• Title/Summary/Keyword: Steam Power Plant

Search Result 735, Processing Time 0.026 seconds

Development and Actual Application of Governor Program to Nuclear Steam Turbine (원자력 증기터빈 조속기 프로그램 개발 및 실증 적용)

  • Choi, In-Kyu;Kim, Jong-An;Park, Doo-Yong;Woo, Joo-Hee
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.24 no.4
    • /
    • pp.116-122
    • /
    • 2010
  • This paper describes the up-grade of the turbine governor for steam turbine due to its poor operation from long time use. The analog type governor of the unit 1 in Kori nuclear power plant in Korea was removed and the new digital type turbine governor was developed and installed. The procedure for the actual application, site adaptability test using dynamic simulator and the result of actual operation are described here. And the program for nuclear steam turbine is suggested here.

Cause Analysis of Level Measurement Error in Steam Generator of Nuclear Power Plant (원자력발전소의 증기발생기 수위계측 오차 원인분석)

  • Lee, Kwang-Dae;Oh, Eung-Se;Yang, Seung-Ok
    • Proceedings of the KIEE Conference
    • /
    • 2006.10c
    • /
    • pp.591-593
    • /
    • 2006
  • The differential pressure method has been used in the level measurement of steam generator in nuclear power plant. Two sensing lines from a steam generator to a pressure transmitter are needed to measure the high pressure and low pressure. The fluid conditions in the sensing line require the uniform phase with no bubbles and the slope of sensing line should be installed with forward slope. The expansion of the bubble volume according to the upper pressure and the reverse slope of sensing lines explain how the level errors took place.

  • PDF

A Study on Extraction of the Center Point of Steam Generator Tubes of YoungKwang Nuclear Power Plant

  • Cho, Jai-Wan;Kim, Chang-Hoi;Seo, Yong-Chil;Park, Young-Soo;Kim, Seung-Ho
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 2002.10a
    • /
    • pp.96.5-96
    • /
    • 2002
  • This paper describes extraction procedures for the center coordinates of steam generator tubes of Youngkwang nuclear power plant No. 6 unit. The centering coordinates of tubes are needed for monitoring whether ECT probe is exactly inserted into tube or not. However, The tube image tends to have poor contrast because steam generator bowl is sealed. The centering coordinates extraction procedure consists of two steps. The first step is to process the region with high contrast in entire image of steam generator tubes. Using the center points extracted in the first step and the geometry of tubes lined up in regular triangle patterns the centering coordinates of the rest region with low contrast...

  • PDF

Open Die Forging of Steel Forgings for the Large Pressure Vessel (대형 압력용기 단강품의 자유단조)

  • 김동권;김재철;김영득;김동영
    • Proceedings of the Korean Society of Precision Engineering Conference
    • /
    • 2003.06a
    • /
    • pp.756-759
    • /
    • 2003
  • Steam Generator is one of the most important structural part of nuclear power plant. It is manufactured by welding process of various steel forgings such as shell, head, torus and tube sheet. These steel forgings have been made by open die forging process. After steel melting and ingot making, open die forging has been carried out to get a good quality which means high soundness and homogeniety of the steel forgings by using high capacity hydraulic press. This paper introduced open die forging status and investigated forging method of the ultra large steel forgings which is used for the steam generator of 1000MW nuclear power plant. For the same thing. the type of steel forgings consisting steam generator is classified by shell, head, torus and tube sheet. And corresponding forging processes of the steel forgings have been investigated.

  • PDF

Examination of the Intermittent High Vibration by the Accumulated Carbide at Oil Deflector of a Steam Turbine for Power Plant (발전용 증기터빈의 Oil Deflector부 탄화물 퇴적에 의한 간헐적 고진동 현상 규명)

  • 양승헌;박철현;김재실;하현천
    • Proceedings of the Korean Society for Noise and Vibration Engineering Conference
    • /
    • 2002.05a
    • /
    • pp.190-195
    • /
    • 2002
  • The intermittent high vibration has been occurred one or two times a day for a 500MW large steam turbine during 5 months. This abnormal vibration was caused by the rubbing between the rotor and the carbide accumulated on the seal tooth of oil deflector. It was found that the accumulated carbide was insulation material installed on the HIP casing from the examination of the chemical composition. Also, this paper presents the mechanism of the intermittent high vibration and the proper method to eliminate this vibration problem. This result would be good practice to find the solution of similar high vibration in the steam turbines for power plant as well as industrial rotating machineries.

