Standard Work Process to Reduce a Risk of Track Exchange Work for Railroad (철도 운행선 변경작업의 리스크 저감을 위한 표준작업 프로세스 도출)

  • Yoon, Chang Geun;Park, Su Yeul;Kim, Seok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.22 no.6
    • /
    • pp.131-137
    • /
    • 2021
  • Since many resources are put into the work of changing the railway operation within limited time, it is important to have a specific work plan and safety management. For this reason, the work schedule is shared in advance, and parallel work is being carried out simultaneously by rail system, such as tracks, trolly wires, and signals. However, due to the nature of the transfer work, the work is carried out at night when the railway operation is finished, and many resources are put into the limited area of the operating line, so the risk of safety accidents and failure to change the operating line is recognized as high. Nevertheless, there is still not enough research done in korea regarding the operation line change construction. Therefore, this study is conducted a survey on the track exchange work of railroad for working people, and analyzed the results of the survey. Finally, a standard work process was suggested to reduce the risk of track exchange work.

Process Standardization for the Construction of Job-Exposure Matrix Using the Work Environment Measurement Database (작업환경측정 결과 데이터베이스를 활용한 직무노출매트릭스 구축을 위한 공정 표준화)

  • Sangjun Choi;Ju-Hyun Park;Dong-Hee Koh;Donguk Park;Hwan-Cheol Kim;Dae Sung Lim;Yeji Sung;Kyoung Yoon Ko;Ji Seon Lim;Hoekyeong Seo
    • Journal of Korean Society of Occupational and Environmental Hygiene
    • /
    • v.33 no.1
    • /
    • pp.78-90
    • /
    • 2023
  • Objectives: The purpose of this study is to standardize the process code of the work environment measurement database (WEMD) for the construction of a job-exposure matrix (JEM). Methods: The standard process code (SPC) was reclassified based on process similarity and drawing upon the code used in the existing K2B. It was supplemented through review by industrial hygiene experts. In addition, an index word database related to SPC was created and used for SPC search. A pilot evaluation project was conducted by experts to evaluate the validity of the newly reclassified standard process code. Results: A total of 70 final SPCs were developed, including 31 processes related to the construction industry. Using the Shiny program, we developed a standard code finder that can be used on the web (https://kscf.shinyapps.io/scf_app/). As a result of the pilot evaluation, it was determined that it was easier to search for standard codes than previous codes, so it was highly utilized. Conclusions: It is expected that JEM construction using industry-process information drawing on WEMD data will be possible using the 70 newly standardized process codes.

Research of Integrated System Design Process for Concurrency Design Activity (동시적 업무수행을 위한 통합된 시스템 설계 프로세스 연구)

  • Kim Jin-Hoon;Park Young-Won
    • Journal of Korean Society for Quality Management
    • /
    • v.32 no.3
    • /
    • pp.141-152
    • /
    • 2004
  • This study describes process and method to establish concurrent and/or sequential schedule planning for the system design process of the EIA632 standard. For this purpose, the study suggest Process and method that are context analysis of standard process, interface definition from activity decomposition, integration of related activities, and definition of concurrent and/or sequential work flow. The proposed process and method will contribute to minimize time loss that is emerged from activities iteration.

The Case Study on The Introduction and Practical Application of the Budget Management System -On the Performance Measurement of Standard Work Unit- (예산관리제도의 도입과 실제적 운용에 관한 사례연구 -표준적인 작업의 성과측정을 중심으로-)

  • 윤용운
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.2 no.2
    • /
    • pp.39-51
    • /
    • 1979
  • In introducing and applying the budget management system, the question of how to establish management structure(skelton) representing budget management responsible unit is significantly related to the degree of accuracy and analysis on the performance measurement of standard work unit. We have the following rational process of establishing performance measurement of budget management System ; 1) Standardization of work method 2) Establishment of management structure 3) Institution of budget management system. Especially, this system is based on a premise of efficiency of objectives management, it is assumed that performance measurement in the standard work unit must be enforced according to the basis and categories of performance evaluation based on the evaluating work unit. Therefore, most of all, the following three detail questions(subjects) are to be determined in order to rationalize these above principles to a maximum possible extent of performance measurement system. First, we established respective performance standard unit with respect to such detailed work unit, performance standard unit of which were accurately applicable directly from using the budget ana objectives account data and their supplementary data of the work measurement techniques. Second, by using the above mentioned question, over all evaluation and suggestion are made based on the study of the recording for each work unit development, budget management and production nit (volume of production) Third, the measurement of performance of budget management system is based on the principle of standard work unit, compared with the standard basis and actual work unit by period and activities unit and calculated percentage effectiveness according to the above procedure. and so evaluated the efficiency of performance measurement on the budget management system.

