• Title/Summary/Keyword: Standing column well type

Search Result 15, Processing Time 0.029 seconds

Research of geothermal analysis and experimental test for Standing Column Well type system (우물관정(SCW: Standing Column Well)형 냉난방 시스템의 지중열 해석과 실증 실험에 관한 연구)

  • Kwon, Iksang;Hong, Gibae
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 2010.06a
    • /
    • pp.173-173
    • /
    • 2010
  • This thesis identified basic design elements (Sustainable Yield, Temperature of Groundwater, Depth of Well, Separation Distance between wells) regarding installation of Standing Column Well, Geothermal Heat pump System by dynamic analysis.

  • PDF

Research for geothermal analysis on design of Standing Column Well type system (우물관정(SCW: Standing Column Well)형 지열 냉난방 시스템 설계를 위한 지중열 해석에 관한 연구)

  • Kwon, Ik-Sang;Rhee, Kwon-Joong;Kim, Tae-Won
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 2009.11a
    • /
    • pp.576-580
    • /
    • 2009
  • This thesis identified basic design elements(Sustained Yield, Depth of Well, Separation Distance between wells) regarding installation of Standing Column Well, Geothermal Heat pump System by dynamic analysis.

  • PDF

Research on the heating performance of SCW heat pump system for residential house (주거용 건물의 지하수 이용 지열 히트펌프 시스템의 난방성능 특성에 관한 연구)

  • Kim, Ju-Hwa;Kim, Ju-Young;Hong, Won-Hwa;Ahn, Chang-Hwan
    • Proceeding of Spring/Autumn Annual Conference of KHA
    • /
    • 2008.04a
    • /
    • pp.431-435
    • /
    • 2008
  • Geothermal heat pump system using standing column wells as their ground heat exchanger can be used as a highly efficient source of heating and cooling in massive buildings. But there is no case of a small scale residential house. So this study estimated heating coefficient of performance(COP) of geothermal heat pump system using standing column well type which is excellent in heat recovery in the residential house. As a result of analysis, The COP of heat pump is over average 6 and is excellent. And in consequence of making a comparative study according to the bleeding, the cop is higher in the case of bleeding. Therefore, bleeding affects the performance of the system. This study has shown performance result that stands on actual data. Therefore, this study provides ground data that needs when a low capacity of system designs for a residence with confidence elevation.

  • PDF

An Experimental Study on the Thermal Performance Measurement of Standing Column Well type Borehole Heat Exchanger (스탠딩컬럼웰형(SCW) 지중열교환기의 열성능 측정에 관한 실험적 연구)

  • Lee, Sanghoon;Choe, Yongseok;An, Kunmuk
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 2010.11a
    • /
    • pp.122.2-122.2
    • /
    • 2010
  • Knowledge of ground thermal properties is most important for the proper design of BHE(borehole heat exchanger) systems. The configure type, pipe size and thermal performance of the BHE is highly dependent on the ground source heatpump system-efficiency and instruction cost. Thermal response tests with mobile measurement devices were developed primarily for in-situ determination of design data for Standing Column Well apply. The main purpose has been to determine in-situ values of effective ground thermal conductivity and thermal resistance, including the effect of ground-water flow and natural convection in the boreholes. The test rig is set up on a some trailer, and contains a sub-circulation pump, a boiler, temperature sensors, flow meter and a data logger for recording the temperature and circulation fluid flow data. A constant heating power is injected into the SCW through the test rig and the resulting temperature change in the SCW is recorded. The recorded temperature data are analysed with a line-source model, which gives the effective in-situ values of rock thermal conductivity and thermal resistance of SCW.