  • PDF

Optimum Design of a Heat Recovery Steam generator(I) (열회수 증기발생기의 최적설계에 대한 연구(I))

  • 신지영
    • Journal of Advanced Marine Engineering and Technology
    • /
    • v.23 no.5
    • /
    • pp.670-678
    • /
    • 1999
  • Heat recovery steam generator(HRSG) is a principal component of the combined cycle power plant (CCPP) which utilizes the waste energy of the gas turbine exhaust gas. A design of the HRSG is a keypoint to achieve high cycle efficiency with competitive cost. This paper presents a brief review on the design of a HRSG which covers the basic design parameters and their effects on the performance and the investment cost. Finally the concept of the optimum design point is presented according to the selection of a pinch point temperature difference and a steam pressure as an illustrated case.

  • PDF

Methods and Systems for High-temperature Strain Measurement of the Main Steam Pipe of a Boiler of a Power Plant While in Service

  • Guang, Chen;Qibo, Feng;Keqin, Ding
    • Journal of the Optical Society of Korea
    • /
    • v.20 no.6
    • /
    • pp.770-777
    • /
    • 2016
  • It has been a challenge for researchers to accurately measure high temperature creep strain online without damaging the mechanical properties of the pipe surface. To this end, a noncontact method for measuring high temperature strain of a main steam pipe based on digital image correlation was proposed, and a system for monitoring of high temperature strain was designed and developed. Wavelet thresholding was used for denoising measurement data. The sub-pixel displacement search algorithm with curved surface fitting was improved to increase measurement accuracy. A field test was carried out to investigate the designed monitoring system of high temperature strain. The measuring error was less than $0.4ppm/^{\circ}C$, which meets actual measurement requirements for engineering. Our findings provide a new way to monitor creep damage of the main steam pipe of a boiler of an ultra-supercritical power plant in service.

Examination of the Periodic High Vibration by the Accumulated Carbide at Oil Deflector of a Steam Turbine for Power Plant (발전용 증기터빈의 Oil Deflector부 탄화물 퇴적에 의한 주기적 고진동 현상 규명)

  • 양승헌;박철현;김재실;하현천
    • Transactions of the Korean Society for Noise and Vibration Engineering
    • /
    • v.12 no.11
    • /
    • pp.897-903
    • /
    • 2002
  • The periodic high vibration has been occurred one or two times a day for a 500 MW large steam turbine during 5 months. This abnormal vibration was caused by the rubbing between the rotor and the carbide accumulated on the seal tooth of oil deflector. It was found that the accumulated carbide was insulation material installed on the HIP casing from the examination of the chemical composition. Also, this paper presents the mechanism of the periodic high vibration and the proper method to eliminate this vibration problem. This result would be good practice to find the solution of similar high vibration in the steam turbines for power plant as well as industrial rotating machineries.

Molar Ratio Control Scheme Based on Hideout Return Test for Ulchin Nuclear Power Plant Unit 3 (울진 3호기 잠복방출시험을 이용한 몰비 조절방안)

  • Kim, Y. H.;Y. N. Suh;Lee, S. S.;Kim, E. K.;Y. J. Pi
    • Proceedings of the Korea Society for Energy Engineering kosee Conference
    • /
    • 1999.11a
    • /
    • pp.125-130
    • /
    • 1999
  • Corrosion of steam generator tubes is the major issue affecting selection of secondary water chemistry parameters. The objective of secondary side water chemistry control is to minimize corrosion damage and to thereby maximize the reliability and economic performance of the secondary system. To achieve this objective, the water chemistry has to be compatible with all parts of the system including steam generators.(Omitted)

  • PDF