• Title/Summary/Keyword: Standard Construction Process

Search Result 594, Processing Time 0.023 seconds

Establishment of Standard Construction Process of the Infill Modular Construction System (인필 모듈러 건설시스템의 표준 시공프로세스 구축)

  • Kim, Chang-Han;Jung, Chan-Woo;Kim, Hyeong-Su;Hwang, Hyun-Jun;Han, Jae-Goo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.11a
    • /
    • pp.245-246
    • /
    • 2012
  • Lately the Infill Modular Construction System which meets the domestic standards about the structure and fireproof performance and which is applied to the remodeling techniques is being emphasized. In order to introduce the Infill Modular Construction System to domestic market successfully, the development of insufficient element technologies and systematic analysis of process should be preceded. This research aims to establish of Standard Construction Process, as advanced research for the settlement of the Infill Modular Construction System. As advanced research for the activation of the Infill Modular Construction System, this research aims to develop Infill Unit Module's mobile device. This is expected to improve work efficiency. In addition organizing optimized Standard Construction Process by steady work analysis and improvement is being planned.

  • PDF

Standard Process and Work Breakdown Structure for Housing Construction Projects using Infill Modular System (인필식 모듈러 공법을 적용한 주택건설공사의 작업분류체계 구축 및 표준 프로세스 제안)

  • Sohn, Jeong Rak;Lee, Dong Gun;Bang, Jong Dae;Kim, Jin Won
    • Land and Housing Review
    • /
    • v.10 no.3
    • /
    • pp.77-87
    • /
    • 2019
  • In Korea, the modular construction method was applied to the construction of facilities such as military barracks and school dormitories, beginning with the pilot project of Seoul New Elementary School in 2003. In 2017, public modular houses were supplied to Busan(Yongho-dong) and Seoul(Gayang-dong), and modular housing is expected to continue to be supplied in the future. However, there is no clear construction standard for the modular housing construction yet, and there are few cases where the infill modular system is applied. Therefore, this study established the work breakdown structure and proposed a standard process focusing on the infill modular system applied to the construction of Dujeong-dong modular house in Cheonan. Level 1 of the work breakdown structure by construction stage of Infill modular was defined as modular manufacturing, assembly, and finishing process. Level 2 was defined as preparation, modular production, modular infill, modular fixing, floor plastering, building finishing, and other site finishing. Level 3 is defined as 57 detailed unit work of infill modular construction. The standard process of infill modular is proposed for the assembly stage that is commonly applicable to infill modular housing construction. The results of this study can be used for the process plan, transportation plan, lifting plan of modular housing construction.

A Case Study of Status and Characteristics of the BIM Standard in China (중국 BIM 표준의 현황과 특성에 관한 사례 분석)

  • Shin, Kyoo-Chul
    • Journal of KIBIM
    • /
    • v.8 no.3
    • /
    • pp.20-30
    • /
    • 2018
  • The Standard for BIM in Construction of China was released in 2017. The Unified Standard for BIM of China also took effects on 2017. The BIM standards of China needs to be compared with those related guidelines of Korea to find the status and characteristics for future development of BIM application in both countries' construction industries. The research methodology is a case study of comparing various standards of both countries. The case study results reveals many interesting issues for future BIM application and guidelines for practice of design and construction process. The research foundings include followings : LOD (Level of development) are well defined including LOD 350 in Chinese Standard. P-BIM(Practice based BIM) concepts and series of standards are set for the well-defined design and construction process by work stage in China. Korean standards shows more processes of design and documentation in detail. Major three aspects, particularity in BIM standard by work trade, practicality in BIM work process of design and construction, and professionality in subjects of BIM application, are analyzed and compared with various Guidelines of BIM in both countries.

A Fundamental Study on the Application of Performance-Based Construction Standard in Building Construction (건축분야에서의 성능중심 건설기준 적용 방안에 관한 기초적 연구 - 시방서를 중심으로 -)

  • Roh, Tae-Im;Kim, Sang-Heon;Ji, Suk-Won;Choi, Soo-Kyung;Seo, Chee-Ho
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2008.05a
    • /
    • pp.187-191
    • /
    • 2008
  • This study focuses on applying performance-based design to construction standard in building construction. First, it realizes situation and issues of standard specification in building construction, deduces the need factors for establishing performance-based construction standard, and then, it proposes the application of performance standard. The required stages for deducing performance-based construction standard consist of dividing building parts, deducing required functions, performance items and performance requirement and deciding a method of performance evaluation. Through these stages, performance-based design process is deduced.

  • PDF

A Study on the Measures for Work Interference Reduction in Apartment Construction (공동주택 공사의 작업간 간섭 감소 방안에 관한 연구)

  • An Sung-Hoon;Kim Joon-Ho;Kang Kyung-In
    • Journal of the Korea Institute of Building Construction
    • /
    • v.6 no.1 s.19
    • /
    • pp.117-122
    • /
    • 2006
  • Apartments construction is a one of largest parts in buildings construction. In apartments construction, work interferences are frequently occurred in work processing because workspaces are very various and numerous. However, though work process is important for mainly influencing to the schedule, quality and cost of apartments construction, these work interferences are considered a kind of uncertainty, which is difficult to anticipate at construction planning stage, in work processing. Therefore, this study proposed the measures for work interference reduction in apartment buildings construction and the actual planning for practices. The results can be summarized as follows: (1) the standard of work process is checked regularly. (2) The scope of work and work process is adjusted. (3) The standard of drawings process and cost about work interferences work profess is established.

