul;Son, Won-Ik;Kim, Sung-Hwan;Kan, Hyoun-Hoi
    • Proceedings of the KSR Conference
    • /
    • 2007.05a
    • /
    • pp.1789-1795
    • /
    • 2007
  • Railroad, the structure maintenance and restoration project was increased and widely performed in concrete pavement road and airport, building at downtown area, bridge abutment, and other concrete structures. Especially, the ground reinforcement technique by quick-reaction expansible resins is the most effective countermeasures against differential settlement and undesired deformation of structure. In this paper, the unconfined compressive strength and some environmental related tests were conducted to evaluate compressive strength and environmental effect of quick-reaction expansive resins and soil mixtures. Also, three case histories of concrete structure and railroad restoration project are presented. Based on the laboratory test, the quick-reaction expansible resins and soil mixture represent the sufficient compressive strength and the leachate material is satisfied the environmental regulation limits. As a result of this study, the structure restoration technology using quick-reaction expansible resins is very effective for restoration of differential settlement and deformation, and it is environmentally sustainable technology.

  • PDF

Landscape Structure and Ecological Restoration of Mt. Hwangryung in Pusan, korea (부산시 황령산의 경관구조와 생태적 복원)

  • 이창석;조현제
    • The Korean Journal of Ecology
    • /
    • v.21 no.6
    • /
    • pp.791-797
    • /
    • 1998
  • An attempt to clarify the landscape structure of urban areas was carried out on Mt. Hwangryung located in the center of Pusan, southern Korea. By means of aerial photographs and field survey, a vegetation map including land-use pattern was made. Landscape structure was described by analyzing the vegetation map. Landscape element types were classified into secondary forest, introduced plantation, and other elements including urbanized area. almus firma and Pinus thunbergii communities, introduced plantation elements, formed matrix and some secondary forest elements and the other artificial plantations of small scale tended to distribute as small patches in such matrix. The number of patches per unit area in secondary forest elements was more than that in introduced plantation element. The result on patech size was vice versa. As the results of landscape ecological analyses, it was estimated that differentiation of patches recognized in community level would be related to artificial interference and those in sub-communities levels to natural process such as progression of succession. On the other hand, restoration plans in viewpoints of restoration and landscape ecology were suggested to improve ecological quality of Mt. hwangryung.

  • PDF

Change in the Wetland Vegetation Structure after the Ecological Restoration (생태복원 습지의 조성 후 식생구조 변화)

  • Kim, Na-Yeong;Song, Young-Keun;Lee, Kun-Ho
    • Journal of the Korean Society of Environmental Restoration Technology
    • /
    • v.21 no.6
    • /
    • pp.95-113
    • /
    • 2018
  • We studied the change of wetland vegetation structure to understand ecological restoration process of wetlands through the field survey of ecological restoration projects in Incheon, Iksan and Busan. We compared the vegetation plan at the time of planted with the results of the vegetation monitoring in 2018, and analyzed the changes in wetland vegetation structure. Based on results, we attempted to understand the restoration process of those wetlands and discuss the management measures for sustainable wetland restoration. As a result, in the Incheon Yeonhee restoration wetland, the number of plant species was increased, from 18 species in 2016 to 29 in 2018. The dominant species, Myriophyllum verticillatum, covered the wetland most and its occupied area was increased. On the other hand, the distribution area of the planted emergent hydrophytes was reduced. The area of open water decreased from 71.7% in 2016 to 48.8% in 2018. In Busan Igidae restoration wetland, the number of plant species was increased, from 6 species in 2014 to 31 in 2018. The dominant species was Myriophyllum verticillatum and its occupied area was increased. The area of floating plant communities that planned has decreased. The open water area decreased from 83.9% in 2014 to 31.8% in 2018. In Iksan Sorasan restoration wetland, the number of plant species was increased, from 13 species in 2016 to 36 in 2018. The dominant species was Phragmites communis Trin. and its occupied area was increased. The other planted species showed a tendency to be decreased by Phragmites communis Trin. and its terrestrialization. The open water area decreased from 86.6% in 2016 to 6.7% in 2018. These results suggest that wetlands should be managed by considering the change of vegetation structure and open water areas based on the following succession process, because it affects the habitat suitability of wetland organisms and biodiversity as well. Thus, the continuous monitoring for the ecological structure of restored wetland is important, and it could be possible step to develop sustainable wetland ecological restoration model.

