• 제목/요약/키워드: Standby system

검색결과 213건 처리시간 0.031초

와이블 분포를 이용한 다기능 다중상태 대기시스템의 신뢰도 분석 (Reliability Analysis of Multi-functional Multi-state Standby System Using Weibull Distribution)

  • 김지혜;정영배
    • 산업경영시스템학회지
    • /
    • 제40권3호
    • /
    • pp.138-147
    • /
    • 2017
  • As the functions and structure of the system are complicated and elaborated, various types of structures are emerging to increase reliability in order to cope with a system requiring higher reliability. Among these, standby systems with standby components for each major component are mainly used in aircraft or power plants requiring high reliability. In this study, we consider a standby system with a multi-functional standby component in which one standby component simultaneously performs the functions of several major components. The structure of a parallel system with multifunctional standby components can also be seen in real aircraft hydraulic pump systems and is very efficient in terms of weight, space, and cost as compared to a basic standby system. All components of the system have complete operation, complete failure, only two states, and the system has multiple states depending on the state of the component. At this time, the multi-functional standby component is assumed to be in a non-operating standby state (Cold Standby) when the main component fails. In addition, the failure rate of each part follows the Weibull distribution which can be expressed as increasing type, constant type, and decreasing type according to the shape parameter. If the Weibull distribution is used, it can be applied to various environments in a realistic manner compared to the exponential distribution that can be reflected only when the failure rate is constant. In this paper, Markov chain analysis method is applied to evaluate the reliability of multi-functional multi-state standby system. In order to verify the validity of the reliability, a graph was generated by applying arbitrary shape parameters and scale parameter values through Excel. In order to analyze the effect of multi-functional multi-state standby system using Weibull distribution, we compared the reliability based on the most basic parallel system and the standby system.

Warm standby 고장김내 구조를 지원하는 교환 제어 시스템에서의 가동률 분석 (An availability analysis of switching control system with warm standby fault tolerant architecture)

  • 송광석;여환근;한창호;문태수;이광배;김현욱;윤충화
    • 한국통신학회논문지
    • /
    • 제21권8호
    • /
    • pp.1989-2002
    • /
    • 1996
  • In this paper, we describe several warm standby fault-tolerant models and their operation methods applicable to telephone switching control systems which have dual module structure and need high availability. Unavailabilities of the system implemented by four different methods for each model are computed by using the Markov state model, and then are compared for system performance evaluation. As the results ofsimulations, the warm standby model with triple processors is best in the aspect of data loss, while in most cases the warm standby model with doble processors based on no standby check method provides the highest system avaiability. Periodic changeover increases the system unavailability, but the preriodic standby check on standby module decreases the system unavailability of warm standby model with a single processor and with double processors. On the other hands, the variationas of warm standby model with a single processor and with double processors. On the other hand, the variations of data recovery time and personnel recovery rate have little effect on the system unavailtability.

  • PDF

Hot Standby 고장 감내 구조를 지원하는 교환 제어시스템의 가동률 분석 (An Availability Analysis Of Switching Control System with Hot Standby Fault Tolerant Architecture)

  • 송광석;여환근;한창호;문태수;유충렬;이광배;김현욱;윤충화
    • 한국정보처리학회논문지
    • /
    • 제2권6호
    • /
    • pp.985-994
    • /
    • 1995
  • 본 논문에서는 높은 시스템 가용성을 제공할 뿐만 아니라 고장 발생시 데이타 손실이 없는 두 가지 hot standby 구조를 제안한다. 제안된 hot standby 구조의 성능 을 평가하기 위해서 hot standby 구조로부터 동기 unit 만을 제거한 warm standby 구 조를 고려하였으며, 각 구조에 대한 시스템 불가동률을 마르코프 상태도를 이용하여 구한 후 서로 비교 평가하였다. 본 연구 결과, 대부분의 경우 hot standby 구조가 warm standby 구조보다 훨씬 높은 가동률을 제공하였으며, 외부 동기 unit로 구성된 hot standby 구조가 내부 동기 unit로 구성 된 hot standby 구조보다 향상 약간 높은 시스템 가동률을 유지하였다. 각 구조에 대한 active set time과 personnel recovery rate 는 시스템 가동률에 거의 영향을 미치지 않았다. 그러나 data recovery time 이 임계치 이상으로 증가하는 경우에는 hot standby 구조와 warm standby구조 모두 시스 템 가동률이 급격히 저하되었고 특히 hot standby 구조의 성능 저하가 심하여 궁극적으로 warm standby 구조보다 시스템 가동률이 떨어지는 현상을 보였다.

  • PDF

철도신호 대기이중중계구조 제어기의 향상된 신뢰도평가방법에 관한 연구 (A Study on the Advanced Reliability Assessment Method about Hot-Standby Sparing System for Railway Signaling)

  • 민근홍;이종우
    • 전기학회논문지
    • /
    • 제56권9호
    • /
    • pp.1589-1595
    • /
    • 2007
  • This paper suggests the advanced reliability assessment tool for railway signaling Hot-Standby sparing system. Existing reliability assessment for Hot-Standby sparing system controller is done by using single module mean failure rate based on approximated Hot standby sparing system function. Although approximated Hot standby sparing system function can be applied to various Hot standby sparing system, however, it is not able to reflect the exact system structure. In this paper, we suggest the advanced reliability function by identifying changeover-related failure factors and common failure mode which is not considered in existing approximated Hot standby sparing system reliability function via developing Hot standby sparing system model for railway signaling and applying FMECA to this model. Also. we compare reliability assessment results for model system to reliability assessment for existing system.

