2-Arch 터널의 중앙벽체에 작용하는 하중산정 (The Evaluation of the Loads Acting on the Pillar in Two-Arch Tunnel)

  • 도종남;오규철;천병식
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2007년도 춘계학술대회 논문집
    • /
    • pp.1774-1781
    • /
    • 2007
  • In this study, Matsuda's formula, which has been used to evaluate the acting load on the concrete pillar in 2-Arch tunnels, is investigated and a load reduction factor $({\alpha})$, which has been estimated from numerical parametric studies, is proposed for a better design of 2-Arch tunnels in the future. Numerical parametric studies show that the concrete pillar is subjected to a stress concentration on the excavation side during the first tunnel driving and when tunnel excavation is completed, the induced stress on the pillar in a poor quality of ground condition is 1.5 to 1.8 times the stress developed during the first tunnel driving. In addition, the numerical studies indicate that the acting load on the pillar is in the range of $14{\sim}83%$ of the load estimated by Matsuda's formula. From these results, a load reduction factor $({\alpha})$ is determined and it would make 2-Arch tunnel design more economically.

  • PDF

병렬터널 필라부 거동에 대한 수치해석 검토 (A Study on Pillar Behavior of Twin Parallel Tunnels by Numerical Approach)

  • 변요셉;김현기;이상수;천병식
    • 한국지반환경공학회 논문집
    • /
    • 제11권8호
    • /
    • pp.49-55
    • /
    • 2010
  • 병렬터널의 이격거리가 근접할수록 응력집중으로 인하여 필라(pillar)의 파괴 위험이 큰 만큼 필라의 응력 검토 및 필라의 강도를 고려한 필라의 안정성 평가는 병렬터널의 이격거리 검토 시 매우 중요한 사항이다. 본 연구에서는 필라의 안정성을 구하는 방법 중 하나인 수치해석의 요소크기를 검토하여 필라부 안정성 검토에 대한 체계적인 분석을 제안하였다. 그 결과, 강도응력비는 요소크기에 따른 영향이 크게 없었고, 강도강소법에 의한 안전율은 요소가 작을수록 안전율이 작게 나왔다. 특히 지반이 풍화암인 경우 요소크기에 대한 안전율 값 차이가 크므로 지반이 불량한 경우 요소의 크기를 작게하는 것이 안정적인 결과를 나타냈다.

지하공간하부 지하저류공동에서의 필라 보강효과에 관한 수치해석적 연구 (A numerical study of pillar reinforcing effect in underground cavern underneath existing structures)

  • 서형준;이강현;한신인;이인모
    • 한국터널지하공간학회 논문집
    • /
    • 제14권5호
    • /
    • pp.453-467
    • /
    • 2012
  • 공간이 한정된 도심지에서 인구가 밀집되는 가운데 도심의 복합지하공간에 대한 개발은 날로 늘어나고 있다. 이러한 가운데 홍수피해의 90% 이상이 도심지 홍수피해라고 할 만큼 도심지의 수재해에 대한 대비가 필요한 실정이다. 이러한 요구에 따라 도심지 복합지하공간 하부에 지하저류공동 시설물을 시공하여 도심지 홍수피해 시 복합지하공간에 대한 안정성을 확보하고자 한다. 지하저류공동에서 저장된 빗물을 원활히 제어하기 위해서는 한 개의 공동보다 다수의 저류공동 시설로 설계하는 것이 유리하다. 다수의 저류공동으로 시공을 할 경우 공동과 공동 사이의 필라 구조물에 상부의 하중이 집중되기 때문에 필라 구조물에서 안정성 확보 방안이 필수적이다. 따라서 본 연구에서는 필라부의 안정성을 확보하기 위한 필라부 보강공법을 개발하였다. 필라부 보강공법은 철근과 PC강연선으로 구성된 보강재를 필라부에 삽입한 후 가압 그라우팅을 하고, 프리스트레스를 가하는 공법이다. 따라서 기존의 프리케스트 콘트리트 구조물로 필라부를 보강하는 것과 달리 원지반을 직접 보강하는 공법으로 원지반의 강도를 최대한 활용할 수 있다는 장점이 있다. 먼저, 가압 그라우팅을 하였을 경우 지반 보강효과뿐만 아니라 필라부에 가해지는 상부의 하중을 경감시킬 수 있는 효과가 있다. 또한 프리스트레스를 가하게 되면 필라부에 내압을 가하는 효과로 인하여 지반강도를 증가시키는 역할을 기대할 수 있다. 본 논문에서는 이러한 보강효과를 통해서 필라부 주변지반의 거동이 어떻게 변화할 것인지를 판단하고자 한다. 먼저, 수치해석을 통해서 각 시공단계별 필라부 지반의 응력 변화 양상을 판단하였다. 이를 통해서 가압 그라우팅과 프리스트레스에 의한 효과를 검증할 수 있었다.

