• Title/Summary/Keyword: Standard Quantities per Unit

Search Result 3, Processing Time 0.016 seconds

Comparison of Labor Inputs from Standard Quantities per Unit and Actual Quantities in Apartment Reinforced Concrete Work (공동주택 골조공사의 표준품셈 노무량과 실투입 노무량 비교)

  • Jeon, Sang-Hoon;Koo, Kyo-Jin
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.2
    • /
    • pp.182-189
    • /
    • 2008
  • In private and public construction works, cost estimation and site productivity management are based on designed labor quantities calculated by the Standard Quantities per Unit (SQU). The designed labor quantities are regarded as the basis for insurance costs and safety and environmental costs and also affect the progress measurement of construction works. Even though the designed labor quantities from the SQU has been considered to be different from actual labor quantities put to construction works, there is no research that empirically analyzes the statistical differences. This study analyzes actual labor quantities of form workers, steel-bar fabricators, concrete pourers in reinforced concrete works of the 43 apartment projects, and compares the actual labor quantities to labor quantities from the SQU. It goes further to scrutinize the critical reasons underlying the differences through a survey on 65 practitioners and interviews with 32 site managers and supervisors. The regression models of labor quantities of the apartment concrete work produced by the present study will contribute to reasonable construction contracts based on the past actual costs and practical site management by the actual labor quantities.

A Study on the Leakage Interception Work in the Irrigation Canal Founding on the Sandy Gravel or the Porous Soil (모래자갈과 누수성 토질을 기반으로하는 용수로의 누수방지에 대한 연구)

  • 강신업
    • Magazine of the Korean Society of Agricultural Engineers
    • /
    • v.12 no.2
    • /
    • pp.1965-1970
    • /
    • 1970
  • The experiment was carried out in order to improve the leakage stopping work in the irrigation canal founding on the porous soil. But the experiment had many problems to be studied more owing to the insufficient time and facilities. The results obtained are summarized as follows; 1. Polyethylene film is estimated not to make strength decrease owing to buring in the subsoil, but to make owing to the sunlight. 2. Coated nylon shows the tendency to deteriorate strength when it is buried in the earth or exposed to the sun for long time, but leakage is all but impermeability generally. 3. Leakage loss rates for one hour show some differences in the canal to be full with water in accordance with operating methods, that is, the clay lining section is 12.6%, the coated nylon lining section is 1.7%, the polyethylene film lining section is 1.3%, respectively. 4. Leakage quantities per wetted perimeter unit area show $3.556cc/cm^2/hr$. in the clay lining section, $1.574cc/cm^2/hr$. in the coated nylon section, $0.695cc/cm^2/hr$. in the polyethylene film lining section, respectively. 5. When the construction fund make the clay lining section as a standard, the polyethylene film section is 92.1%, the coated nylon section is 174.2%, respectively. But, the unit cost of execution may be low when the polyethylene film and the coated nylon will enable to mass-produce for the purpose of execution.

  • PDF

The estimating method of construction workable-quantity per unit time - Focused on Pump-Dredge - (건설기계 시간당작업량(Q) 산정 개선방안 -펌프준설선 작업효율(E)을 중심으로-)

  • Ahn, Bang-Ryul;Tae, Yong-Ho;Suh, Sang-Wook
    • Korean Journal of Construction Engineering and Management
    • /
    • v.11 no.3
    • /
    • pp.125-133
    • /
    • 2010
  • Although work-efficiency of construction machinery is a critical factor for estimating its workable-quantity perunit time, the efficiency figure table presented in the Poom-Sam that is used for Construction Cost Estimation of public sectors in Korea is very subjective for practical usage. In order to suggest objective work-efficiency table for a Pump-Dredger, domestic and overseas documentary records were investigated and on-going construction sites were also visited. Moreover, actual work quantities collected from the site visits were compared with the ones calculated based on the Standard Measurement Methods used in Japan. The research found that the table can be revised by means of detailing down by several factors, namely project type, depth of soil, undersea-site shape, and condition on the sea for better estimation of its workable-quantity. The research will be the foundation for applying the rapid development of Construction Equipment and technology to the appropriate cost estimations and the ground work of related studies.