• Title/Summary/Keyword: Standard unit cost

Search Result 199, Processing Time 0.025 seconds

Problems and Improvement Schemes to Historical Cost Fluctuation Ratio Calculation According to the Escalation (물가변동에 따른 실적공사비 등락률 산출의 문제점 및 개선방안)

  • Jeong, Ki-Chang;Kim, Young-Ai;Kim, Yong-Su
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.540-545
    • /
    • 2008
  • The purpose of this study is to suggest problems and improving plan of process of calculating escalation rate of the Historical Cost by price fluctuation. In order to implement this research, we analyzed problems by calculating the rate of price fluctuation with Historical Cost and measurement applying method making on-site with historical cost data were included as samples and suggested improving plan to the adjustment of contract cost. The results of research according to this are same as followings:1) Of all construction details, it is more appropriate to calculate price fluctuation by applying measurement method to the contents of historical cost unit. 2) To avoid confusion in calculating method, it was indicated that amendment in part should be achieved in order to calculate by measuring the part of calculating escalation rate of Historical Cost at related law and regulation.

  • PDF

New GPU computing algorithm for wind load uncertainty analysis on high-rise systems

  • Wei, Cui;Luca, Caracoglia
    • Wind and Structures
    • /
    • v.21 no.5
    • /
    • pp.461-487
    • /
    • 2015
  • In recent years, the Graphics Processing Unit (GPU) has become a competitive computing technology in comparison with the standard Central Processing Unit (CPU) technology due to reduced unit cost, energy and computing time. This paper describes the derivation and implementation of GPU-based algorithms for the analysis of wind loading uncertainty on high-rise systems, in line with the research field of probability-based wind engineering. The study begins by presenting an application of the GPU technology to basic linear algebra problems to demonstrate advantages and limitations. Subsequently, Monte-Carlo integration and synthetic generation of wind turbulence are examined. Finally, the GPU architecture is used for the dynamic analysis of three high-rise structural systems under uncertain wind loads. In the first example the fragility analysis of a single degree-of-freedom structure is illustrated. Since fragility analysis employs sampling-based Monte Carlo simulation, it is feasible to distribute the evaluation of different random parameters among different GPU threads and to compute the results in parallel. In the second case the fragility analysis is carried out on a continuum structure, i.e., a tall building, in which double integration is required to evaluate the generalized turbulent wind load and the dynamic response in the frequency domain. The third example examines the computation of the generalized coupled wind load and response on a tall building in both along-wind and cross-wind directions. It is concluded that the GPU can perform computational tasks on average 10 times faster than the CPU.

An Economic Analysis by Applying Extended Crime Prevention Standards for Buildings (건축물 범죄예방 기준 확대적용에 따른 경제성 분석)

  • Hyeon, Tae-Hwan;Cho, Young-Jin
    • Journal of the Architectural Institute of Korea Planning & Design
    • /
    • v.35 no.11
    • /
    • pp.53-60
    • /
    • 2019
  • Multi-unit house, multi-household house, row house and apartments with less than 500 households were included in the list of anti-crime for buildings following the revision of the "notice of crime prevention building standards" on July 31, 2019. Strengthening the performance of crime prevention buildings is inevitable to increase the cost of building construction, including installation of preventive facilities and use of facilities that have secured performance. Thus an economic analysis on the costs and expected benefits of implementing the standards is required for social consensus. Economic analysis is divided into cost analysis and benefit analysis. This study aims to perform an economic analysis on the installation of crime prevention facilities in the buildings subject to expanded crime prevention obligations. Cost analysis is calculated as the sum of the cost of installation and the price of the crime prevention facilities installed for each target residential building. Benefit analysis is calculated as the social cost of targeted crimes that are expected to decrease due to the installation of crime prevention facilities. Economic analysis shows that the total cost of installing crime prevention facilities in residential buildings is estimated at 107.31 billion won per year, while the total benefit from enhanced crime prevention performance is estimated at 9.38 billion won per year. Considering inflation, benefits are expected to outpace costs in the 28th year since the system was implemented.