대형모형실험을 통한 수평 절리암반에서의 병설터널 이격거리 (Pillar Width of Twin Tunnels in Horizontal Jointed Rock Using Large Scale Model Tests)

  • 이용준;이상덕
    • 터널과지하공간
    • /
    • 제20권5호
    • /
    • pp.352-359
    • /
    • 2010
  • 병설터널에서 근접 굴착으로 인한 영향은 터널간 이격거리에 따라 달라진다. 본 논문에서는 수평절리암반에 형성된 병설터널의 이격거리에 따른 영향을 파악하기 위하여 콘크리트 블록으로 균일 수평 절리 모형 지반을 조성하고 이격거리를 변화시키면서 모형터널을 설치한 후에 대형 모형실험을 수행하였다. 병설터널의 이격거리(필라폭)는 터널 폭 D를 기준으로 0.29D, 0.59D, 0.88D, 1.18D로 변화시켰다. 실험중에 필라 응력, 터널변위, 지반 변위를 계측하였다. 측압계수는 1.0을 유지하였다. 실험결과, 터널 및 주변지반의 변위와 필라 응력은 필라 폭이 감소함에 따라 증가하였다. 각 계측항목에서 최대 변화폭이 발생하는 단계는 후행터널의 상반굴착 직후로 나타났다. 병설터널 굴착 시 가장 큰 영향을 받는 위치는 필라부와 맞닿아 있는 선행터널의 어깨부로 확인되었다. 이러한 결과는 병설터널의 안정성은 시공 시 천단변위보다 내공변위 관리를 통해 평가되어야 한다는 것을 보여준다. 또한, 병설터널의 영향권이 양호한 지반조건에 대한 경험이론의 근접시공 영향권(0.8D~2.0D)보다 근접한 0.59D~0.88D 범위에서 형성되었으며 이러한 영향범위 감소는 병설터널의 안정성에 수평절리의 영향이 있는 것으로 판단된다.

복층터널 분기 기하구조에 따른 안정성 검토에 관한 연구 (A study on the stability analysis for double deck tunnel branch geometry)

  • 박우정;장남주;김기환;최창림
    • 한국터널지하공간학회 논문집
    • /
    • 제20권2호
    • /
    • pp.393-404
    • /
    • 2018
  • 도심지 터널에서 지하도로는 지상도로와의 연결을 위한 램프터널을 계획하게 되고 본선터널과 램프터널이 접속되는 구간에서 대단면 터널과 분기구간이 생성된다. 본선터널과 램프터널이 접속하는 근접구간에서 응력집중으로 터널의 안정성에 심각한 문제를 초래할 수 있다. 따라서 필라부의 안정성을 확보하는 것은 터널의 안정성을 좌우하는 매우 중요한 요소라 할 수 있다. 본 연구에서는 복층터널을 대상으로 본선터널, 분기부대단면 터널 단면을 계획하고, 분기부 암반 필라의 거동을 2차원 수치해석 방법으로 검토하였다. 양호한 지반조건인 암반 III등급에서 램프터널이 본선터널에 접속하는 방법을 달리하여 필라폭에 따른 지반 안정성을 평가하였으며, 안전율 1.5 이상을 확보할 수 있는 터널 필라폭을 제안하였다.

입자 유동 해석(PFC)을 통한 근접터널의 거동에 관한 연구 (A Study on the Behavior of a Closely-spaced Tunnel by Using Particle Flow Code)

  • 서병욱;조선아;정선아;이석원
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2008년도 춘계 학술발표회 초청강연 및 논문집
    • /
    • pp.159-169
    • /
    • 2008
  • In general, it is considered that a pillar between closely-spaced tunnel is sensitive for stress concentration. Stability of a pillar is key factor for excavation of closely-spaced tunnel. In this paper, the study is focused on tracing the behaviors, displacement and plotting damages around tunnels that is modelled with Particle Flow Code, $PFC^{2D}$. Parametric study was performed with changing distance between center of tunnels and coefficient of earth pressure(K). Scaled-model tests were also carried out to validate a numerical analysis model. It was found that $PFC^{2D}$ could show dynamic visualized result in quite good agreement with the experimental test.