On the Plans of Kyongju's Sokkuram Restoration Project (1961) by Pai Ki Hyung (배기형의 「경주 석굴암 보수공사 설계도」(1961)에 관한 고찰)

  • Woo, Don-Son;Kim, Tae-hyung
    • Journal of architectural history
    • /
    • v.28 no.2
    • /
    • pp.53-64
    • /
    • 2019
  • This study examines the restoration project of Sokkuram, and introduces its preliminary plans by the architect Pai Ki Hyung. The restoration project started in 1958 with an inquiry committee of the restoration project, and was completed in 1964. Despite having undergone extensive repair work under Japanese supervision from 1913 and 1923, the repair work caused water leakages inside Sokkuram, and regular cleaning work that began in 1933 caused a lot of damage to the sculpture. In result of the surveys, the top priority of this project was to protect the sculptures inside Sokkuram by improving the environment of the cave. At that time, the architect Mr. Pai participated as a head of the fourth field surveyors to plan the restoration project and to design the preliminary plans. He proposed the installation of a double dome structure to prevent further water leakages on the concrete addition that was built up around the grotto by the Japanese. However, in 1961, the Cultural Heritage Committee of Korea examined the plans of Mr. Pai and immediately rejected them. The factors of the rejection were the omitting of entrance design, system of new double dome structure that presses the existing structure, and these changes that had to be made outside of the drainage plans. The repair work of Sokkuram began in 1961, and the main construction was building double dome structure and entrance installation. In this we realize that Mr. Pai's double dome structure plans were very important key concept of this project. This study attempts to demonstrate the double dome installations that Mr. Pai initially proposed, which ultimately remains as emblematic factors of Sokkuram's legacy.

A Study on the Restoration System for Distribution Networks Using Dynamic Division Method (동적분할 기법을 이용한 배전망의 정전복구 시스템에 관한 연구)

  • 임찬호
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.17 no.3
    • /
    • pp.64-72
    • /
    • 2003
  • Comparing with transmission networks, the faults in distribution networks more often occurs because of the complicated structure and the adjacency to customers. Moreover the faults give direct damage to customers. So fault diagnosis and blackout restoration in distribution networks are very important elements to reduce the damage of customers and to maintain the stability. The restoration problem of distribution networks is subject to time. Minimizing the switching numbers in restoration process is the crucial element. In other words. the best restoration is to restore all blackout area through just one switching, if not the restoration has to be accomplished through several switching. This paper proposes the efficient restoration system in distribution networks to minimize the switching numbers. The proposed system uses the dynamic division method of hierarchical structure which consists of heuristic searching method and meta algorithm. The proposed system is applied to the sample networks, and the results showed a promising possibility.

A Study on the Usefulness of the Ridge in Open Space and Landscape Planning (녹지 및 경관계획에 있어서 능선의 효용성에 관한 연구)

  • Lee, Won-Young;Choi, Hyung-Seok
    • Journal of the Korean Society of Environmental Restoration Technology
    • /
    • v.6 no.5
    • /
    • pp.70-78
    • /
    • 2003
  • From the viewpoint of the importance of the division theory based on topography(pyungsu) derived from the uniqueness in topography, not to mention of the function of ridge in ruban areas, the destroy of ridges should be prevented from the development of hill areas. This study intends to propose the basic concepts and principles to protect the ridge axis with green in open space and landscape planning. The main results are summarized as follows : First, eco-bridge across the ridges will be connected for the purpose of ecosystem restoration. Second, the protection and restoration of green ridge axis can be completed by Green Structure Plan which has principles and standards such as. - layout of development axis and establishment of rules on preservation - the practical use of various preservation methods and the standards suitable to the methods - laying down the standards of restoration according to the height from ground level - the application of zoning such as height district and urban design for preservation Finally, the design of implementation tools must be needed for protection and restoration.