A Study on the Development of Work-Crew based Daily-Productivity for Representative B.O.Q Item in Road Project (도로공사 대표공종의 생산성 정보 개발에 대한 연구)

  • Seo, Ji-Hyeong;Park, Hyung-Keun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.6
    • /
    • pp.42-53
    • /
    • 2011
  • This study is to present a method of compiling consistently accurate construction cost estimates in minimum of time. There are two kind of applications for estimating system based on quantity-per-unit and the daily work-crew. The former system is still applied 45% as a estimating method to construction job site by the second half of 2010. However, it is necessary for quantity-per-unit to complement the defect of standard integrating specification and improve the integrating method to the various construction conditions. The later system is intended to represent a standard or basic core which can be adopted in many type of construction estimating used across the wide variety of construction in advanced countries. In this study daily work-crew based on productivity is applied to the representative B.O.Q Item in road project. These results are compared to productivity of Japan and U.S.A estimated under the similar circumstances.

A Study on Minimizing of Condenser Pressure Loss according to the Temperature Rise of the Seawater for Korean Standard Coal-fired Power Plants (표준석탄화력 발전소 해수온도 상승에 따른 복수기 압력 손실 최소화 방안)

  • An, Hyo-Yoel;Moon, Seung-Jae
    • Plant Journal
    • /
    • v.11 no.2
    • /
    • pp.45-51
    • /
    • 2015
  • In this paper, studied condenser operating management which is affecting power plants efficiency considering the cost of poor quality. Sea water temperature and condenser pressure have clear correlation in S power plants. As the sea water temperature changes, condenser pressure changed -1.7~+20 mmHg from design condenser pressure(38.1 mmHg). Use the heat rate correction curve from manufactory company, realized that efficiency and cost of poor quality changed 0.0201%, 12,830 won/h at Unit #1,2 but 0.0155%, 9,832 won/h when condenser pressure 1 mmHg rise. Also, checked that it is changed depend on seasonal corresponding operation, plant ageing and the point of preventive maintenance like overhaul maintenance. This study said if we considered complying with management range and planning overhaul maintenance, then it could help reducing operating maintenance losses minimum 2.5 billion won per 1 year (case : Unit #1, forty days maintenance).

  • PDF

Demolition and Maintenance/Repair Cost Estimation of Road Drop Obstacle for Safety Risk Removal of Anti-tank Defense Facility (대전차 방어시설의 안전위해요소 제거를 위한 낙석 장애물 철거 및 유지보수 비용 산정 연구)

  • Yoo, Yang-Soo;Park, Young Jun;Eun, Hee-Chang;Baek, Jang-Woon
    • Journal of the Korea Institute of Building Construction
    • /
    • v.20 no.4
    • /
    • pp.375-382
    • /
    • 2020
  • Rock drop obstacles on major roads in the border area in South Korea has been installed and operated to prevent and block the movement of enemy units. However, the increase in traffic volume due to the development of the border region causes many problems such as road traffic congestion due to rock drop, traffic safety, and impaired urban aesthetics. Therefore, this study aimed to provide guidelines for demolition and replacement facility installation for rock drop obstacles, which are differently applied to each unit, and to suggest the direction of the Ministry of National Defense's policy regarding maintenance cost for necessary rock drop obstacles required for operation. In this study, as part of a guideline study on the removal of rock drop obstacles and the installation of alternative facilities, a standard unit price was suggested for essential rock drop obstacles, so as to be used as judgment data when deciding whether to remove rock drop obstacles.

Analysis of Impact on ERP Customization Module Using CSR Data

  • Yoo, Byung-Keun;Kim, Seung-Hee
    • Journal of Information Processing Systems
    • /
    • v.17 no.3
    • /
    • pp.473-488
    • /
    • 2021
  • The enterprise resource planning (ERP) system is a standardized and advanced business process that many companies are implementing now-a-days through customization. However, it affects the efficiency of operations as these customizations are based on uniqueness. In this study, we analyzed the impact of customized modules and processing time on customer service request (CSR), by utilizing the stacked CSR data during the construction and operation of ERP, focusing on small and medium-sized enterprises (SMEs). As a result, a positive correlation was found between unit companies and the length of ERP implementation; ERP modules and the length of ERP implementation; ERP modules and unit companies; and the type of ERP implementation and ERP module. In terms of CSR, a comparison of CSR processing time of CBO (customized business object) module and STD (standard) module revealed that while the five modules did not display statistically significant differences, one module demonstrated a statistically very significant difference. In sum, the analysis indicates that the CBO-type CSR and its processing cost are higher than those of STD-type CSR. These results indicate that companies planning to implement an ERP system should consider the ERP module and their customization ratio and level. It not only gives the theoretical validity that should be considered as an indicator for decision making when ERP is constructed, but also its implications on the impact of processing time suggesting that the maintenance costs and project scheduling of ERP software must also be considered. This study is the first to present the degree of impact on the operation and maintenance of customized modules based on actual data and can provide a theoretical basis for applying SW change ratio in the cost estimation of ERP system maintenance.