  • PDF

Numerical Simulation of Standing Column Well Ground Heat Pump System Part II: Parametric Study for Evaluation of the Performance of Standing Column Well (단일심정 지열히트펌프의 수치적 모델링 Part II: 단일심정 지열히트펌프의 성능평가를 위한 매개변수 연구)

  • Park, Du-Hee;Kim, Kwang-Kyun;Kwak, Dong-Yeop;Chang, Jae-Hoon;Na, Sang-Min
    • Journal of the Korean Geotechnical Society
    • /
    • v.26 no.2
    • /
    • pp.45-54
    • /
    • 2010
  • The SCW numerical model described in the companion paper was used to carry out a comprehensive parametric study to evaluate the performance of the SCW. The five ground related parameters, which are porosity, hydraulic conductivity, thermal conductivity, specific heat, geothermal gradient, and five SCW design parameters, which are pumping rate, well depth, well diameter, dip tube diameter, bleeding rate, were used in the study. Two types of numerical simulations were performed. The first type was used to perform short-term (24-hour) simulation, while the second type 14 day simulation. The study results indicate that the parameters that have important influence on the performance of SCW were hydraulic conductivity, thermal conductivity, geothermal gradient, pumping rate, and bleeding rate. The thermal conductivity had the most important influence on the performance of the SCW. With the increase in the geothermal gradient, the performance increased in the heat mode, but decreased in the cooling mode. The hydraulic conductivity influenced the performance when the value was larger than $10^{-4}m/s$. The depth of the well increased the performance, but at the cost of increased cost of boring. The bleeding had an important influence on SCW, greatly enhancing the performance at a limited increased cost of operation. Overall, this study showed that various factors had a cumulative influence on the performance of the SCW, and a numerical simulation can be used to accurately predict the performance of the SCW.

Numerical Simulations for Optimal Utilization of Geothermal Energy under Groundwater-bearing Conditions (지하수 부존지역에서 최적 지열에너지 활용방식 수치 모의)

  • Kim, Jin-Sung;Cha, Jang-Hwan;Song, Sung-Ho;Jeong, Gyo-Cheol
    • The Journal of Engineering Geology
    • /
    • v.24 no.4
    • /
    • pp.487-499
    • /
    • 2014
  • While the vertical open type of heat exchanger is more effective in areas of abundant groundwater, and is becoming more widely used, the heat exchanger most commonly used in geothermal heating and cooling systems in Korea is the vertical closed loop type. In this study, we performed numerical simulations of the optimal utilization of geothermal energy based on the hydrogeological and thermal properties to evaluate the efficiency of the vertical open type in areas of abundant groundwater supply. The first simulation indicated that the vertical open type using groundwater directly is more efficient than the vertical closed loop type in areas of abundant groundwater. Furthermore, a doublet system with separated injection and extraction wells was more efficient because the temperature difference (${\Delta}$) between the injection and extraction water generated by heat exchange with the ground is large. In the second simulation, we performed additional numerical simulations of the optimal utilization of geothermal energy that incorporated heat transfer, distance, flow rate, and groundwater hydraulic gradient targeting a single well, SCW (standing column well), and doublet. We present a flow diagram that can be used to select the optimal type of heat exchanger based on these simulation results. The results of this study indicate that it is necessary to examine the adequacy of the geothermal energy utilization system based on the hydrogeological and thermal properties of the area concerned, and also on a review of the COP (coefficient of performance) of the geothermal heating and cooling system.

A Study on Specific of Ground Water Temperature Changes of the Small Scaled SCW GWHP System in Case of Heating (소규모 SCW 지중열 시스템의 난방시 지하수 온도 변화 특성에 관한 연구)

  • Yang, Seung-Jin;Lee, Won-Ho;Kim, Ju-Young;Hong, Won-Hwa;Ahn, Chang-whan
    • Proceedings of the SAREK Conference
    • /
    • 2008.06a
    • /
    • pp.1347-1352
    • /
    • 2008
  • The SCW ground heat pump system releases ground energy from the ground water of ground heat exchanger. In other word, ground water is used to heating through releases ground energy which oneself has. But the thermal efficiency of system is going to down because repetitive process of ground water will lost ground energy in standing column well system and if heating load is continually increase, energy of ground water may be frozen or there are no benefits to use ground energy as it owes just little energy. To solve these problems, there are need to exchange water to the ground heat exchanger then the way will be used to maintain Efficiency continually as the way of to be supplied with fresh ground water into ground heat exchanger. However, this type causes waste of ground water. Therefore it is essential to discharge water to outside timely on a heat exchanger. Therefor through a study, find out the best time to discharge water to outside and exchange water to ground heat exchanger, and propose to the DB of design of the ground heat exchanger.

