• 제목/요약/키워드: Standard Schedule

검색결과 231건 처리시간 0.029초

사무소 건물의 표준운전상태에 관한 연구 (Study on Standard Operating Conditions for Office Buildings)

  • 박상동;오창섭;우정선;태춘섭
    • 대한설비공학회지:설비저널
    • /
    • 제13권1호
    • /
    • pp.48-63
    • /
    • 1984
  • Standard Building Operation Conditions(SBOC) is to describe typical conditions under which a building would operate during the coulee of a day In order to develop SBOC profiles for office building, we surveyed the operating conditions of randomly selected 20 existing office buildings in Seoul by means of enquetes, and made SBOC profiles. SBOC profiles consist of human occupancy profile, light ins usage profile, system schedule and domestic hot water profile etc. SBOC profiles will be used as input data of DOE-2 computer program to estimate DER(Design Energy Requirements) and to develop EBL (Energy Budget Level), SBOC profiles are not meant to be exact description of how a building will actually be used by its respective users. Rather they are intended to be reasonable typical project ions of how buildings might be used.

  • PDF

The global standard realizing process of the Tire Production Facility and Process Line

  • Suzuki, Takeshi
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.28-29
    • /
    • 2015
  • The tire production facility is a large-scale construction with the complexity of a manufacturing process. The process utilities should be wide-ranging as an effective arrangement of them is highly important. All the necessary information should be clarified together with the manufacturer at the basic planning stage, and this design should be developed to comply with the local culture and regulations. It is important to carry out more advanced engineering in terms of process, cost and quality, even if it is difficult to standardize due to the cultural and geographical conditions and regulations. The key point is to reflect all the given conditions and make a clear design during the design stage, to eliminate the problems after the construction has begun. Another key point is the delivery system, which must be totally managed from the initial design stage until the construction stage by proven companies. Flexibility, quick action, and single responsibility will be the fundamental features in all the steps of the project.

  • PDF

환자분류에 의한 간호인력 산정 및 배치과정 전산화 (Computerization of Nurse Staffing and Scheduling according to Patient Classification)

  • 박정호;박현애;조현;최용선
    • 대한간호학회지
    • /
    • 제26권2호
    • /
    • pp.399-412
    • /
    • 1996
  • Even though Korean medical law stipulates that number of patients attended by a nurse is 2.5 for hospitalization and 30 for ambulatory care, the number of patients cared by a nurse per day is much greater than the standard prescribed by the medical law. Current nursing productivity of nurses is not desirable unless the quality of care considered. Moreover. nursing manpower staffing based on neither current nurses' productivity nor standard of medical law cannot respond properly to dynamic situation of the medical services. As for the nurse scheduling, the critical problem of it in the hospital is determining the day-to-day shift assignments for each nurse for the specified period in a way that satisfies the given requirements of the hospital. Nurse scheduling, however, involves many factors and requirements, manual scheduling requires much time and effort to produce an adequate schedule. Under these backgrounds, the necessity of more efficient management of nursing manpower occupying 1/3 of total hospital workers has been recognized by many nursing administrators. This study was performed to develop a system computerizing nurse staffing and scheduling based on the patient classification. As a preliminary step for the system development, nursing workload in a secondary hospital was measured from Sep. to Oct. 1994. On the grounds of this result, computerization of nurse staffing and scheduling was proceeded with three options. First one is based on the current medical law. Second one is based on the assigned number of nursing staff. And the last is based on the request by patient classification. Computer languages used in this study were MS Visual Basic 3.0 for the staffing and Access 2.0 for the scheduling, respectively. Prospective users may operate this system easily because icons and mouse are used for easier graphic user interface and reducing the need for typing efforts. This system can help nurse administrators manage nursing manpower efficiently and nurses develop quick and easy schedule generation and allow more time for the patient care.

  • PDF

열처리 잣나무 정각재의 재색 변화 및 물성 조사 (Investigation of the Color Change and Physical Properties of Heat-treated Pinus koraiensis Square Lumbers)