  • PDF

Clinical Pathway Verification through Process Mining

  • Jung, Jong-Duk;Kim, Suk-Hoon;Yeo, Hyun-Jin
    • Journal of the Korea Society of Computer and Information
    • /
    • v.23 no.4
    • /
    • pp.115-120
    • /
    • 2018
  • A Clinical Pathway(CP) is standard process to way of treat diseases or injuries which is adapted to each hospital based on National Clinical Practice Guideline(CPG). Since CP is standard guideline for doctors and nurses working in a hospital, making and modifying CP is one of the most important administrational work for hospital and also rare work because once it is fixed, it's not changed whether there are new kind of disease discovered or new treatment is developed. However, in present, patient's waiting time during hospital residence process, is discussed as service competitive for patients. In this research, we utilize process mining tool to verify patients treatment process follows CP with EMR(Electronic Medical Record) in a sample hospital, and suggest modifcation point of CP through verification.

Automation Review of Road Design Standard using Visual Programming (비주얼 프로그래밍 기법을 활용한 도로설계기준 자동검토 방안)

  • Hyoun-seok Moon;Hyeoun-seung Kim
    • Journal of the Society of Disaster Information
    • /
    • v.18 no.4
    • /
    • pp.891-898
    • /
    • 2022
  • Purpose: There is not much time left for mandatory BIM implementation for all sectors and stages of the construction industry. Therefore, it is necessary to find a way to secure technology to substantially improve the productivity of BIM work. In the research, we proposed a method to automatically verify related construction standards for major objects produced by BIM modeling procedures so that engineers can verify construction standards in the BIM-based design process. Method: We defined a modeling work procedure for BIM-based road design work and prepared a method for constructing related design standards in a database. In addition, a process map for developing a BIM-based design basis review automation system was also presented. Result: A BIM-based design standard review automation module was developed using Civil3D and Dynamo. And it was confirmed by the test application that it is possible to quickly judge whether the BIM object manufactured in the design process conforms to the construction design standard. Conclusion: BIM-based design standard review automation technology can improve the productivity of BIM model production work and secure the quality of the BIM model.

A Case Study of Computer Application for Work Study and Standard Time Data in Mid-Level Factory having Working Circumstances of Multi-Item and Multi Process Type -Mainly Focused on the Case of Man-Machine Chart- (다품종 및 다공정 환경 중소기업의 현장직 사원에 대한 작업분석 및 표준설정을 위한 Computer Application 사례연구 -M/M Chart Case를 중심으로-)

  • Yoo, Wang-Jin
    • Journal of Korean Society for Quality Management
    • /
    • v.22 no.2
    • /
    • pp.127-142
    • /
    • 1994
  • In these days, the PCs are widely used in the mid-level factory. But they have low-effectiveness for using them. The main reason should be the lack of useful and practical software in the market. This Case study aimed at the support of the software using DB Language to get M/M chart for aquiring work study and standard time data in the mid-level factory having multi-item and multi-process type. CVA (Chronocycle Video Analysis) is applied to get basic standard time data and working list. Standard time, Sequence of working and allowance time or rate for man and machine will be readily obtained through the menu when the software executing. Detailed program list is systematically shown in Appendix.

  • PDF

A Study on the Productive Capacity Setting of Women's Jacket (여성 재킷의 생산능력 설정을 위한 연구)