Database establishment method for process scheduling by means of simulation (시뮬레이션 기법 기반 공정계획 수립을 위한 데이터베이스 구축 방법론)

  • Ko, Yong-Ho;Noh, Jae-Yun;Ngov, Kheang;Shin, Do-Hyoung;Han, Seung-Woo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2022.04a
    • /
    • pp.69-70
    • /
    • 2022
  • The domestic process planning generally relies on calculations based on the construction-standard-production-rate. This method requires trial and error practice during the construction phase to deduce the optimized equipment combination for time and cost. Trial and error during construction can lead to cost overruns and schedule delays. Accordingly, this paper suggests an advanced method for establishing a productivity database based on combinations of equipment and also considering site conditions in order to reduce the timely effort for deducing the optimized equipment combination. For this purpose DES (Discrete Event Simulation) model was developed based on the information provided in the construction-standard-production-rate.

  • PDF

A Development of Unified and Consistent BIM Database for Integrated Use of BIM-based Quantities, Process, and Construction Costs in Civil Engineering

  • Lee, Jae-Hong;Lee, Sung-Woo;Kim, Tae-Young
    • Journal of the Korea Society of Computer and Information
    • /
    • v.24 no.2
    • /
    • pp.127-137
    • /
    • 2019
  • In this study, we have developed a calculation system for BIM-based quantities, 4D process, and 5D construction costs, by integrating object shape attributes and the standard classification system which consist of Cost Breakdown System(CBS), Object Breakdown System(OBS) and Work Breakdown System(WBS) in order to use for the 4 dimensional process control of roads and rivers. First, a new BIM library database connected with the BIM library shape objects was built according to the CBS/OBS/WBS standard classification system of the civil engineering field, and a integrated database system of BIM-based quantities, process(4D), and construction costs(5D) for roads and rivers was constructed. Nextly, the process classification system and the cost classification system were automatically disassembled to the BIM objects consisting of the Revit-family style elements. Finally, we added functions for automatically generating four dimensional activities and generating a automatic cost statement according to the combination of WBS and CBS classification system The ultimate goal of this study was to extend the integrated quantities, process(4D), and construction costs(5D) system for new roads and rivers, enabling the integrated use of process(4D) and construction costs(5D) in the design and construction stage, based on the tasks described above.

Case Study for Developing of Standard Process about Defect Consulting Work in Apartment Building (공동주택 하자감정업무 표준절차개발을 위한 사례분석)

  • Park, Jun-Mo;Seo, Deok-Seok
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2014.05a
    • /
    • pp.158-159
    • /
    • 2014
  • There is urgent for defect consulting work to standardize the investigated method, repaired and reinforced method, and estimated cost about defect in increasing a defect lawsuit of apartment building. For the purpose of developing the standard process of defect consulting work, the review that a used process in law and institution should take precedence. There is not prepared the national standard for defect consulting but is dependent on an experience and a practice of consultants. This study analyzes defect consulting case, defines main steps for developing the standard process, and draws phased work factors. As systemizing this, it is expected to apply to basic structure for developing the standard process of defect consulting work for the next.

  • PDF

Knowledge Structure for Cost Estimates Based on Standardized Cost Database (원가산정을 위한 표준분류체계 활용한 지식체계 개발)

  • Im, Haekyung;Kang, Namhee;Choi, Jaehyun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2016.05a
    • /
    • pp.235-236
    • /
    • 2016
  • The importance of construction management has been increasing due to the fact that complex construction projects blend several different industries depending on the traits of the construction. This research was conducted to search for a method to enhance efficiency in cost management of construction project and meet the need for reusability of accumulated construction information. The process of detailed estimation and methodology for using standard unit price information has been developed to strengthen the interoperability in cost information by utilizing a standard classification system. The concept of ontology is proposed as a method of connecting construction information based on a standard breakdown structure to increasing the connectivity of the cost information in the construction project. Therefore, construction information knowledge framework is developed in order to improve the efficiency of the detailed estimation work process.

  • PDF

Methodology for Developing Standard Schedule Activities for Nuclear Power Plant Construction through Probabilistic Coherence Analysis

  • kim, Woojoong
    • International conference on construction engineering and project management
    • /
    • 2017.10a
    • /
    • pp.8-13
    • /
    • 2017
  • Nuclear power plant (NPP) constructions are large scale projects that are executed for several years, and schedule control utilizing various schedules is a critically important factor. Recently Korea independently developed the Advanced Power Reactor (APR) 1400 and is building nuclear facilities applying this new reactor type. The construction of Shin-Kori NPP (SKN) Unit 3, which adopted the APR1400, was completed and commercial operation has begun, while, SKN 4, Shin-Hanul NPP (SHN) Units 1&2, and SKN 5&6 are currently under construction. Prior to the development of the APR1400, Korea built 24 reactors and accumulated the schedule data of various reactor types which provided the foundation for schedule reduction to be possible. However, as there is no schedule development and review system established based on the standard schedule data (standard activities, durations, etc.) by reactor type, the process for developing the schedule for new builds is low in efficiency consuming much time and manpower. Also all construction data has been accumulated based on schedule activities. But because the connectivity of activities between projects is low, it is difficult to utilize such accumulated data (causes for schedule delay, causes for design changes, etc.) in new build projects. Due to such reasons, issues continue to arise in the process of developing standard schedule activities and a standard schedule for nuclear power plant construction. In order to develop a standard schedule for NPP construction, i) the development of an NPP standard schedule activity list, ii) development of the connection logic of NPP standard schedule activities, iii) development of NPP standard schedule activity resources and duration, and iv) integration of schedule data need to be performed. In this paper, an analysis was made on the coherence of schedule activity descriptions of existing NPPs by applying the probabilistic methodology on activities with low connectivity due to the utilization of the numbering system of four APR1400 reactors (SHN 1&2 and SKN 3&4).This study also describes the method for developing a standard schedule activity list and connectivity measures by extracting same and/or similar schedule activities.

  • PDF