• Title/Summary/Keyword: Speed-up of conventional railway line

Search Result 56, Processing Time 0.029 seconds

Proposal of Measuring Method and Design for the Testing Curved Railway of the Tilting Train (틸팅열차 기존선 시험운행 곡선구간 설계 및 계측방안 제시)

  • Yoo, Keun-Su;An, Gang-Yell;Lee, Chang-Hun;Han, Ju-Seop;Park, Min-Kwan
    • Proceedings of the KSR Conference
    • /
    • 2008.06a
    • /
    • pp.173-180
    • /
    • 2008
  • The major objective of this study is to proposal of measuring method and design for the testing curved railway in which the tilting train runs. In order to the speed-up of conventional lines that have many curve lines, there needs a improvement construction of substructure such as the straight or double track work and so on. But in this case, it needs to have a plenty of the cost and the period. Therefore, the tilting train which provides the high-speed service effectively in curve tracks was developed. Besides, the efficiency prediction and the linear synthesis of the existing conventional line for a tiling train service were examined on the preceding studies. So, in this paper we propose the measuring plan and the design of the improvement sections in the testing curved track which was decided as a results of material analysis and field research concerning the extension possibility of transition curves and the bearing of track due to the new developed train traveling. And we look forward to playing a decisive role as reference data on the improvement construction project for the commercial service of the tilting train.

  • PDF

Evaluation on the Applicability of the Conventional Roadbed Stiffness for High Speed Concrete Track (일반철도 노반 강성조건에서의 고속철도용 콘크리트 궤도의 적용성 검토)

  • Lee, Jin Wook;Lee, Seong Hyeok;SaGong, Myung;Lyu, Tae Jin
    • Journal of the Korean Society for Railway
    • /
    • v.16 no.1
    • /
    • pp.40-46
    • /
    • 2013
  • Based on Korean railway design standards, the thicknesses of the reinforced roadbeds of conventional and high speed railways are different, and so too, for the size distribution of the ballast particles. Accordingly, considerable cost would be required to increase operating speeds of conventional lines, in particular related to changing from a ballasted track system to a ballastless one. In this study, applicability of a roadbed which supports conventional ballasted track, for use as a ballastless track for a high speed rail line was examined. A reinforced roadbed for a conventional railway is 20cm thick, and the type of material used for a conventional reinforced roadbed is M-40 (crushed gravel for road embankments). A dynamics test was conducted to evaluate the occurrence of the permanent settlement of the track substructure. These results suggest that, without changes to the track substructure, an operational speed of 400km/h is feasible with a ballastless track. This result; however, is from laboratory experiments. Further studies, such as numerical analyses or field validation, are required.

Active Control of a High-Speed Pantograph using LQ-Servo Controller

  • Shin, Seung-Kwon;Song, Young-Soo;Eum, Ki-Young;Koo, Dong-Hoe
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 2004.08a
    • /
    • pp.1173-1177
    • /
    • 2004
  • The high investment is necessary for the new high speed lines. So the KRRI was interested in the possibility of upgrading the existing line in order to speed up the train in the conventional lines. The tilting train system has been developed because the reconstruction of railway for the cant compensation costs very high. The purpose of the tilting system is to compensate the centrifugal acceleration in order to reduce the lateral acceleration of the passenger at high speed on the curves.The pantograph of the tilting train is indispensable in order to supply the electrification equipments with power in safe. The dynamic interaction between the pantograph and the overhead catenary system causes the variation of the contact force and the contact force variation can cause contact losses, arcing and sparking. If the spark happens between the pantograph and the overhead catenary system, the EMI(electro magnetic interface) and noises may occur. After all, the quality of current collection is deteriorated. This paper deals with the active control of pantograph and presents the LQ-servo controller to reduce the contact force variation.

  • PDF

A Study on the Possible Running Time Estimation of Tilting Train on the Gyeongbu line (경부선 틸팅열차의 가능 운전시간 추정 연구)

  • Rho, Hag-Lae;Han, Seong-Ho
    • The Transactions of the Korean Institute of Electrical Engineers P
    • /
    • v.64 no.4
    • /
    • pp.199-206
    • /
    • 2015
  • A rising attention is paid to the railway system in many countries. KOREA is also of the opinion that the railway has to play a more important role in the near future to face up to the problems that increase gradually in the transport sector. To attract more traffic to the rail networks, it is important for rail modes to have running time competitiveness. Tilting trains, where it is possible to tilt the car-body towards the center of the curve, are a less expensive alternative to shorten travelling times on existing lines. Running time for tilting train is one of the most important factors, with which passenger demand forecasting or economic feasibility analysis will be done. This paper evaluates the speed limitation of tilting train around curves and also presents calculation process of its simulated possible running time. Then the adequacy of estimated time is verified with running time for Korean protype tilting train TTX (Tilting Train eXpress) by actual test run. As a case study, the estimated running time for the production version of tilting train and its time saving are presented compared with 2012's conventional Saemaul trains and non-tilting trains on the Gyeongbu line in the Korean rail network.

