Browse > Article
http://dx.doi.org/10.7848/ksgpc.2020.38.3.211

Study on Improvement Plan through Appropriateness Analysis of Standard of Survey Cost  

Han, Soohee (Dept. of Geoinformatics Engineering, Kyungil University)
Lee, Byoungkil (Dept. of Civil Engineering, Kyonggi University)
Lee, Yong Wook (Dept. of Civil & Environmental Engineering, Induk University)
Publication Information
Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography / v.38, no.3, 2020 , pp. 211-222 More about this Journal
Abstract
The purpose of this study is to derive a plan to improve the standard of survey cost, which is a system for estimating survey cost operated by the National Geographic Information Institute. The current standard has not been revised significantly since the initial enactment. However, in the situation where the survey industry is getting worse, the actualization of the standard is an urgent task for training engineers and industrial development. In this study, in order to break the problems of the standard and to derive improvement plan, we analyzed the outline, basic characteristics, and history of the standard and compared it with similar domestic ones. We collected opinions from the government and the industry through a survey, and verified labor cost and overhead rates. The conclusions are as follows. First, it is necessary to complement standard for production rate that directly affects direct cost, and to compensate for the missing items in the direct cost. Second, when compared with cost standards in foreign countries and cadastre field, the labor cost in survey field was found to be very low and improvement is needed. Third, the overhead rates were assessed to be appropriate, and the problem of improper overhead design should be coped with by strengthening education and promotion. Fourth, it is necessary to consider the introduction of deliberation committee or standard market price system for rapid response to new technologies.
Keywords
Standard of Survey Cost; Direct Cost; Overhead; Labor Cost; Standard for Production Rate;
Citations & Related Records
연도 인용수 순위
  • Reference
1 Park, Y.S. (2018), Financial Statement Analysis for 2017, Report, The Bank of Korea, Seoul, Korea.
2 Yu, I.H (2005), A Study on the Estimation of Projected Price for Construction Works by Means of Cost Accounting and Historical Cost Data, Master's thesis, Chungnam National University, Daejeon, Korea.
3 Jung, U.S. (2012), A Comparative Study of Cost Estimate System for Public Construction Project - In Case of Landscape Architectural Construction, Master's thesis, University of Seoul, Seoul, Korea.
4 Lee, J.M. (2015), Analysis and Realization of Surveying Cost Based on the Surveying Cost Criteria and Construction Standard, Master's thesis, University of Seoul, Seoul, Korea.
5 Lee, T. (2016), Policy Directions for Establishing a Pricing Guide for Construction Engineering Services in South Korea: A Multifaceted Analysis on the Perception and the Status Quo, Ph.D. dissertation, Yonsei University, Seoul, Korea.
6 Lim, S.Y., Sakong, H.S., and Oh, C. (2018), Geospatial Information Strategies for the Hyper-connected Smart City, Report, KRIHS, Sejong-si, Korea.