• Title/Summary/Keyword: Standard of installation

Search Result 765, Processing Time 0.025 seconds

The Prediction of Transformer Noise by Operating Situation at the Indoor Substation (옥내변전소 운전상황에 따른 변압기 소음예측)

  • Koo, Kyo-Sun;Kweon, Dong-Jin;Kwak, Ju-Sik
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.22 no.10
    • /
    • pp.104-110
    • /
    • 2008
  • Desire about agreeable habitat by enhancement of standard of living has been increased, and common complaints by transformer noise have been happening constantly. It has been installed resonator and sound-proof shutter in order to solve substation's noise problems. But those methods are not effective. Therefore, It is necessary to study transformer noise level that can satisfy noise regulation standard. In this paper described that predicted transformer noise level of substation boundary by operating situation at the indoor substation. Also, Presented most suitable noise level of transformer that satisfy noise regulation standard at the indoor substations through predicted results.

A Study on the Management Plan through Performance Maintenance Analysis of Explosion-proof Facilities (방폭설비 성능유지 실태분석을 통한 관리방안 연구)

  • Kwon, Yong Jun;Byeon, Junghwan
    • Journal of the Korean Society of Safety
    • /
    • v.35 no.2
    • /
    • pp.8-16
    • /
    • 2020
  • In Article 311 of the Regulation on Occupational Safety and Health Standards requires the use of Korean Industrial Standards Act in accordance with the Industrial Standardization Act. However, the classification, inspection, maintenance, design, selection, and installation of explosion hazard locations for explosion and explosion prevention and internalization of 'safety' in the performance maintenance phase of electrical machinery and equipment There is no technical and institutional management plan for remodeling and alteration. Analysis of actual conditions and problems related to the installation, use, and maintenance of explosion-proof equipment, comparative analysis of domestic and international technical standards and systems, technical, institutional and administrative systems and systems related to installation, use, and maintenance of explosion-proof equipment, technical personnel and qualifications, etc. It is to propose legislation, system improvement, and technical standard establishment related to the maintenance of explosion-proof facility performance through improvement of the necessity and feasibility study for establishment of the legal status of the management site and management plan. As technical measures, KS standard revision (draft), KOSHA guide (draft) and explosion-proof facility performance maintenance manual were presented. In addition, the institutional management plan proposed the revised rule on occupational safety and health standards, the revised rule on the restriction of employment of hazardous work, and the manpower training program related to the maintenance of explosion-proof facilities and the qualification plan. Enhance safety at the installation, use, and maintenance stage of explosion-proof structured electrical machinery. It is expected to be used to classify explosion hazards, select related equipment, and to update and standardize standards related to installation, use and maintenance.

Analysis of Installation Effect of Section Speed Enforcement System Using ITS Collection and Operation Data (ITS 수집 및 운영 자료를 활용한 구간과속단속시스템 설치효과 분석)

  • Yoon, Young-Min
    • The Journal of the Korea Contents Association
    • /
    • v.21 no.12
    • /
    • pp.302-309
    • /
    • 2021
  • The section speed enforcement system measures the starting instantaneous speed, the The section speed enforcement system measures the starting instantaneous speed, the ending instantaneous speed, and the section average speed, and imposes fines only for the portion that has been speeding the most. However, according to the Road Traffic Act, most of the systems are installed on highways, so existing research has been conducted on highway sections. In this study, it is expected that the installation of section speed enforcement systems on general national roads will be expanded according to the revision of related laws. ITS collection and operation data targeting the section speed enforcement system installed on National Road 3 Seongnam Icheon-ro was used to analyze traffic speed, standard deviation of traffic speed, and reduction in traffic accidents by dividing it into before installation, trial operation period, and after crackdown. As a result of the analysis, the traffic speed, standard deviation, and traffic accidents decreased by 13%, 25%, and 70%, respectively, after installation, confirming that the installation of the section speed enforcement system greatly contributed to the reduction of accidents.

Supplementation of Regulation on the Offshore Oil Pipeline for Maintenance (해저 송유배관 유지관리를 위한 기준 보완 제시)

  • Kang, Chan-Seong;Moon, Seung-Jae
    • Plant Journal
    • /
    • v.8 no.2
    • /
    • pp.70-81
    • /
    • 2012
  • The study aims to supplement facility management plan and safety regulations & standard of oil pipeline by searching and reviewing related regulation & standard inside and outside of the country. Korean regulation & standard is reviewed based on harbor and fishery design standard of the ministry of maritime affairs and fisheries, general technology standard of oil pipeline safety regulation, gas excavation construction and safety maintenance indicator of Korea gas corporation. Global regulation & standard is reviewed based on U.S standard inspection for offshore pipeline and Europe/Mexico standard inspection for offshore pipeline. The contents of offshore pipeline installation is inserted into pipeline sector for objected facilities of safety inspection regulation & standard and, the standard of safety inspection for offshore pipeline is newly presented into pipeline maintenance part of the planning facilities management with its inspection period and method.

  • PDF

A Case Study on Collaborative Activities for Newly Installation of an Engine in a Helicopter (헬기 엔진의 신규장착을 위한 지원 사례 연구)

  • Ahn, Ieeki;Kim, Jae-Hwan;Sung, Oksuk
    • Journal of Aerospace System Engineering
    • /
    • v.8 no.2
    • /
    • pp.27-32
    • /
    • 2014
  • From the flight safety and the performance point of views, a new engine installation impacts an helicopter development or upgrade program significantly. More than a close relationship between an aircraft manufacturer and an engine manufacturer is necessary for the best integration work from the program initiation phase. In this paper, technical cooperation between aircraft and engine companies, and technical supports by the engine manufacturer for the T700/701K engine during the Surion development program are summarized. The applications of official technical program documents, US Mil-spec, France airworthiness regulations as the standard of the engine installation work, and engineering activities at each phase such as contract, design and manufacturing, flight clearance, ground and flight tests are described. This paper would be a cornerstone for the future domestic helicopter development program.

