• Title/Summary/Keyword: Stress measurements on shotcrete

Search Result 5, Processing Time 0.022 seconds

Case Studies for the Stress Measurements on the Shotcrete Tunnel Lining (터널에서의 숏크리트 응력 측정 사례 연구)

  • Kim, Hak Joon;Kim, Mi-Ran
    • The Journal of Engineering Geology
    • /
    • v.24 no.1
    • /
    • pp.81-89
    • /
    • 2014
  • Stress measurements of shotcrete lining were performed to evaluate the stability of the primary lining and to determine the thickness and the construction timing of the secondary lining. The current situation of stress measurements of shotcrete and problems related to judging the safety of shotcrete linings are presented, based on the results of several case studies. An improved method of performing stress measurements on shotcrete lining is also presented. In evaluating the safety of shotcrete lining, the use of absolute values of measured stresses would improve the reliability of the measurements.

Suggestion for the improvement of the field measurements on the shotcrete lining (터널 숏크리트 계측의 개선방안)

  • Kim, Hak-Joon;Park, Si-Hyun;Bae, Gyu-Jin
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.12 no.2
    • /
    • pp.177-192
    • /
    • 2010
  • The field measurements on the shotcrete lining are usually performed during the tunnel construction. However, the credibility of the measurements is not certain because of the non-stress related strains occurring in the shotcrete, the uncertainty of the deformation modulus of the shotcrete, and the intrinsic difficulties involved in the strain measurements in the shotcrete. The problem related to the field measurements on the shotcrete is investigated using the review of the previous studies and the field measurement performed for this study. A method for the correction of stress measurements at the shotcrete lining, considering the non-stress related strains, is suggested using the literature review and the actual measurements obtained from the non-stress shotcretes. The deformation modulus used for the calculation of the stress acting on the shotcrete is also suggested.

Performance Verification and Reliability Test of Tunnel Shotcrete Stressmeter (터널 숏크리트 응력계의 성능검증과 신뢰성 시험 연구)

  • Kim, Yeong-Bae;Park, Yeong-Bae;Lee, Seong-Won;Lee, Kang-Il
    • Journal of the Korean Geotechnical Society
    • /
    • v.40 no.4
    • /
    • pp.113-126
    • /
    • 2024
  • Shotcrete lining is an important material for the stability of tunnels in NATM tunnels. However, stressmeters for stress measurements of shotcrete lining are installed in the field without performance verification because of a lack of research on methods, procedures, regulations, and reliability of measurement equipment. To solve this problem, all shotcrete stressmeters currently used in Korea were investigated. For each stressmeter, external inspection and structural and functional inspection were performed to identify defects and problems in devices. For this purpose, a shotcrete stressmeter performance test device capable of load loading in stages was developed and obtained KOLAS certification. Using the device, stressmeter performance tests were conducted. Structural problems of integrated- and cell-type shotcrete stressmeters were identified through concrete mold tests, and improvement plans and performance verification procedures were suggested. The results of this study are expected to contribute to the preparation of regulations for the performance verification of shotcrete stressmeters and the selection of measuring instruments in the field in the future.

A Basic Study on Change Aspect of Displacement and Stress in NATM Tunnel Excavation (터널굴착 중 발생하는 변위 및 응력의 변화양상에 대한 기초적인 연구)

  • Jeong In Cheol;Park Jong Kwan;Lee Jun Seok;Lee Seung Do
    • Proceedings of the KSR Conference
    • /
    • 2005.11a
    • /
    • pp.860-865
    • /
    • 2005
  • In Korea, NATM (New Austrian Tunneling Method) has widely been used in order for constructing tunnels. The major support materials of the method are the shotcrete and rock bolt together with the arch-shaped tunnel section, which ensure the inherent strength of the rock masses. One of the most important features of the method is the feedback system between tunnel analyses and measurements, such as tunnel displacement and support stresses. This study, therefore, attempts to examine the difference in displacement and stresses between numerical results. and measurements in order for more practical design and construction of tunnels.

  • PDF

Application of the SASW Method to the Evaluation of Grouting Performance for a Soft Ground of a Tunnel (터널 원지반의 그라우팅 보강 평가를 위한 SASW 기법의 적용)

  • 조미라;강태호
    • Journal of the Korean Geotechnical Society
    • /
    • v.19 no.6
    • /
    • pp.273-283
    • /
    • 2003
  • Fissured rock and soft ground always suggest, problems in the construction of the underground space. The stress release of the weak underground material by opening the underground space with a soft ground, fissures and joints can lead to the failure of the opening. Grouting of the weak rock and the soft ground, which is a process of injecting some bonding agents into the soft ground, is one of the measures to reinforce the soft ground and to prohibit the failure of the underground construction due to the stress release. The proper installation of the grouting is essential to ensuring the safety of the tunneling operation, so that the evaluation of the grouting performance is very significant. The general procedure of evaluating the grouting is coring the grouted section and measuring the compression strength of the core. However, sometimes when the grouted section is at the crown of the tunnel and the grouting is installed at a wide section, the coring is not good enough. This study is oriented to propose a new and a non-destructive procedure of evaluating the grouting performance. The proposed method is based on the wave propagation of elastic waves, and evaluates the shear stiffness of the ground and investigates the anomalies such as voids and cracks. The SASW ( Spectral-Analysis-of-Surface-Waves) method is one of the candidate s to make the inspection of the pouting performance, and is adopted in this study. The practical grouting activity was monitored by SASW method, and the proposed method was applied to the inspection of the grouting performance to check the verification of the proposed method.