• Title/Summary/Keyword: Steel Girder

Search Result 912, Processing Time 0.028 seconds

Seismic Response of Multiple Span Steel Bridges in the Central and Southeastern United States (미 중부 및 동남부 지역의 다경간 교량의 지진응답)

  • Choi, Eunsoo
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2003.04a
    • /
    • pp.427-439
    • /
    • 2003
  • A previous study evaluated the seismic response of typical multi-span simply supported (MSSS) and multi-span continuous (MSC) steel-girder bridges in the central and southeastern United States. The results showed that the bridges were vulnerable to damage resulting from impact between decks, and large ductility demands on nonductile columns. Furthermore, fixed and expansion bearings were likely to fail during strong ground motion. In this paper, several retrofit measures to improve the seismic performance of typical multi-span simply supported and multi-span continuous steel girder bridges are evaluated, including the use of elastomeric bearings, lead-rubber bearings, and restrainer cables. It is determined that lead-rubber bearings are the most effective retrofit measure for reducing the seismic vulnerability of typical bridges. While isolation provided by elastomeric bearings limits the forces into the columns, the added flexibility results in pounding between decks in the MSSS steel-girder bridge. Restrainer cables, which are becoming a common retrofit measure, are only moderately effective in reducing the seismic vulnerability of MSSS and MSC steel girder bridges.

  • PDF

A design approach of integral-abutment steel girder bridges for maintenance

  • Kim, WooSeok;Jeong, Yoseok;Lee, Jaeha
    • Steel and Composite Structures
    • /
    • v.26 no.2
    • /
    • pp.227-239
    • /
    • 2018
  • Integral abutment bridges (IABs) have no joint across the length of bridge and are therefore also known as jointless bridges. IABs have many advantages, such as structural integrity, efficiency, and stability. More importantly, IABs have proven to be have both low maintenance and construction costs. However, due to the restraints at both ends of the girder due to the absence of a gap (joint), special design considerations are required. For example, while replacing the deck slabs to extend the service life of the IAB, the buckling strength of the steel girder without a deck slab could be much smaller than the case with deck slab in place. With no deck slab, the addition of thermal expansion in the steel girders generates passive earth pressure from the abutment and if the applied axial force is greater than the buckling strength of the steel girders, buckling failure can occur. In this study, numerical simulations were performed to estimate the buckling strength of typical steel girders in IABs. The effects of girder length, the width of flange and thickness of flange, imperfection due to fabrication and construction errors on the buckling strengths of multiple and single girders in IABs are studied. The effect of girder spacing, span length ratio (for a three span girder) and self-weight effects on the buckling strength are also studied. For estimation of the reaction force of the abutment generated by the passive earth pressure of the soil, BA 42/96 (2003), PennDOT DM4 (2015) and the LTI proposed equations (2009) were used and the results obtained are compared with the buckling strength of the steel girders. Using the selected design equations and the results obtained from the numerical analysis, equations for preventing the buckling failure of steel girders during deck replacement for maintenance are presented.

An Experimental Study on the Stress Distribution in Steel Box Girder Bridge (강박스거더교의 응력분배 거동에 관한 실측연구)

  • Lee, Seong Haeng;Kim, Kyoung Nam;Son, Young Sang;Park, Tae Gyun;Jung, Kyoung Sup
    • Journal of Korean Society of Steel Construction
    • /
    • v.20 no.1
    • /
    • pp.9-20
    • /
    • 2008
  • It is important to increase the economy and efficiency of the diaphragm of the steel box girder bridge design. In this study, an experimental test is performed in a 4-span steel box girder bridge, which was under constructed according to the dead load of slab concrete and vehicle load. The test result is analyzed to verify the stress distribution of the diaphragm and the middle span. Next, stresses on the vertical stiffener are analyzed according to height. Stresses on the diaphragm with equal height are arranged respectively. Also, the stress distribution of the diaphragm and the middle span. Next, stress on the vertical stiffeners are analyzed according to height. Stresses on the diaphragm with equal height are arranged respectively. Also, the vertical stiffeners in the diaphragm was studied, and using the analyzed results, the proper length of the ratio of vehicle load with curing concrete to vehicle load with asphalt is calculated in each part of the steel box girder bridge. The results provide data that serve as basis for an economical and efficient design for the steel box girder bridge diaphragm.

