• Title/Summary/Keyword: Standard of Survey Cost

Search Result 169, Processing Time 0.028 seconds

Study on Improvement Plan through Appropriateness Analysis of Standard of Survey Cost (측량대가 기준의 적정성 분석을 통한 개선방안 연구)

  • Han, Soohee;Lee, Byoungkil;Lee, Yong Wook
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.38 no.3
    • /
    • pp.211-222
    • /
    • 2020
  • The purpose of this study is to derive a plan to improve the standard of survey cost, which is a system for estimating survey cost operated by the National Geographic Information Institute. The current standard has not been revised significantly since the initial enactment. However, in the situation where the survey industry is getting worse, the actualization of the standard is an urgent task for training engineers and industrial development. In this study, in order to break the problems of the standard and to derive improvement plan, we analyzed the outline, basic characteristics, and history of the standard and compared it with similar domestic ones. We collected opinions from the government and the industry through a survey, and verified labor cost and overhead rates. The conclusions are as follows. First, it is necessary to complement standard for production rate that directly affects direct cost, and to compensate for the missing items in the direct cost. Second, when compared with cost standards in foreign countries and cadastre field, the labor cost in survey field was found to be very low and improvement is needed. Third, the overhead rates were assessed to be appropriate, and the problem of improper overhead design should be coped with by strengthening education and promotion. Fourth, it is necessary to consider the introduction of deliberation committee or standard market price system for rapid response to new technologies.

Research for the survey of method to serviced customer Interruption cost evaluation (전력수용가 정전비용 산출물 위한 설문조사 방법론에 관한 연구)

  • Park, Soo-Man;Kim, Jae-Chul;Moon, Jong-Fil;Bae, Ju-Chun
    • Proceedings of the KIEE Conference
    • /
    • 2002.11b
    • /
    • pp.259-261
    • /
    • 2002
  • KEPCO(Korea Electric Power Corporation) has been management alone before some time. However through the electrical industry reorganization generation and KPX(Korea Power Exchange) were separated on 2001. A marketing and distribution part will be separated in the future. While many problem for appear in future. how to management for power system network is important. unfortunallity, electrical power industry is starting point right now. Thus, detail data is incomplete for this field and detail research for this field is required with distribution reorganazation. In this paper suggest for customer interruption cost compute method to establish a standard. The standard is need to security operation of power system network. The customer interruption cost compute method necessity of customer interruption cost compute method is minimizing process for total cost. As final total cost compute through the interruption cost compute, we can recognize investment point exactly. We cited foreign survey questions, because exactly matched survey questions for in the country circumstance is not exist. And process to survey performance suggest after modify for match in the country circumstance. Survey questions that suggested fer this paper are classified five categories. This paper suggests to detail survey questions and survey method before survey and suggest to how to customer interruption compute when survey data is ensured. Moreover this paper suggest to average interruption cost compute for residential customer using statistical method.

  • PDF

A Study on Policy for Actualizing the Development Cost Estimation Guidelines of e-Learning Contents in Era of Convergence (융합시대의 이러닝 콘텐츠 개발대가 산정기준의 실효성 제고 정책)

  • Noh, Kyoo-Sung;Han, Tae-In
    • Journal of Digital Convergence
    • /
    • v.13 no.9
    • /
    • pp.49-56
    • /
    • 2015
  • Korea government has established clear cost estimation standard based on a survey of e-learning contents development cost and presented 'e-Learning Contents Development Cost Estimation Guidelines' that reflect the characteristics of the e-learning industry. However, if there is no institutional support, this guideline and system fails to achieve the purposes and objectives. And it is likely to be facing a dead document. Therefore, the policy foundation is required. This study suggested the following policy; stepwise activation of cost estimation standard, enact announcement and periodically adjustment of cost estimation standard, installation and operation of cost estimation standard operational committee, conjunction with the e-learning industry survey, cultural diffusion of co-owned copyright, systematic monitoring of the e-learning contents development process, research on activating policy of cost estimation standard, conjunction with the standard contract for enhancing policy effectiveness.

Study of a Online Survey System for Monitering of Construction Cost on Construction Site (건설현장 시장가격 모니터링을 위한 온라인 상시조사에 관한 기초연구)

  • Lee, Ju-hyun;Baek, Seung Ho
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2020.06a
    • /
    • pp.202-203
    • /
    • 2020
  • Unlike price calculation by cost accounting, which categorizes costs into material costs, labor costs, and miscellaneous expenses to determine the construction budget price, construction cost calculation based on Construction Standard Unit Prices utilizes unit prices extracted from market prices of items from projects already completed to estimate costs of similar construction projects. Although unit price information is collected through construction site surveys to revise these construction standard unit prices every year, but due to the limitations of the site survey method, it is difficult to quickly implement the rapid changes in the construction methods and market prices. As such, an important issue that arose was the identification of work items whose prices need urgent revision. This study conducted research on factors that need to be considered when developing online survey system for monitoring construction site market prices. This study is expected to enhance convenience for users, and provide an efficient data collection and management system for administrators.

  • PDF

A Study on the Revision of Construction Standard Unit Price for Concrete Pavement Works (콘크리트포장 시공실태 조사에 따른 표준시장단가 개정 연구)

  • Lee, Ju-hyun;Baek, Seung Ho
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2022.04a
    • /
    • pp.196-197
    • /
    • 2022
  • This study aims to come up with the revision of construction standard unit price for concrete pavement works to improve its applicability and availability by a construction site survey. Construction site survey was conducted from March to November 2021 with 36 construction sites. This results of the revision are expected to support to public construction project owner or estimator in construction cost estimation works.

