• Title/Summary/Keyword: Standard Schedule

Search Result 231, Processing Time 0.027 seconds

Standard Classifications and Project Numbering System for Integrated Construction Management of Modernized Korean Housing (Hanok) (신한옥 건설통합정보화를 위한 표준정보분류 및 사업번호체계)

  • Jung, Young-Soo;Kim, Woo-Joong;Ha, Ji-Won
    • Korean Journal of Computational Design and Engineering
    • /
    • v.17 no.4
    • /
    • pp.225-233
    • /
    • 2012
  • A comprehensive research effort in order to develop and disseminate modernized Korean housing (Hanok) has recently been initiated by Korean government. This large scale research project encompasses a wide spectrum of housing development including public policy, architectural plans, modules, construction materials and methods, prefabricated assemblies, automated production, construction management, and advanced information systems. For the purpose of integrating and automating the whole processes from an industry perspective, it is of great importance to develop a standard classification system and project numbering system (PNS) for the modernized Korean housing. This paper focuses on the standard classification systems and PNS for cost and schedule control. The distinct characteristics and managerial requirements were explored and embedded into the proposed classifications for modernized Hanok.

Function and Use Evaluation of 'Classification & Disposal Schedule Management' in the Standard Records Management System (표준 기록관리시스템의 '기준관리' 기능 및 이용 평가)

  • Chung, Sang-hee
    • The Korean Journal of Archival Studies
    • /
    • no.37
    • /
    • pp.189-237
    • /
    • 2013
  • Since central governments began to establish and use the Standard Records Management System(RMS) in 2007, more and more local governments and other public organizations have constructed RMS. RMS is the essential tool for records management in electronic environments, but it is not known how well the functions of RMS reflect standards and practice related records management or how many records managers use RMS in performing their works. This paper deals with analyzing the evaluation of 'classification & disposal schedule management' function in RMS. 'Classification & disposal schedule management' function has 4 subfunctions of review of classification & preservation period, management of the schedule items, assignment of classification scheme and reclassification. Classification and disposal schedule is at the heart of intellectual control of records and core area of records management. So it is important to analyze whether this function plays well a role in RMS or not. This research carried out evaluation of function and use about classification & disposal schedule management in RMS. Functional evaluation is to compare and analyze how well RMS meets the functional requirements which home and foreign standards give. Use evaluation is to investigate how records managers use RMS in accomplishing their task of managing classification & disposal schedule and to look into what is the problem with the use. This paper could get the implications through the survey of records managers who are working at central governments, regional local governments and basic local governments. And these implications are considered in institutional, functional, use and administrative aspect. It is important to communicate with stakeholders so that 'classification & disposal schedule management' function, further, all functions of the RMS in practice of records management could be used smoothly. Users of RMS have to raise demands or call for technical solutions of the problems which come up in use, while RMS developers and administrators must make more of an effort to satisfy their demands, reflect them on the RMS and enhance the system.

A Heuristic Approach to the Shift-scheduling Considering the Balance of Work-load in Nuclear Power Plants (호텔 요리사의 인간공학적 작업 위험성 평가)

  • Kim, Dae-Ho;Yun, Young-Su;Lee, Yong-Hee
    • Journal of the Ergonomics Society of Korea
    • /
    • v.25 no.4
    • /
    • pp.1-7
    • /
    • 2006
  • The purpose of this study is to develop an efficient algorithm for the management of the shift schedule in nuclear power plants in consideration with the ergonomic criteria and the regulatory codes. The ergonomic criteria considered are the work hours, overtime-work frequency and working time, start and finishing time of works, allocation of rest times and duty-offs, rotating of shifts, etc. to comply with the regulations such as the Labor Standard Act, the ILO Convention No. 171, 178, "the detailed content of a periodic safety review," enforcement regulations 19-2 of the Atomic Energy Act. The developed algorithm for the shift schedule program adopts a heuristic method to minimize the difference the workload for shift workers in nuclear power plants.

A study on generator maintenance scheduling in competitive electricity markets (경쟁적 전력시장에서 발전기 예방정비계획 알고리즘에 관한 연구)

  • Han, Seok-Man;Shin, Young-Kyun;Kim, Bal-Ho H.;Park, Jong-Bae;Cha, Jun-Min
    • Proceedings of the KIEE Conference
    • /
    • 2003.07a
    • /
    • pp.643-645
    • /
    • 2003
  • In competitive electricity markets, each GenCo establishes generator maintenance schedule and submits to ISO those. Then, ISO reviews and arranges maintenance schedule of each GenCo to meet the standard for reliability. This paper presents the new optimization model which can apply to competitive electricity markets. The object of this model is to minimize schedules variation of each GenCo and to satisfy system reliability.

  • PDF

A Study on the Adopting Franchises System for the Improvement of Emergency Medical Services (응급진료의 효율화를 위한 프랜타이즈 시스템의 도입에 관한 연구)

  • 송미숙
    • Health Policy and Management
    • /
    • v.2 no.2
    • /
    • pp.152-178
    • /
    • 1992
  • This study focuses on making recommendations for the improvement of poor emergency medical services or EMS in Korea. Problems of the current EMS system is widely reviewed. As an alternative of the current system, a franchises system is introduced to EMS. A feasibility study of the new system is carried out as follows. 1) The current EMS system shows such problem as; - Inadequacy of emergency medical fee schedule, - Shortage of emergency medical resources, - Concentration of emergency medical facilities in metropolitan area, - Unestablishment of training program for emergency personnel, - Inappropriateness of patients' behvaviro pattern in emergency care system. 2) Recommendations for the improvement of EMS are as follows: - Well organized communication and transportation system needs to be established by utilizing all the availabl EMS is to be devised for the provision of appropriate emergency care. - A franchises system can be widly adopted so that private organizations are willing to establish a free standing emergency center. - Emergency care fee schedule of the franchises system needs to be appropriate for the system to provide high standard medical services.