On the Plans of Gyeongju Seokguram Grotto Restoration Project (1961-1962) by Kim Chung Up (김중업의 「경주 석굴암 보수공사 설계」(1961-1962)에 관한 고찰)

  • Woo, Don-Son;Kim, Tae-hyung
    • Journal of architectural history
    • /
    • v.30 no.4
    • /
    • pp.41-52
    • /
    • 2021
  • This study examines the Gyeongju Seokguram Grotto restoration project (1961-1962) by architect Kim Chung Up (1922-1988) and introduces the documents he wrote at the time of planning. The study highlights Kim's Plan attempt to adopt Buckminster Fuller's idea of the Geodesic Dome, while inheriting the architect Pai Ki Hyung's previous design plan which was nullified. As Seokguram Grotto's water leak and deterioration issues have been brought up, the four-times survey was carried out by experts team between 1958 and 1960, under Ministry of Education's direction. Pai designed an initial restoration plan based on the survey's result, which was a double-dome structure with a concrete film on the outer periphery as a way to protect Seokguram Grotto in January 1961. However, as drawbacks, such as the heavy load of the concrete dome, and non-installation of entrance hall, have been indicated in the review process, the Cultural Properties Committee rejected the plan. Subsequently, Kim was appointed as the supervisor of the second restoration project. Kim drew up a process management schedule to be implemented from August 1961 to December 1963 and designed the conception plans for the second restoration design. This study analyzes Kim's Plan by examining sketches, site plans, floor plans, and sections. Kim planned to maintain the idea of the double-dome structure proposed by Pai while applying Buckminster Fuller's idea of the Geodesic Dome. Kim planned to lighten the dome structure by applying a steel-frame Geodesic Dome so that the dome structure could be supported by its own. The study is expected to reclaim the omitted parts from Seokguram Grotto's historical description and Kim's careers.

FINITE ELEMENT ANALYSIS OF STRESS DISTRIBUTION ACCORDING TO THE METHOD OF RESTORATION AFTER ROOT CANAL THERAPY (상악 소구치 근관치료후 수복방법에 따른 응력 분포의 유한 요소 분석)

  • Lee, Chung-Sik;Lee, Jae-Young;Cho, Hyo-Sun
    • Restorative Dentistry and Endodontics
    • /
    • v.21 no.1
    • /
    • pp.339-352
    • /
    • 1996
  • Many dentists have been taken an interest in restoration of severly damaged teeth after endodontic treatment and it is a true that there are lots of studies about it. In these days, although we have used Para-Post, pins, threaded steel post, cast gold post and core, and so on, as a method of restoration frequently, it has been in controversy with the effects of them on the teeth and surrounding periodontal tissue. In this study, we assume that the crown of the upper 1st premolar was severly damaged, and after the root canal therapy, two most common types of restoration were carried out ; 1) coronal-radicular amalgam restoration, 2) after setting up the Para-Post, restore with amalgam core and gold crown. After restoration, in order to present the concentration of stress at internal portion of the tooth and the surrounding periodontal tissue, we doveloped a 2-dimensional finite element model of labiopalatal section, then loaded forces from 2 long perpendicular to the lingual incline of buccal ridge an the middle point, parallel to the long direction axis of tooth at the fossa-were applied. The analyzed results were as follows : 1. Stress of the normal first premolar was concentrated on the most weakest anatomical structure, that is, cervical area, and no stress on the bifurcated area of the canal. 2. Crown restoration after root canal therapy causes large stress concentration on the bifurcated area of the canal. This stress concentration has larger value in case of lateral movement of mandible, and there are decrease in the stress concentration compared with natural tooth. 3. Coronal-radicular amalgam restoration method transports more stress to the tooth structure than restoration using Para-Post. 4. There are more stress concentration around Para-Post in the case of lateral movement, and we have more favo rable result when restored with Para-Post. 5. Generally, stress in the lateral movement is larger than stress in the perpendicular load.

  • PDF

A Study on Expert System for Power System Restoration (정전구역 해소를 위한 전문가 시스템 연구)

  • Park, Young-Moon;Yoon, Jae-Seung;Lee, Kwang-Ho
    • Proceedings of the KIEE Conference
    • /
    • 1992.07a
    • /
    • pp.190-192
    • /
    • 1992
  • This paper introduces an expert system for the automation of power system restoration. We focus on following two points : a) Data Structure which can describe power system and ensure the efficient search and b) Restoration Strategy which performs faster black-out restoration with fewer switching operations and overload alleviation using sensitivity. Some examples are used to illustrate the capabilities of the proposed expert system.

  • PDF