  • PDF

A Study on the Establishment of Construction Cost Estimation Standard of Underground Steel Construction through Field Survey (지하철골공사 공사비산정기준 마련을 위한 현장조사 연구)

  • Song, Taeseok;Han, Sangjun;An, Bangyul
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.05a
    • /
    • pp.339-340
    • /
    • 2023
  • Steel construction is one of the commonly used methods in building construction due to its efficiency in terms of time and cost. In particular, the top-down method using steel frames is widely used in the construction of underground structures in urban areas to shorten the construction period. However, there is currently no standardized cost estimation for subway steel frame construction in Korea, causing difficulties in determining the expected cost. In this study, we aim to provide basic data for establishing a cost estimation standard for subway steel frame construction through on-site surveys of subway steel frame construction commonly used in urban areas.

  • PDF

Development of Standard Estimates for Garden Construction: Focused on Planting

  • Hong, Kwang-Pyo;Lee, Hyukjae
    • Journal of People, Plants, and Environment
    • /
    • v.22 no.5
    • /
    • pp.467-480
    • /
    • 2019
  • Standard estimates are the numerical data of a unit quantity required for construction work such as the amount of materials, manpower, and the use of equipment required and are also a basis to calculate construction costs. Unfortunately, standard estimates for construction have also been used for garden construction these days as no standard estimates for garden construction have been developed or documented until now. As a result, many problems have arisen at garden construction sites since landscape construction and garden construction differ in terms of scope, size, design and construction methods. The purpose of this study was to develop standard estimates for garden construction for proper calculation of the cost of garden construction and to ensure gardens are created following appropriate construction processes. In order to develop standard estimates for garden construction, a preliminary survey was conducted on experts to understand current issues at first. After that, a questionnaire survey was done to examine problems of construction processes and ways of improvement, and on-site inspections were conducted utilizing CCTVs at construction sites to identify the actual amount of manpower required on site. Based on the results of the surveys and on-site inspections, a draft version of standard estimates for 5 types of planting work for garden construction was developed. Developing standard estimates for garden construction will serve as a stepping stone for the transparent and proper compensation for garden construction work, which will not only contribute to addressing issues between consumers and construction companies, but also to the stabilization of market economy and job creation.

A Study on Development of Construction Standard Production Rates and Cost Analysis for Off-Site Construction (OSC)-Based PC Structure Construction Costs - Comparison with RC Method - (OSC기반 PC구조 공사비 산정을 위한 품셈개발 및 공사비 분석 - RC공법과 비교 -)

  • Lee, Hansoo;Lee, Chiho;Han, Heesu;Lee, Jeongwook
    • Korean Journal of Construction Engineering and Management
    • /
    • v.25 no.2
    • /
    • pp.56-68
    • /
    • 2024
  • A construction standard production rates system for the factory built and on-site installation phases of OSC (Off-Site Construction)-based precast concrete (PC) structures in apartment buildings was recently proposed to establish an objective cost standard (Lee et al., 2021). In addition, the Korean government has taken steps to improve the institutional foundation for the systematic calculation of PC construction costs such as revising construction standard production rates for major components that can be applied to the on-site installation phase of PC method. In this study, we analyzed the results of a field survey of apartment building PC structures and collected expert opinions to develop factory-built and on-site installation standard production rates that can be applied to apartment building PC method. We also propose directions for improving the standard production rates so that they can be applied to the site and component of apartment buildings by comparing them with the current standard production rates. This study also derived the cost characteristics and cost reduction measures of PC construction by calculating the construction costs using the developed rates and comparing the construction costs with the RC methods of apartment buildings of the same scale. The construction standard production rates for PC construction derived in this study are expected to contribute to the spread of PC construction by ensuring the objectivity and consistency of the results of PC methods cost estimation.

An Dynamic Optimal Allocation for the Stratified Randomized Response Technique (층화확률화 응답기법에 대한 동적 최적배분)

  • Son, Chang-Kyoon;Hong, Ki-Hak;Lee, Gi-Sung
    • Communications for Statistical Applications and Methods
    • /
    • v.16 no.4
    • /
    • pp.595-603
    • /
    • 2009
  • Typically the standard optimal allocation method distributes the sample for each stratum considering survey cost. In case of varying survey cost for each survey unit, we need to consider more practical allocation method. In other words, according to characteristics of an individual unit, we consider the optimal dynamic allocation method which first selects the survey unit having maximum value of benefit cost ratio. In terms of this, the proposed allocation method is different from standard optimal allocation method which allocate samples for each stratum and selects the random sample according to each size of sample. This paper is considered the dynamic optimal allocation method for the stratified randomized response technique which surveys for sensitive characteristic of survey units such as drug abuse, abortion, alcoholic. We prove the practical usefulness of proposed method using the numerical example.

A Study of Variations in Cost-of-Living Index (도시가계 생계비 산정기준의 다양화를 위한 연구)

    • Journal of Families and Better Life
    • /
    • v.15 no.4
    • /
    • pp.137-148
    • /
    • 1997
  • The purpose of this study is to set the various cost-of-living standards utilizing a published national data. 1995 annual data, The Family Income and Expenditure Survey, were used to set the standards of living. Four index reflecting health and decency level, normal level, minimum of health and decency level, and pauper level were suggested and the cost-of-living of each level were estimated. Results showed that cost-of-living estimated in this study were not quite different from those of former studies, but the name of the standard-of-living need to be changed.

  • PDF