A Study on Development of a Ground-Source Heat Pump System Utilizing Pile Foundation of a Building (건물 기초를 이용한 지중열 공조시스템의 개발에 관한 연구 (1))

  • Ryozo, Ooka;Nam, Yu-Jin;Kentaro, Sekine;Mutsumi, Yokoi;Yoshiro, Shiba;Hwang, Suck-Ho
    • Proceedings of the SAREK Conference
    • /
    • 2005.11a
    • /
    • pp.148-154
    • /
    • 2005
  • Ground-source (Geothermal) heat pump (GSHP) systems can achieve a higher coefficient of performance than conventional air-source heat pump (ASHP) systems. However, GSHP systems are not widespread in Japan because of their expensive boring costs. The authors have developed a GSHP system that employs the cast-in-place concrete pile foundations of a building as heat exchangers in order to reduce the initial boring cost. In this system, eight U-tubes are arranged around the surface of a cast-in-place concrete pile foundation. The heat exchange capability of this system, subterranean temperature changes and heat pump performance were investigated in a foil-scale experiment. As a result, the average values for heat rejection were 186${\sim}$201 W/m (for pile, 25 W/m per Pair of tubes) while cooling. The average COP of this system was 4.6 while cooling; rendering this system more effective in energy saving terms than the typical ASHP systems. The initial cost of construction per unit for heat extraction and rejection is ${\yen}$72/W for this system, whereas it is f300/W for existing standard borehole systems.

  • PDF

Development A Standard of Traffic Signal Controller and Expectations of Standardization (교통신호제어기 표준 규격 개발)

  • Jeong Jun-Ha;Ahn Gye-Hyung;Oh Young-Tae;Go Gwang-Yong
    • The Journal of The Korea Institute of Intelligent Transport Systems
    • /
    • v.5 no.1 s.9
    • /
    • pp.31-43
    • /
    • 2006
  • As of March 2005, the standard of traffic signal controllers became effective. The standard presents specifications and functions of a traffic signal controller which collects traffic information, sends it to the traffic control center, and controls traffic signal with adequate traffic signal timing provided by the traffic control center. Since the controllers by the previous standard lack parts compatibility and have different control functions and communication protocol, the maintenance cost has been increased. Also, some important functions like conflict detection have not worked out perfectly. To overcome these disadvantages, first of all, this standard secures hardware compatibility. Conflict detection method has been enhanced. Communication protocol to the traffic control center was included in the standard. With this standard, independent maintenance system and prompt treatment of hardware malfunctions becomes possible. Also, the unified intersection traffic control method will increase traffic safety.

  • PDF

Cost Analysis for Dentures Performed at Dental Clinics in Korea (치과의원 의사의 틀니진료 원가 분석)

  • Chung, Seol Hee;Lee, Hye Jin;Oh, Ju-yeon;Woo, Kyung suk;Kim, Han sang
    • Health Policy and Management
    • /
    • v.25 no.2
    • /
    • pp.107-117
    • /
    • 2015
  • Background: The purpose of this study is to analyze the cost for the denture treatment in accordance with the government's plan to expand the National Health Insurance coverage for dental prothesis from July 1, 2012. Methods: We developed the draft of classification of the treatment activities based on the existing researches and expert's review and finalized the standard procedures through confirming by Korean Dental Association. We also made the list of input at each stage of treatments. We conducted survey of 100 dental clinics via post from April 4 to May 20 in 2011 and 37 clinics took part in the survey. The unit of cost calculation is the process from the first visit for denture treatment to setting of denture and adjustment. The manufacturing process performed by dental technician was not included in the cost analysis. Results: The process for the complete denture treatment was classified with 10 stages. The partial denture treatment was classified with 8 stages. The treatment time per each denture is about 5.6 hours for complete dentures and about 6.6 hours for partial dentures. The treatment cost were from 591,108 won to 643,913 won for complete denture and from 670,219 won to 738,840 won for partial denture in 2011, depending on the location, type of the clinics and the types of physician's income. Conclusion: This study shows the example of cost analysis for the treatment to set the fee schedule. Measures to get representative and accurate information need to be made.