Development of a Prestressed Plate Girder Forming Hybrid Sections of Hot-rolled H Beam and High-Strength Steel Plates (H형강과 고강도 강판으로 복합단면을 구성하는 프리스트레스트 플레이트거더의 개발)

  • Kyung, Yong Soo;Ahn, Byung Kuk;Bang, Jin Hwan;Kim, Moon Young
    • Journal of Korean Society of Steel Construction
    • /
    • v.17 no.5 s.78
    • /
    • pp.637-648
    • /
    • 2005
  • Innovative prestressed steel plate girders were presented in this study. Hot-rolled H beams were loaded first, then relatively high-strengthsteel plates were welded on the top and bottom flanges of preloaded H beams. Finally, high prestressed plate (HiPP) girder was manufactured by simply releasing prestresses of rolled beams. To verify prestress distributions induced in this girder, the experimental study was conducted and some guidelines to manufacture these girders effectively were addressed. In addition, methods to determine the allowable bending stress of HiPP girders and to check welding stresses were addressed for design of temporary bridges. The efficiency and effectiveness of the present girder were demonstrated through design examples of temporary bridges adapting the prestress-induced girder or the plate girder of the same section without prestresses. As a result, it has been found to be possible that the span length of HiPP girders for temporary bridges is longer than that of girders without prestresses.

Stiffened Effect of Knee Brace of Cross-Beam in Steel Box-girder Bridges (강박스거더교 가로보 니브레이스(Knee Brace)의 보강효과)

  • Gil, Heung Bae;Jang, Gab Chul;Kang, Sang Gyu;Lee, Il Keun
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.29 no.3A
    • /
    • pp.227-234
    • /
    • 2009
  • Recently, a knee brace is usually installed in connection between cross-beam and main-girder of steel box-girder bridges. The knee brace is installed as a structural stiffener and mainly aims to relieve stress at joints and to prevent main-girder from lateral deformation. However, research on the knee brace is insufficient to obviously evaluate the necessity. The stiffened effect of knee brace is determined by using finite element analyses. Stress distribution, stress level of members and deflection of the cross-beam are evaluated by parametric FE analysis for the installation of knee brace and the depth ratio of cross-beam/steel box girder. It is seen from comparison of numerical analysis results that the knee brace installed in cross-beam of steel boxgirders bridges is not efficient as a structural stiffener with respect to stress relief and stiffened effect.

A Study on the Comparison of Performance of PC-Slab Composite Plate Girder from the Actual Sized Experiment (실물실험을 통한 PC-Slab합성 판형교의 성능비교연구)

  • Min, Kyung-Ju;Lee, Sung-Uk;Kim, Yung-Guk;Woo, Yong-Keun
    • Proceedings of the KSR Conference
    • /
    • 2010.06a
    • /
    • pp.1300-1309
    • /
    • 2010
  • In the railway bridges, steel plate girder types are preferred due the high stability. Nevertheless, it has been pointed out that this type of bridge has problems such as, structural damages in the rail and girder seat, noise problem due to impact at the rail joint and excessive vibration. This vibration and/or deflection are mainly because insufficient stiffness of steel plate type of bridge. To resolve these problems, PC-Slab composite plate girder type which has simple process and economic cost, is proposed in this study. The static and dynamic experiment is performed by using the production of actual sized PC-Slab and abandoned steel plate girder. The object of this experiment is to verify the fact that girder stiffness increase and structural safety. The result of the experiment is used to analyze the effect of performance improvement of PC composite plate girder type. Using this method, economic rail maintainers, girder stiffness increase, and also speed/ride improvement even for existing rail could be expected by dynamic performance improvement. Additionally noise due to impact, deflection and vibration caused from long rails can be reduced.