Cost-effective Power System with an Electronic Double Layer Capacitor for Reducing the Standby Power Consumption of Consumer Electronic Devices

  • Park, Kyung-Hwa;Yi, Kang-Hyun
    • Journal of Power Electronics
    • /
    • 제13권3호
    • /
    • pp.362-368
    • /
    • 2013
  • Commercial home appliances using remotely controlled systems consume electric power while in standby mode to prepare for receiving a remote turn-on signal. The proposed power system can significantly reduce standby power consumption without increasing cost. Furthermore, since a Electronic Double Layer Capacitor (EDLC) is used as an auxiliary power storage element, the life cycle is longer and system reliability can be better than with existing approaches. When the energy of the EDLC is not sufficient for turning on the appliance, the power system charges the EDLC without affecting the main system. The proposed power system is verified with a commercial LCD TV and a 3.93mW standby consumption is obtained. This standby consumption can be regarded as zero standby equipment according to the IEC-62031 standard.

Operation optimization of auxiliary electric boiler system in HTR-PM nuclear power plant

  • Du, Xingxuan;Ma, Xiaolong;Liu, Junfeng;Wu, Shifa;Wang, Pengfei
    • Nuclear Engineering and Technology
    • /
    • 제54권8호
    • /
    • pp.2840-2851
    • /
    • 2022
  • Electric boilers (EBs) are the backup steam source for the auxiliary steam system of high-temperature gas-cooled reactor nuclear power plants. When the plant is in normal operations, the EB is always in hot standby status. However, the current hot standby operation strategy has problems of slow response, high power consumption, and long operation time. To solve these problems, this study focuses on the optimization of hot standby operations for the EB system. First, mathematical models of an electrode immersion EB and its accompanying deaerator were established. Then, a control simulation platform of the EB system was developed in MATLAB/Simulink implementing the established mathematical models and corresponding control systems. Finally, two optimization strategies for the EB hot standby operation were proposed, followed by dynamic simulations of the EB system transient from hot standby to normal operations. The results indicate that the proposed optimization strategies can significantly speed up the transient response of the EB system from hot standby to normal operations and reduce the power consumption in hot standby operations, improving the dynamic performance and economy of the system.

스마트 홈에서 Zigbee 기반의 대기전력 제어 연구 (A Study of Standby Power Control Based on Zigbee in Smart Home)

  • 이성준;김도현
    • 한국멀티미디어학회논문지
    • /
    • 제17권7호
    • /
    • pp.879-885
    • /
    • 2014
  • This paper designs and implements the 2 plug type standby power control outlet based on IEEE 802.15.4 using Zigbee and IPv6 network in order to reduce the standby power to the user. The standby power control system is consisted of direct power and standby power plug. Also this system can communicate bidirectionally in wireless because built-in wireless communication modules. One gateway is linked with many standby power control outlet in wireless. Each standby power control outlet executes the operation needed in power control independently. Also each standby power control outlet has its own power can be detected in real time independently of the power can be controlled.

병렬구조의 계전기를 갖는 대기중복시스템 신뢰도 향상에 관한 연구 (A Study on Increasing the Standby Redundant System Reliability with the Relay of Parallel Structure)

  • 이규용
    • 산업경영시스템학회지
    • /
    • 제13권22호
    • /
    • pp.59-64
    • /
    • 1990
  • This paper is aimed to study the standby redundant system with the relay of parallel structure, by making use of the character of standby system, which reliability is higher than parallel system's if the relay has higher reliability than a certain level. By assigning the low-priced relay to the subsystem, this method increases the relay reliability, optimizes the standby redundant system reliability without violating the restrictions, and consequently reduces the cost.

  • PDF

다기능 대기부품을 갖는 다중상태 UH-60 헬기 유압펌프시스템의 신뢰도 분석 (Reliability Analysis of Multi-State UH-60 Helicopter Hydraulic Pump System with a Multi-Functional Standby Component)

  • 김동현;이석훈;임재학
    • 한국신뢰성학회지:신뢰성응용연구
    • /
    • 제15권4호
    • /
    • pp.233-240
    • /
    • 2015
  • We analyse reliability of multi-state UH-60 helicopter hydraulic pump system with a multi-functional standby component using Markov analysis method. The system consists of seven components: 2 main pumps, 1 standby pump, 2 primary servos, and 2 tail rotor servos. The standby pump can take over when one more than components fail. Therefore the standby pump is multi-functional standby component. The system has four states: good, deteriorated, dangerous, and failed. The components have 2 states: working and failed. We assume the system is unrepairable when the components fail. We estimate failure distributions and rates using collected failure time data in field. And we classify multi-state of the system according to emergency procedure of UH-60A student handout. We obtain the reliabilities of multi-state system using Visual Basic program because the differential equations is extremely complicated and tedious to solve.

혼합 중복 k-out-of-n 시스템 신뢰도 최적화 문제 (A k-out-of-n System Reliability Optimization Problem with Mixed Redundancy)

  • 백승원;전건욱
    • 대한산업공학회지
    • /
    • 제39권2호
    • /
    • pp.90-98
    • /
    • 2013
  • The k-out-of-n system with mixed redundancy is defined as k-out-of-n system which both includes warm-standby and cold-standby components. In case that operating components in the system fail and the system needs quick transition of standby components to operation state, the k-out-of-n system with mixed redundancy is useful for decreasing system failure rate and operational cost. Reliability-Redundancy Optimization Problem (RROP) involves selection of components with multiple choices and redundancy levels for maximizing system reliability with constraints such as cost, weight, etc. A solution methodology by using harmony search algorithm for RROP of the k-out-of-n system with mixed redundancy to maximize system reliability was suggested in this study.