Dynamic Analysis of Structure's Approaches through Field Tests in the Conventional Railway (현장계측을 통한 기존선 철도 구조물 접속부의 거동분석)

  • Park, Joon-Oh;Lee, Sang-Bae;Hong, Won-Pyo
    • Proceedings of the KSR Conference
    • /
    • 2007.05a
    • /
    • pp.1864-1874
    • /
    • 2007
  • Korean trains pass many mountain areas, so the volume of structures like bridge and tunnel has large part of railway lines. Train speed-up naturally needs a straight line in railway, then structures are increasing, and the length of structure has more than 70% in Kyongbu high-speed railway. The stiffness of bridge and tunnel is higher than the soil in the roadbed in spite of dynamic difference in vibration and displacement. Differences in stiffness have more dynamic effects and increase the deformation and destruction in the track and roadbed. This influences passenger's comfort and the safety of operation, and it needs more track maintenance. This study selected tunnel with ballast track, tunnel with concrete track, and structure's approaches with short maintenance cycle in the roadbed and had track acceleration tests and track liner inspections using track master in the field. This study will measure periodically to structure's approaches which have very fast track irregularity and analyze dynamic differences and track irregularity near structure's approaches, so realize the cause of track irregularity of structure's approaches and use basic data for reasonably strengthening method of structure's approaches.

  • PDF

The Study of Performance Test of Conventional Curve Line for Korean Tilting Train (한국형 틸팅열차 곡선부 성능시험 연구)

  • Lee, Su-Gil
    • Proceedings of the KIEE Conference
    • /
    • 2009.07a
    • /
    • pp.1211_1212
    • /
    • 2009
  • Tilting trains are now an established feature of railway operations throughout the world. For intercity traffic, tilt provides operators with increasing speeds, and therefore enhanced competitiveness, on existing routes where insufficient traffic or a lack of funds precludes the construction of a dedicated new high-speed railway. Appling the tilting train, we can expect 30% of speed up on existing lines, but the stability of the electric current would be low because of tilting the train. Also, the spark between the catenary and pantagraph cause environmental problems such as noise, radio wave malfunction. Therefore, the tilting on pantagraph for the power suppling device is very essential for stable electric power supply.

  • PDF

A Study on the Evaluation of Curved Track to Speed Up of Railway Vehicle (고속열차 주행시 곡선부의 궤도성능평가)

  • Kang Yun-Suk;Kim Eun;Park Ok-Jung
    • Proceedings of the KSR Conference
    • /
    • 2004.06a
    • /
    • pp.948-954
    • /
    • 2004
  • This study deals with the Evaluation of track system, when Newly developed Korea High Speed Train(KHST) by KRRI and KTX trains are running pass curved track of conventional line. In order to evaluate stability of track and vehicle running safety. the effect of curve radius, the field tests were performed at sharply curved track.

  • PDF

The Estimation of Structural Strength of Improved Frame of Welded Bogie for High Speed Freight Car (고속화차용 용접대차 프레임 개선모델의 강도평가)

  • 황원주;함영삼;강부병;전응식
    • Proceedings of the KSR Conference
    • /
    • 2001.10a
    • /
    • pp.235-239
    • /
    • 2001
  • The bogie of high speed freight car running on conventional line is welded bogie modeled on Y25 bogie developed in Europe. Y25 bogie has speed limit of 110km/h. But it has limiting factors to speed-up as increasing maintenance cost and friction parts pedestal. And also it was reported that cracks are found in the parts where center beam meet bolster and endbeam near bracket for braking part. This study includes stress analysis improved structure of welded bogie for strength evaluation by numerical method and experimental method. According to the study, new configuration bogie shows improvement in strength.

  • PDF

The effect of air-shafts on reducing the pressure fluctuations in the tunnel with small cross sectional area on conventional line (소단면 기존 철도터널에서 통풍공 개수에 따른 터널내 풍압변동 저감효과에 대한 연구)

  • 김동현;강부병;이재환;신민호;이성욱
    • Proceedings of the KSR Conference
    • /
    • 2000.11a
    • /
    • pp.382-389
    • /
    • 2000
  • The purpose of present study is to investigate for reducing pressure fluctuations in tile case of installing tile air-shafts on the side wall of the tunnel with small cross-sectional area on conventional line. Experiments were performed with a 1/61-scale moving model rig for the tunnel of 0.764km length in the condition of tunnel cross-section area of 28 ㎡ According to the results, the maximum pressure fluctuation is reduced by 45% for 19 air-shafts. This results have the speed-up effects of about 33.4km/h for the train running in tunnel.

  • PDF

Dynamic Behavior Evaluation for Split PC sleeper using the Field Test (현장측정을 통한 기존 분기기용 목침목과 개량 분기기 부절침목의 동적거동 비교평가)

  • Um, Hwan-Ju;Lee, Chang-Hun;Eum, Ki-Young
    • Journal of the Korean Society for Railway
    • /
    • v.9 no.6 s.37
    • /
    • pp.746-752
    • /
    • 2006
  • The major objective of this study is to investigate the dynamic behavior evaluation of split PC sleepers for railway turnout by the field test. In railway engineering, a turnout is necessary to allow a vehicle to move from one track to another. So, turnout is required very complex railway technologies such as lolling stock, track. In reference to conventional line speed-up and improvement railway, accurate assembly of turnout affects travel ins qualify of turnout area and running safety. Because of heavy weight and a large volume of the long sleeper used to turnout and car limit, transport and the prerequisite for trouble-free transport of the factory pre-assembled major turnout components is achieved through division of long sleepers. The one of the advantages for using a split sleeper is to reduce the dynamic vibration according to the information of developed nations. Therefore, we investigate the characteristic of dynamic behaviors of split sleepers which are adopted for the first time to improve performance of turnout From the field test results of the split sleeper, it is evaluated that the modification of weight, material and stiffness compared with wood sleeper is very effective for the ballast safety. However, the decrease in vibration of split sleeper was not found out.