  • 임호묵;홍승현;강호양
    • Journal of the Korean Wood Science and Technology
    • /
    • 제42권1호
    • /
    • pp.13-19
    • /
    • 2014
  • 국내의 주 생산 수종인 잣나무 $90{\times}90mm$ 각재의 적정한 열처리 조건을 찾기 위해 3가지 열처리 스케줄을 적용하여 재색과 물성에 미치는 영향을 연구하였다. 1차 열처리시 온도는 $170^{\circ}C$$190^{\circ}C$, 시간은 예비가열시간 1시간을 포함하여 9시간과 13시간을 적용하였다. 2차와 3차 열처리는 모든 공시 각재에 동일하게 $190^{\circ}C$-9시간을 적용하였다. 열처리 횟수가 증가할수록 백색도 $L^*$는 직선적으로 감소하였으며 표준편차도 감소하였다. 열처리 횟수가 증가할수록 색차 ${\Delta}E^*$는 직선적으로 증가하였으며, 표준편차가 커지는 경향이 있었다. 알려진 바와 달리 열처리 시편의 평균 종압축강도가 무처리 시편보다 9% 높았다. 항팽윤율과 중량증가율을 측정하여 열처리 시편의 치수안정성이 무처리보다 크게 증가하였음을 보였다.

DES 알고리즘에 대한 새로운 차분오류주입공격 방법 (A New Type of Differential Fault Analysis on DES Algorithm)

  • 소현동;김성경;홍석희;강은숙
    • 정보보호학회논문지
    • /
    • 제20권6호
    • /
    • pp.3-13
    • /
    • 2010
  • 차분오류주입공격(Differential Fault Analysis, DFA)은 블록 암호를 분석하는 가장 효과적인 부채널 공격(Side-Channel Attacks, SCAs) 방법 중 하나로 알려져 있다. 본 논문에서는 DES (Data Encryption Standard)에 대한 새로운 DFA 방법에 대하여 제안한다. DES에 대한 DFA 방법은 Biham과 Shamir에 의하여 처음으로 제안된 이후, 2009년 Rivain에 의하여 DES의 중간 라운드 (9~12 라운드)에 대한 DFA 방법에 이르기 까지 많은 DFA 방법이 소개되었다. 하지만 기존의 DES에 대한 DFA 방법은 암호화 (또는 복호화)과정에 오류를 주입하는 공격방법임에 비해 본 논문에서 제안하는 DES에 대한 DFA 방법은 DES의 키 생성과정에 오류를 주입하여 분석하는 방법을 처음으로 제안한다. 제안하는 DFA 방법은 기존의 방법들에서 사용하는 오류 모델을 포괄하는 오류 모델을 사용하고 더 척은 오류의 개수로 공격이 가능하다.

Effect of Retaining Preconsruction Primer (PCP) on the Quality of High Performance Protective Coatings Systems

  • Chung, M.K.;Baek, K.K.;Lee, H.I.;Lee, C.H.;Shin, C.S.
    • Corrosion Science and Technology
    • /
    • 제3권2호
    • /
    • pp.59-66
    • /
    • 2004
  • In construction of new ships and large steel bridges in Korea, pre-construction primers (PCP), also known as shop primer, are routinely used and retained as an integral part of the protective coating system. Retention of PCP's can significantly reduce building schedule and cost. Retaining PCP through the so-called "sweep blasting" procedure eliminates or minimizes the necessity of a second blast operation, thus shortening overall schedule as well as reducing labor cost and hazardous waste disposal cost. This study evaluates the feasibility of retaining PCP as the part of primer for high performance protective coating systems applied to ships' hull, bottom and ballast tanks. Upon proving that the retention of the PCP is a viable option, the process of coating application can he improved significantly in terms of cost and working schedule of new ships and large steel bridges. Results indicate that use of the PCP via sweeping blasting in conjunction with standard high performance protective coating systems does not degrade the overall performance of the coating systems. At the same time, it is also highly recommended that the secondary surface preparation should consist of grit blasting of weld burnt and other damaged areas to SSPC SP-IO grade (Sa 2.5 Gr.), Near White Blast Cleaning with proper application and attention to detail.

공구유연성과 공구관련제약을 고려한 통합공정일정계획을 위한 유전알고리즘 (An Improved Genetic Algorithm for Integrated Planning and Scheduling Algorithm Considering Tool Flexibility and Tool Constraints)