A Study on Improvement of the Assessment Criteria for New and Renewable Energy Facilities in the G-SEED (G-SEED의 신·재생에너지시설 평가기준 개선 연구)

  • Kim, Wan-Young;Tae, Choon-Seob;Shin, U-Cheol;Yu, Chang-Kyun
    • Journal of the Korean Solar Energy Society
    • /
    • v.35 no.6
    • /
    • pp.43-50
    • /
    • 2015
  • The G-SEED encourages the installation of new and renewable energy facilities through assessments of the new and renewable energy installation rates. The government also regulates the installation rate of new and renewable energy facilities in the 'Project on new and renewable energy obligation in public installations'. The current criteria concerning the new and renewable energy facilities in the G-SEED are the result of an amendment made in July 2010. As over five years have passed since this amendment, the assessment criteria needs to be reenforced. To improve the current criteria, the calculation results of the installation rate of new and renewable energy facilities in the G-SEED were analyzed and compared to the corresponding calculation results of the 'Project on new and renewable energy obligation in public installations'. And an improved draft for the assessment criteria of the new and renewable energy facilities in the G-SEED was proposed.

Laboratory tests on noise emission from appliances and equipment used in water supply installations Part 1: Method of measurement (급수기구 발생음의 실험실 측정방법 제1부 : 측정방법)

  • 양관섭;정갑철;김선우
    • Proceedings of the Korean Society for Noise and Vibration Engineering Conference
    • /
    • 2003.11a
    • /
    • pp.845-850
    • /
    • 2003
  • Noise caused by water installations may lead to annoyance in adjacent rooms, for example in dwellings. hospitals and hotels. This part of standard describes a method of measurement allowing comparable results to be obtained in laboratory measurements. The test conditions described herein constitute the standard reference conditions essential for comparisons between laboratories.

  • PDF

Perception Survey on the Necessity of Improvement for the Standard Buoys Fouling Maintenance

  • Yoo, Yun-Ja;Kim, Tae-Goun;Gug, Seung-Gi
    • Journal of Navigation and Port Research
    • /
    • v.43 no.2
    • /
    • pp.93-100
    • /
    • 2019
  • In 2001, about 20 years after the introduction of the standard buoys, the natural environment and maritime traffic flow changes in the waters near Korea and the necessity of improvement of the AtoN (Aids to Navigation) maintenance was suggested. The IALA provides guidelines for maintenance and management of AtoN, and Korea provides guidelines for the management and operation of standard buoys by means of the Enforcement on the AtoN laws. The objective of this study was to investigate the installation status and the repair status of the standard type buoys by sea area in order to improve the management and operation of the steel standard buoys. In addition, a survey was conducted on the improvement of the steel buoy fouling and the improvement of the lifting inspection cycle towards on the AtoN managers and producers of the representative authority by sea area. In the case of LL-26 (M) buoy type, the standard type buoy installation status of Korea in 2017 was 57.1%, and the LL-26 (M) type was 58.9% showing the highest repair rate. According to the results of the survey on buoys fouling, 51.2% were caused by the attachment of shellfish, and 43.2% were caused by bird feces. The results of the survey on the improvement of the regular buoy inspection cycle showed that the measures are to maintain the current inspection period of 2 years regardless of the characteristics of the sea area (water depth, inside and outside port, buoy size, etc.).

Fault Current Calculation and Coordination by IEC Standards (IEC 표준에 의한 고장전류 계산과 보호협조)

  • Son, Seok-Geum
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.28 no.12
    • /
    • pp.6-12
    • /
    • 2014
  • The safety and reliability of the power system short-circuit current, the short-circuit current depends on the failure to obtain the objective is to quickly eliminate the breaking capacity of the circuit-breaker selection of the cable, the insulation of electrical equipment and protective relay an important factor in determining the level correction and protective relay selection scheme to be meaningful. Standards used in the domestic circuit breaker is applied to the production of IEC standard, but the American National Standards (ANSI / IEEE) by NEMA specification of the fault current calculations and the application of the asymmetric coefficient Korea. Therefore, in this paper, the IEC 60909 standard IEC breaker fault current calculation method and the method for selection of system configurations reviewed and protection system for reviewing the configuration of various protective relays appropriate correction and the correction value is main protection, back-up protection the equipment so that the period of protection relay coordination to minimize accidents and accident protection to minimize interruptions proposed for cooperation.

A Study on Substation equipment Loss Actual State Investigation and Analysis of Office Building (건물의 변전설비 손실 실태조사 및 분석에 관한 연구)

  • 유현재
    • The Proceedings of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.6 no.3
    • /
    • pp.57-62
    • /
    • 1992
  • In this paper, the reasonable design standard of Demand Factor for large office buildings is introduced that was made by the statistical way considering actual conditions, such as investigated electrical equipment capacity, electrical power consumption, etc. The results are as follows. 1) It is shown that th saving of electrical equipment investment, the decrease of power loss, the improvement of facilities utilization and the decrease of electrical power rates can be contributed by the application of the design standard. 2) The effect of reduction is showed to confirm the practical use of the proposed reference Demand Factor, and also, it is believed that this proposed reference Demand Factor will be useful in electrical equipment operation and planning.

  • PDF