  • PDF

Behavior of Main Girder in Continuous Girder System using Cross Girder Method (가로거더공법에서 주형의 연속화 시점에 따른 주형의 거동)

  • Park, Jeong-Ung;Seo, Won-Ju;Lee, Son-Ho
    • 한국방재학회:학술대회논문집
    • /
    • 2008.02a
    • /
    • pp.533-536
    • /
    • 2008
  • It is on increasing trend to employ H-rolled beams as main flexural members of bridges and of temporary structures owing to their handiness for construction, maintenance, and management. But in the case of applying H-rolled beams to bridges, maximum length of bridge span is around 20m. Therefore, to develop simplified steel-concrete composite bridge having long span using H-rolled beam needs new cross girder system at internal supports, optimization of bridge system without cross beams between supports and steel-concrete composite bridge deck. This study performs mechanical analysis of cross girder system for H-rolled beam steel-concrete composite bridge with long span and verifies its usefulness.

  • PDF

Application of Narrow Steel Box Girder Bridge of Light Rail Transit with HR Plate (HR Plate의 경량전철 협폭박스거더교 적용)

  • Park, Dae-Su;Hwang, Nak-Yuen;Jung, Kyoung-Sup;Lee, Seong-Haeng
    • Proceedings of the KSR Conference
    • /
    • 2006.11b
    • /
    • pp.365-375
    • /
    • 2006
  • The HR Plates made hot rolled coils is lower than general structural steel plates in price. No difference between general steel plates and HR Plates with thickness up to 22mm are found in most characters such as cutting operation, fabrication and even welding. It can be concluded that HR Plates with thickness up to 22mm can be applied to flanges and webs of any girders as well as longitudinal ribs, longitudinal and vertical stiffeners of steel bridges appropriately. To increase the demand of HR Plates with thickness up to 22mm, it is necessary that HR Plates is applicable to full member in steel bridge including main girder.In this study, availabilities of the narrow steel box girder of light railway transit with HR Plate width as a main member are discussed. For application of HR Plate to steel bridge with 50m span or more, new support systems in three types are presented. Computational analysis is performed in 15 bridge models of light railway transit with beam element and plate element. As a analysis results, three models in light railway transit are presented. We finally come to the conclusion that HR Plates can be apply to narrow steel box girder in the light railway transit.

  • PDF

Performance Improvement on Plate Girder Bridges Through Continuous Welded Rail (판형교 장대화에 따른 성능 개선)

  • Min, Kyung-Joo;Bahn, Gul-Yong;Ryu, Yeon-Jong
    • Proceedings of the KSR Conference
    • /
    • 2007.05a
    • /
    • pp.1439-1449
    • /
    • 2007
  • The challenging aspect of CWR (continuous welded rail) is the additional axial forces in rails, mainly due to the thermal expansion of steel plate girder and rail itself. It has been found that these axial forces are proportional to girder length, total bridge length and bolt tightening forces. Also these forces are dependent to girder support conditions, types of bearings and their arrangements. With CWR, the authors' previous studies show that performance improvements like noise reduce, fatigue resistances and bearing durability increment can be expected. In addition to these effects, secondary effects due to the semi integral behavior between rail and bridge girder also can be expected. Special bearings which can reduce the absolute maximum axial forces have been developed, and applied to real 100m span bridge. The performance improvements were verified through site measurements and numerical analysis. The purpose of this study is to confirm the expected performance improvement aspects of steel plate girder bridges with CWR. To verify these aspects, girder stiffness changes, rail axial force changes, girder displacements and noise level were thoroughly measured and compared.

  • PDF

Precise Measurement of the Steel Box Girder Using Industrial Photogrammetry Method (산업사진측량 기법에 의한 교랑 강박스거더 정밀측정)

  • Jung Sung Heuk;Lee Jae Kee
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.23 no.1
    • /
    • pp.69-76
    • /
    • 2005
  • The purpose of this study was to establish the accuracy of the industrial photogrammetry system constructed with INCA2 metric camera and V-STARS system on steel box girder measurement under industrial measurement condition. The objective of the measurement was to determine the distances of plane to plane or plane to libs, precise positions of the bolt holes and angles of the plane to plane on the steel box girder using coded targets, tape targets, edge targets and target adapters. The measurement undertaken has shown that industrial photogrammetry method were a very accurate and more importantly were produced quickly to measure the steel box girder.