  • PDF

An Integrated Construction Management System Based on the Earned Value Concept (EV개념에 의한 통합건설공사관리시스템)

  • Chung Chul-Won;Lee Jeom-Su;Oh Kyu-Whan;Chang Jin-Sik;Lee Yu-Seop;Park Chan-Sik
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.155-162
    • /
    • 2001
  • Recently, in Korea, a few construction companies have been tried to develop a management system, which is able to integrate schedule and cost. In spite of these attempts, however, advanced management techniques can be hardly applied under the BoQ based management system. In order to improve these problems, many studies have been peformed, but yet could not overcome practical limitations. Besides, the application of historical data is below the level since it is so difficult to accumulate and feed-back historical data under the unique character of construction industry. Consequently, lots of time and effort have being wasted to establish control criteria. The newly generated Information is not systematically managed as well. Therefore, this study suggests Integrated Construction Management System complemented the existing practical problems.

  • PDF

Study on the Optimum Route Travel Time for Bus to Improve Bus Schedule Reliability (정시성 확보를 위한 버스노선 당 적정 운행시간 산정 연구)

  • Kim, Min ju;Lee, Young ihn
    • The Journal of The Korea Institute of Intelligent Transport Systems
    • /
    • v.16 no.6
    • /
    • pp.112-123
    • /
    • 2017
  • The accurate forecasting of the public transportation's transit and arrival time has become increasingly important as more people use buses and subways instead of personal vehicles under the government's public transportation promotion policy. Using bus management system (BMS) data, which provide information on the real-time bus location, operation interval, and operation history, it is now possible to analyze the bus schedule reliability. However, the punctuality should always be considered together with the operation safety. Therefore, this study suggests a new methodology to secure both reliability and safety using the BMS data. Unlike other studies, we calculated the bus travel time between two bus stops by dividing the total travel length into 6 sections using 5 different measuring points. In addition, the optimal travel time for each bus route was proposed by analyzing the mean, standard deviation and coefficient of variation of the each section's measurement. This will ensure the reliability, safety and mobility of the bus operation.

Standardization of Factors Classification Associated with Cost and Schedule Variations in Road Construction Projects (도로건설공사 공사비·공사기간 증감요인 분류체계 표준화 연구)

  • Mun, Junbu;Lee, Juhui;Baek, Seungwon;Lee, Kangwook;Yun, Sungmin
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.43 no.6
    • /
    • pp.821-830
    • /
    • 2023
  • Various studies has tried to unveil causes of cost overrun and schedule delay in the road construction project. However, these causes need standardization due to difference by guidelines, relevant research, and facilities. Therefore, this study identifies and elaborate standard road construction cost and schedule variation factors that can be used in the planning and execution of the project. variation factors have been derived and grouped through literature review and modified and supplemented through expert interview. In addition, the connection with the relevant guidance factors is confirmed and the usability is reviewed by applying actual road construction cases. The factors suggested in this study comprehensively include factors of related guidelines and previous research, more clearly distinguish, support decision making.

A Study on the Change in Production Costs and Electricity Tariffs with the Introduction of Renewable Portfolio Standard (RPS(Renewable Portfolio Standard) 제도 도입을 고려한 전기요금변화에 관한 연구)

  • Hong, Hee-Jung;Han, Soek-Man;Kim, Bal-Ho
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.58 no.4
    • /
    • pp.708-717
    • /
    • 2009
  • Recently, Korea government decided to introduce RPS (Renewable Portfolio Standard) mechanism which requires electricity providers to gradually increase the amount of renewable energy sources such as wind, solar, bioenergy, and geothermal. As a consequence, it is expected that the long-term fuel mix would be changed to result in more expensive production and the increased production costs would be distributed to the rate payers via electricity tariffs. This paper presents the change in long-term fuel mix in year 2020 with the four RPS scenarios of 3%, 5%, 10% and 20%, and the methodologies for collecting the increased production costs through new tariff schedule. The studies on long-term fuel mix have been carried out with the GATE-PRO (Generation And Transmission Expansion Program) optimization package, a mixed-integer program developed by the Korea Energy Economics Institute and Hongik university. Three methodologies for distributing the production costs to the rate payers have also been demonstrated.

Database establishment method for process scheduling by means of simulation (시뮬레이션 기법 기반 공정계획 수립을 위한 데이터베이스 구축 방법론)

  • Ko, Yong-Ho;Noh, Jae-Yun;Ngov, Kheang;Shin, Do-Hyoung;Han, Seung-Woo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2022.04a
    • /
    • pp.69-70
    • /
    • 2022
  • The domestic process planning generally relies on calculations based on the construction-standard-production-rate. This method requires trial and error practice during the construction phase to deduce the optimized equipment combination for time and cost. Trial and error during construction can lead to cost overruns and schedule delays. Accordingly, this paper suggests an advanced method for establishing a productivity database based on combinations of equipment and also considering site conditions in order to reduce the timely effort for deducing the optimized equipment combination. For this purpose DES (Discrete Event Simulation) model was developed based on the information provided in the construction-standard-production-rate.

  • PDF