  • PDF

Study on the Performance Evaluation of Smart Heating and Cooling Heat Pump System in a Balancing Well Cross-Conditioned Ground Heat Exchanger (Balancing Well 교차혼합 지중열교환기의 스마트 냉난방 히트펌프 시스템의 성능평가에 관한 연구)

  • Lee, Changhee;Kim, Donggyu;Yu, Byeoungseok;Kim, Booil
    • New & Renewable Energy
    • /
    • v.16 no.4
    • /
    • pp.41-48
    • /
    • 2020
  • This study performed a single hole operation method using a balancing well-cross-mixed underground heat exchanger, and conducted thermal performance studies of an SCW-type underground heat exchanger using a two-well. The study attempted to change the existing operating method of the two adjacent SCW underground heat exchangers with one ball each. The SCW-type geothermal heat exchanger is considered to enable up to 20% of bleed discharge at maximum load, which makes groundwater usage unequal. The efficiency factor of the geothermal system was improved by constructing the discharged water by cross-mixing two balancing wells to prevent the discharge of groundwater sources and keep the temperature of the underground heat exchanger constant. As a result of the cooling and heating operation with the existing SCW heat exchange system and the balancing well-cross-mixed heat exchange system, the measured performance coefficient improved by 23% and 12% in cooling and heating operations, respectively. In addition, when operating with a balanced cross-mixing heat exchange system, it has been confirmed that the initial basement temperature is constant with a standard deviation of 0.08 to 0.12℃.

Operation Characteristics of Open Type Geothermal Heat Pump (개방형 지열 히트펌프 시스템의 운전 특성)

  • Lim, Hyo-Jae;Kong, Hyoung-Jin;Song, Yoon-Seok;Park, Seong-Koo
    • Proceedings of the SAREK Conference
    • /
    • 2006.06a
    • /
    • pp.701-706
    • /
    • 2006
  • Groundwater heat pump systems are the oldest of the ground-souce systems and it has various type. Standing column well type are must be located in hard rock geology site and produce sufficient water for the conventional open loop system. These system are indirect type(the building circulating loop and ground water are intercept). Existence of the exchanger the foundation protect water quality to use of open loop. The design of open loop system are concern on the power requirements. An experimental study was analysis the extremely heating operation COP of ground water heat pump system. Operation efficiency of the 50RT systems shows that, COP $2.9{\sim}5.0$ in heating operation. And generally it shows 3.4.

  • PDF

A Study on the Determining Initial Ignoring Time for the Analysis of Ground Thermal Conductivity of SCW Type Ground Heat Exchanger (SCW형 지중 열교환기의 지중 열전도도 해석에서 초기제외시간 결정에 관한 연구)

  • Chang, Keun-Sun;Kim, Min-Jun;Kim, Young-Jae
    • Korean Journal of Air-Conditioning and Refrigeration Engineering
    • /
    • v.26 no.10
    • /
    • pp.453-459
    • /
    • 2014
  • This paper presents an analysis on the initial ignoring time of SCW type GHX using Mean Square Error method. Line source method is a useful method for estimating the ground thermal conductivity for the vertical type and SCW type GHX in Korea. The line source method for ground thermal conductivity of geothermal in-site test is the basis of linear approximation between the temperature of a borehole and logarithmic time in a GHX. To apply the line source method to the estimation of SCW type GHX, it is necessary to ignore the initial time of data at the stage of a linear approximation. This paper proposed a new initial ignoring time of SCW type GHX among various initial ignoring time at the time for reaching MSE of $0.02^{\circ}C^2$.