  • PDF

Numerical simulation of pressure relief in hard coal seam by water jet cutting

  • Song, Dazhao;Wang, Enyuan;Xu, Jiankun;Liu, Xiaofei;Shen, Rongxi;Xu, Wenquan
    • Geomechanics and Engineering
    • /
    • 제8권4호
    • /
    • pp.495-510
    • /
    • 2015
  • The applications of water jet cutting (WJC) in coal mine have progressed slowly. In this paper, we analyzed the possibility and reasonableness of WJC application to pressure relief in hard coal seam, simulated the distributive characteristics of stress and energy fields suffered by hard coal roadway wallrock and the internal relationships of the fields to the instability due to WJC (including horizontal radial slot and vertical annular slot) on roadway wallrock. The results showed that: (1) WJC can unload hard coal seam effectively by inducing stress release and energy dissipation in coal mass near its slots; its annular slots also can block or weaken stress and energy transfer in coal mass; (2) the two slots may cause "the beam structure" and "the small pillar skeleton", and "the layered energy reservoir structure", respectively, which lead to the increase in stress concentration and energy accumulation in coal element mass near the slots; (3) the reasonable design and optimization of slots' positions and their combination not only can significantly reduce the scope of stress concentration and energy accumulation, but also destroy coal mass structure on a larger scale to force stress to transfer deeper coal mass.

2-Arch 터널의 막장면 종방향 적정 이격거리에 관한 연구 (A study on the longitudinal optimum separated distance of tunnel face in 2-arch tunnel)

  • 이민규;정지수;이성기;이승호
    • 한국터널지하공간학회 논문집
    • /
    • 제9권4호
    • /
    • pp.323-330
    • /
    • 2007
  • 최근 선형분리 곤란, 환경훼손 최소화 및 용지보상 등의 이유로 2-Arch 터널의 채택이 점점 증가하고 있다. 이런 실정에도 불구하고 2-Arch 터널은 국내에서의 시공실적 및 설계사례의 부족으로 자료의 데이터화가 체계적이지 않고 2-Arch 터널의 역학적인 거동 메커니즘에 대한 연구가 미흡한 실정이다. 따라서 본 연구에서는 2-Arch 터널의 종방향 이격거리에 대한 연구를 통해 본선 선행터널과 중앙벽체의 거동 메커니즘을 분석하고 적정 이격거리를 제안하고자 한다. 2-Arch 터널의 이격거리 산정은 터널의 안정이 확보되는 조건에서 산정하는 것이 타당하며, 이격거리에 따라 보다 민감하게 작용하는 중앙 벽체의 거동에 영향을 최소화 할 수 있는 범위내에서 이격거리를 산정하는 것이 바람직할 것으로 판단된다. 또한 이격거리에 따른 중앙벽체의 민감도 분석결과 최대 변곡점이 생겨 급격한 응력변화가 발생하는 0.5D이내를 이격거리로 산정하는 것이 타당할 것으로 사료된다.

  • PDF

Optimization study on roof break direction of gob-side entry retaining by roof break and filling in thick-layer soft rock layer

  • Yang, Dang-Wei;Ma, Zhan-Guo;Qi, Fu-Zhou;Gong, Peng;Liu, Dao-Ping;Zhao, Guo-Zhen;Zhang, Ray Ruichong
    • Geomechanics and Engineering
    • /
    • 제13권2호
    • /
    • pp.195-215
    • /
    • 2017
  • This paper proposes gob-side entry retaining by roof break and filling in thick-layer soft rock conditions based on the thick-layer soft rock roof strata migration law and the demand for non-pillar gob-side entry retaining projects. The functional expressions of main roof subsidence are derived for three break roof direction conditions: lateral deflection toward the roadway, lateral deflection toward the gob and vertically to the roof. These are derived according to the load-bearing boundary conditions of the main roadway roof stratum. It is concluded that the break roof angle is an important factor influencing the stability of gob-side entry retaining surrounding rock. This paper studies the stress distribution characteristics and plastic damage scope of gob-side entry retaining integrated coal seams, as well as the roof strata migration law and the supporting stability of caving structure filled on the break roof layer at the break roof angles of $-5^{\circ}$, $0^{\circ}$, $5^{\circ}$, $10^{\circ}$ and $15^{\circ}$ are studied. The simulation results of numerical analysis indicate that, the stress concentration and plastic damage scope to the sides of gob-side entry retaining integrated coal at the break roof angle of $5^{\circ}$ are reduced and shearing stress concentration of the caving filling body has been eliminated. The disturbance of coal mining to the roadway roof and loss of carrying capacity are mitigated. Field tests have been carried out on air-return roadway 5203 with the break roof angle of $5^{\circ}$. The monitoring indicates that the break roof filling section and compaction section are located at 0-45 m and 45-75 m behind the working face, respectively. The section from 75-100 m tends to be stable.