  • 김영남;하정훈
    • 산업경영시스템학회지
    • /
    • 제40권2호
    • /
    • pp.111-120
    • /
    • 2017
  • This paper proposes an improved standard genetic algorithm (GA) of making a near optimal schedule for integrated process planning and scheduling problem (IPPS) considering tool flexibility and tool related constraints. Process planning involves the selection of operations and the allocation of resources. Scheduling, meanwhile, determines the sequence order in which operations are executed on each machine. Due to the high degree of complexity, traditionally, a sequential approach has been preferred, which determines process planning firstly and then performs scheduling independently based on the results. The two sub-problems, however, are complicatedly interrelated to each other, so the IPPS tend to solve the two problems simultaneously. Although many studies for IPPS have been conducted in the past, tool flexibility and capacity constraints are rarely considered. Various meta-heuristics, especially GA, have been applied for IPPS, but the performance is yet satisfactory. To improve solution quality against computation time in GA, we adopted three methods. First, we used a random circular queue during generation of an initial population. It can provide sufficient diversity of individuals at the beginning of GA. Second, we adopted an inferior selection to choose the parents for the crossover and mutation operations. It helps to maintain exploitation capability throughout the evolution process. Third, we employed a modification of the hybrid scheduling algorithm to decode the chromosome of the individual into a schedule, which can generate an active and non-delay schedule. The experimental results show that our proposed algorithm is superior to the current best evolutionary algorithms at most benchmark problems.

식혜(食醯) 생산(生産)라인의 공정(工程)/배치(配置) 설계(設計)에 대한 사례 연구 (A Case Study for a Process/Layout Design of a Sikhye Production Line)

  • 양문희
    • 산업공학
    • /
    • 제16권4호
    • /
    • pp.450-462
    • /
    • 2003
  • In this paper, we deal with a process and layout design for producing a planned amount of Sikhye in a given limited time period under a reasonable production schedule. We represent a Sikhye production line as a vector N, the element of which denotes the number of tanks required in each process and our objective is to find an appropriate vector which minimizes the total investment cost. We suggest a systematic method for finding an appropriate N and an appropriate layout to N. In detail, first, we decide the required sequence of processes and the required operations for each process and we estimate standard operating times. Second, constructing a precedence diagram, we find a critical path in order to reduce the total production lead time for a batch of Sikhye. Third, given a limited N space, we manage to construct manually each production schedule using both the processing times of the critical operations and transfer times. Finally, we find an optimal vector N which gives a minimum investment cost and meets both the time constraint and quantity constraint. In addition, with the estimated relative size of each tank, we suggest an appropriate conceptual layout design including an expansion area for future demands, based on the span technique used in the field of architectural design.

음성 EPG 생성기를 내장한 지상파 DMB용 음성 EPG 플랫폼 설계 및 구현 (Design and Implementation of Voice EPG Platform within Voice EPG Generator for Terrestrial DMB)

  • 김경남;임충수;전경재;김환철;최정훈
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2007년도 심포지엄 논문집 정보 및 제어부문
    • /
    • pp.275-277
    • /
    • 2007
  • Recent activation of DMB has enabled various high quality video, audio and data services. And there are various user facilities functions using digital data transmission. One of the various user facilities functions is EPG(Electronic Program Guide). EPG supports schedule of programs on screen for. audiences. EPG is composed to time, title, channel, genre etc. Users can select a program what they want to browsing. Currently EPG services are displaying program schedule on screen visually and make users to input ke:ywords with keypads, remote control devices or touch screen etc. However, this approach could cause a serious restriction to some users like to drivers or visually handicapped persons. A standard for a voice EPG to T-DMB is proposed. This method must be transferred VoiceXML based EPG files from the transmitter to receivers. This approach has a problem to process a standardization because the transmitter and receivers should be modified. We proposed and implemented a voice EPG platform that generates the voice EPG files from T-DMB SI without transferring voice EPG file from the transmitter.

  • PDF

소프트웨어 프레임워크를 이용한 대공유도무기 실시간 분산 시뮬레이터 개발 및 분석 (Development and Analysis of Real-time Distributed Air Defense System Simulator Using a Software Framework)

  • 조병규;윤청
    • 한국군사과학기술학회지
    • /
    • 제8권4호
    • /
    • pp.58-67
    • /
    • 2005
  • To overcome limitations of test scope, schedule and cost, M&S(Modeling & Simulation) technique has been applied for T&E(Test and Evaluation) of the state-of-art weapon systems. This paper proposes an air defense simulation software framework to reduce both redundancy an[1 programming errors in system simulator. The proposed framework consists of a 'model' and a 'middleware' The 'middleware' is a reliable communication service layer that supports not only HLA(High Level Architecture) which is an international standard in M&S but also TCP/IP, UDP and etc. The main role of 'model' is to schedule and to run the real-time distributed simulation. The proposed framework has been applied to M-SAM(Middle range Surface to Air Missile) system simulator. The proposed framework's scheduling and communication performance results are satisfactory and were measured by hardwired NTP(Network Timer Protocol) time-stamp with GPS(Global Positioning System) timer for better precision.