• Title/Summary/Keyword: Start-up Assistance Project

Search Result 3, Processing Time 0.042 seconds

An Impact of Startup Business Performance by Entrepreneurs' Perceived Importance, Satisfaction, and Level of Meeting to Expectation over Government Startup Business Aid Programs (창업가가 인식한 정부창업지원사업 중요도와 만족도 및 기대충족도가 창업기업의 경영성과에 미치는 영향)

  • Lee, Young Ju;Yang, Youngseok
    • Asia-Pacific Journal of Business Venturing and Entrepreneurship
    • /
    • v.13 no.1
    • /
    • pp.31-41
    • /
    • 2018
  • The purpose of this study is to look at the difference between the importance and the satisfaction with respect to government startup aid programs perceived by entrepreneurs to improve the effectiveness of government startup aid policy and verify the causal relationship between startup aid project and business performance. In this respect, this study aims to look at the impact of entrepreneurs' perceived satisfaction over government startup aid programs on startup business performance. Major study findings from this study are as follows. First, as a result of testing statistical significance of the difference between importance and satisfaction in startup education, facility/space, consulting, or fund support field, respectively in start-up assistance project, it appeared that there was a significant difference in all fields. In addition, fund support was the field that showed the biggest difference between importance and satisfaction. Second, the results of IPA (importance-performance analysis), which displays relative importance and performance of start-up assistance project on four quadrants so that entrepreneurs can evaluate which start-up assistance projects they think important and which projects they are satisfied with by themselves are as follows. Let us summarize the distribution of start-up assistance project on four quadrants in the first place. Facility/space support project is distributed in the 1st quadrant that requires ongoing maintenance; start-up funding program in the 2nd quadrant that requires concentrated improvement; consulting support project in the 3rd quadrant that requires limited use at low priority; and start-up education support project in the boundary between the 3rd quadrant that requires limited use and the 4th quadrant that requires rejection against unnecessary items. Third, the results from multiple regression analysis to identify the impact of satisfaction with government startup aid programs over business performance are as follows. As a result of analyzing the influence relationship between government startup aid program and financial performance, it appeared that satisfaction with facility/space had a positive (+) impact on financial performance. This suggests that the higher the satisfaction with facility/space, the higher the financial performance. As a result of analyzing the influence relationship between start-up assistance project and non-financial performance, it appeared that satisfaction with startup education had a positive (+) impact on non-financial performance. This suggests that the higher the satisfaction with startup education, the higher the non-financial performance.

A Study on the Global Start-ups/Employment Support Model Using ODA Projects (ODA 프로젝트를 활용한 글로벌 창업/취업 지원 모델)

  • JUNG, Moosup;JUNG, Jin-Sup
    • The Journal of Industrial Distribution & Business
    • /
    • v.10 no.10
    • /
    • pp.67-79
    • /
    • 2019
  • Purpose - The purpose of this study was to explore the model that supports the recipient country by using the ODA (Official Development Assistance) project and at the same time fits the global start-up/employment support of donor country with CSV business model. Specifically, we wanted to examine the feasibility of the project based on the existing ODA projects. Research design, data, and methodology - As the methodology, case studies and interview were conducted as well as literature studies. The case analysis is based on a press release of the entire KOICA's ODA project, which has been implemented for one year, based on 2017. After consideration, the actual results and future feasibility were analyzed. The interviews were conducted on senior Korean officials and Indian officials involved in Vietnam's ODA project. Results - As a result, some of the project cases applied and analyzed according to the model of this study were judged to be highly potential. Based on the results of this analysis, as the model derived from this study pursues, the global business model is developed under the CSV (Creating Shared Value) strategy through ODA projects to support recipient countries and global start-up/employment support of donor country. The possibility of simultaneously pursuing this model based on CSV business model was also confirmed. Conclusions - In the past, free aid agencies like KOICA focused solely on supporting recipient countries, but in terms of sustainability, they could discover the potential of supporting the global start-up/employment of the donor country using CSV business model in ODA project. In this study, we tried to find the theoretical background and potential possibilities in some ODA projects based on CSV business model. As a result of the analysis of KOICA ODA projects in 2017 and interviews, some ODA projects could be used to improve the economic development of the recipient country as well as the global start-up/employment of the donor country. Therefore, it is necessary for the ministries of the government to promote ODA projects to understand the framework that achieves these two objectives simultaneously and to promote ODA projects based on various strategic considerations.

Introduction to CM Experience from Incheon International Airport (IIA) Construction Project (인천국제공항건설 사업관리 경험)

  • Park, Dae-Won
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.20-25
    • /
    • 2004
  • On July $18^{th}$, 2003, Incheon International Airport Corporation(lIAC) signed the Construction Management Service Contract with KIDS consortium (composed of Kun-Won Eng., ITM Corp, Do-Hwa Eng, Space Croup) for the $2^{nd}$ phase construction protect consists of landfill, $\#3$ runway, remote Concourse, IAT, BHS, cargo terminal, etc scheduled to be finished by the end of 2008. KIDS dispatched qualified engineers to the Construction Management Division of IIAC for providing technical assistance to IIAC members to pursue project goals in tulle. within budget with appropriate quality level to build one of leading hul] airports for the Northeast Asia legion in the $21^{st}$ century. The work scope covers upgrading various project procedures and related computer programs, cost and schedule control, design supervision for building design including support systerns such as HVAC, fire protection, elevators and escalators, boarding bridges, electrical and communication systems, and technical support for IAT/BHS, QA/QC, field test and inspection, start-up and commissioning, etc. The purpose of this paper is to introduce the major activities of the Construction Management Services performing at the IIA project for your reference.

  • PDF