  • Kim, Jin-Sun;Shim, Kyu-Nam;Oh, Soon
    • Fashion & Textile Research Journal
    • /
    • v.13 no.2
    • /
    • pp.269-278
    • /
    • 2011
  • This study aims at setting up productive capacity which can be usefully utilized for work management of apparel manufacturers. So as to achieve this goal, an apparel manufacturing company which has been operated by miniline system in Seoul was selected. Standard time and man-hour were calculated to create the accurate productive capacity by observing and measuring a work flow included cutting, sewing and finishing processes. And the result is as following. The standard time for each process was presented as cutting process 47004.5s, sewing process 671050.5s and finishing process 22426.3s. And 15284.4ms was computed as total procession man-hour per day of the manufacturer which is organized of 16 people. Also, the procession man-hour for each process was revealed as cutting process 396.7ms(2.6%), sewing process 14509.3ms(94.9%) and finishing process 378.5ms(2.5%). +Surplus was found in the productivity for each process included the cutting process(outshell, lining and seam process), the sewing process(preparation and arrangement process) and the finishing process. But, additional man-hour 52436.18ms was required because the productive capacity was calculated as -surplus(-13.9%) in the sewing process(part and assembly process). Therefore, a work schedule was planned based on the previous result. However, loading can be ideal when a capacity and a load become '0'. The object company should find the way to reduce allowance(26.25%) of the sewing process through reconstruction of consciousness and improvement in functions with analyzing works of operators. Also, they need to consider an additional supplement of the personnel.

A Pilot Establishment of the Job-Exposure Matrix of Lead Using the Standard Process Code of Nationwide Exposure Databases in Korea

  • Ju-Hyun Park;Sangjun Choi;Dong-Hee Koh;Dae Sung Lim;Hwan-Cheol Kim;Sang-Gil Lee;Jihye Lee;Ji Seon Lim;Yeji Sung;Kyoung Yoon Ko;Donguk Park
    • Safety and Health at Work
    • /
    • v.13 no.4
    • /
    • pp.493-499
    • /
    • 2022
  • Background: The purpose of this study is to construct a job-exposure matrix for lead that accounts for industry and work processes within industries using a nationwide exposure database. Methods: We used the work environment measurement data (WEMD) of lead monitored nationwide from 2015 to 2016. Industrial hygienists standardized the work process codes in the database to 37 standard process and extracted key index words for each process. A total of 37 standardized process codes were allocated to each measurement based on an automated key word search based on the degree of agreement between the measurement information and the standard process index. Summary statistics, including the arithmetic mean, geometric mean, and 95th percentile level (X95), was calculated according to industry, process, and industry process. Using statistical parameters of contrast and precision, we compared the similarity of exposure groups by industry, process, and industry process. Results: The exposure intensity of lead was estimated for 583 exposure groups combined with 128 industry and 35 process. The X95 value of the "casting" process of the "manufacture of basic precious and non-ferrous metals" industry was 53.29 ㎍/m3, exceeding the occupational exposure limit of 50 ㎍/m3. Regardless of the limitation of the minimum number of samples in the exposure group, higher contrast was observed when the exposure groups were by industry process than by industry or process. Conclusion: We evaluated the exposure intensities of lead by combination of industry and process. The results will be helpful in determining more accurate information regarding exposure in lead-related epidemiological studies.

Development of Adoption Strategy and Guideline of Business Process Management Standards: Focusing on Business Process Execution Language (비즈니스 프로세스 관리 표준 도입 전략 및 지침 개발: 비즈니스 프로세스 실행 언어를 중심으로)

  • Kim, Dong-Soo
    • Journal of Information Technology Services
    • /
    • v.5 no.2
    • /
    • pp.107-123
    • /
    • 2006
  • The objectives of this study is to develop a strategy for the adoption of BPM(Business Process Management) standards and an implementation guideline of the BPM standard for BPM solution developers focusing on BPEL(Business Process Execution Language) which is regarded as the most important BPM standard. In the heterogeneous and distributed IT environments, every type of enterprise software requires standards to enhance interoperability. BPMS(Business Process Management System), which is a type of enterprise software requires BPM standards such as BPEL(Business Process Execution Language), BPMN(Business Process Modeling and Notation), BPQL(Business Process Query Language) and so on to achieve multi-system interoperability and component interoperability with their BPM solutions. It is quite helpful to provide the adoption strategy concerning BPM standards for each type of BPM solution vendors who need the BPM standards. Since the BPEL is conceived as the most important BPM standard and widely adopted by many BPM vendors, we have proposed a reference architecture for BPEL implementation and also developed the detail implementation guideline of core components of the BPM system supporting the BPEL standard. Using the strategy and implementation guideline proposed in this work, BPM solution vendors can establish their own standard adoption strategy and they can also develop their BPM solutions supporting the BPM standards more efficiently.