• 제목/요약/키워드: Speed-up of conventional railway line

검색결과 56건 처리시간 0.025초

전후동력 새마을호 철도차량의 탈선가능성에 관한 실험적 연구 (Experimental Study on Derailment of a Push-Pull Saemaeul Passenger Car)

  • 함영삼;최성규;오택열
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2000년도 추계학술대회 논문집
    • /
    • pp.243-249
    • /
    • 2000
  • This experimental study is shows speed-up possibility for the conventional railway vehicle. We appraise derailment coefficient then increase the velocity of the kyungbu line, honam line, changhang line, kyungjeon line.

  • PDF

철도차량의 속도향상시 진동 승차감에 대한 실험적 연구 (Experimental Study on Vibration Ride Comfort of a Railway train to increase the Service Speed)

  • 김남포;구병춘
    • 한국소음진동공학회:학술대회논문집
    • /
    • 한국소음진동공학회 2001년도 춘계학술대회논문집
    • /
    • pp.1227-1231
    • /
    • 2001
  • To provide faster service and to relief the road traffic jam, the increase of service speed of conventional railway has been intensively considered. In this study, we measured and analyzed the vibration ride comfort of Saemaeul Train to evaluate the feasibility of 5km/h speed-up in curves and l0km/h speed-up on straight tracks. Four main lines, such as Honam, Kyungboo, ]anghang, Kyungjeon were chosen as representative lines for speed-up feasibility study. The increase of mean ride comfort index in case of speed-up is 0.5-2㏈. The mean ride comfort index of vertical direction in case of speed-up is 107 ∼110 ㏈ for Honam line, 104 ∼112 ㏈ for Kyungboo line, 108∼112 ㏈ for Janghang line and 105∼108 ㏈ for Kyungjeon line. Through this study, we found that the Saemaul Express has slight margin to increase the service speed from the view point of vibration ride comfort.

  • PDF

기존선 고속화 시 열차 하부 열차풍 예측을 위한 현장 측정 시험 (Field Measurements to Predict the Wind Gust under Train at the Speed-up of Conventional Railway Lines)

  • 권혁빈;남성원;고태환;전병길;김만철
    • 한국철도학회논문집
    • /
    • 제13권4호
    • /
    • pp.376-381
    • /
    • 2010
  • 본 연구에서는 주요 간선 철도 노선의 고속화 시 열차풍 예측을 위하여 KTX 열차, 누리로 열차 및 TTX 열차를 대상으로 호남선과 경부선에서 Kiel-probe를 이용한 열차풍 측정 프루브 어레이와 다채널 압력측정 시스템을 이용하여 열차풍 현장 측정 시험을 수행하였다. 시험 결과, 열차가 통과하는 동안의 열차하부 평균유속을 열차의 속도로 나눈 값은 열차 속도에 무관하고 차량의 종류에만 관계하기 때문에, 주어진 열차의 종류와 열차 속도에 대하여 열차 하부의 유속을 예측할 수 있는 것으로 나타났다. 또한 열차 하부 형상과 하부 열차풍특성의 관계에 대해서도 논하였다.

한국형 고속 전철을 활용한 기존선 속도향상 고찰 (Speed Up Test on conventional Line by using Korean High Speed Train(HSR-350x))

  • 김기환;박춘수;김석원
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2004년도 춘계학술대회 논문집
    • /
    • pp.334-338
    • /
    • 2004
  • KTX has started commercial service from Seoul to Busan and Mokpo since April 1, 2004. The service line is composed of new-high speed line and conventional line. Before KTX is runs, the maximum operational speed on conventional line was 140km/h. In order to reduce the traveling time, operation speed of KTX must be increased on the conventional line. So, we performed test running with prototype HSR-350x and verification of safety was made in $10\%$ speed-up. Korean High Speed Train HSR-350x) was developed by G7 - R&D project. In this study, in safety aspect, several technical reviews are introduced and the possibility for reduction of traveling time is investigated on the conventional line by using HSR-350x.

  • PDF

틸팅차량 운행에 따른 기존선 속도향상 효과 분석 (Analysis of speed-up effect of the tilting train on the conventional railway line)

  • 김경태;유재균
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2003년도 추계학술대회 논문집(II)
    • /
    • pp.297-304
    • /
    • 2003
  • As the high speed rail to be opened at 2004, the. railroad will dominate over the transportation market in the Seoul-Busan corridor compared to road transport. But, it is obvious that the LOS(level of service) of railroad at 2004 will be worse in the areas that are not served KTX. For the speed-up of conventional line, it is a worldwide trend that tilting trains are served on the conventional railway line. That is the reason serving tilting trains is very efficient to use existing facilities and improve cruise time when capacity is available. In this paper, we suggest 10 routes are replaced with present operating trains(saemaeul, mugunghwa) by the tilting train.

  • PDF

기존선 가동브래킷 곡선 당김 금구의 완충기능 필요성 (A Need of Buffering Function for Full-Off Fitting on Movable Bracket using Conventional Line)

  • 안영훈;김철수;이승일
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2007년도 춘계학술대회 논문집
    • /
    • pp.219-222
    • /
    • 2007
  • The Full-Off Fitting of Movable Bracket using conventional line have received a dynamic contact impact between contact wire and pantograph of electric rolling stock, so this impact cause a rapid vibration of foreword and back near the supporting point of movable bracket. The Full-Off Fitting on Movable Bracket in conventional line differs from that in high speed line. Now conventional line have required a speed up for new electric locomotive and electric car. In speed-up track and big impact place, the Full-Off Fitting and the dropper often get demage. We have done a study of buffering function to solve that problem in conventional line. We have find a need adopting buffer fitting. It is decrease a dynamic impact between contact wire and pantograph of electric rolling stock.

  • PDF

전철화된 호남선에서의 전기차량에 의한 전차선로 측정 및 평가 (The measurement and evaluation of catenary system by using electric rolling stock on Honam-Line electrified)

  • 안영훈;현충일
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2004년도 춘계학술대회 논문집
    • /
    • pp.1286-1291
    • /
    • 2004
  • This paper was showed evaluation method and technical items for measurement test of new catenary system of Honam(Daejeon - Mokpo) conventional railway electrified. This line have tested by three type new electric rolling stocks in order to test construction quality and operation safety of a new catenary system with speed-up than conventional speed. We have some important experiences through measurement test of catenary system by new device installed on train roof.

  • PDF

Fast clip을 적용한 콘크리트궤도용 노스가동 분기기 개발 (Development of Movable nose crossing turnout on concrete track using Fast Clip)

  • 황광하;류기대;박춘복;박광련;윤병현
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2011년도 정기총회 및 추계학술대회 논문집
    • /
    • pp.287-296
    • /
    • 2011
  • Turnout is a mechanical installation enabling railway trains to be guided from one track to another at a railway junction. A movable nose crossing frog is a device used at a railway turnout to eliminate the gap at the common crossing (High manganese, block, assembly crossing)which can cause impact damage, noise and vibration. Our government has a plan speed up of conventional line to 250km/h semi-high speed. We had already developed flexible turnout with fixed crossing(High manganese) and SFC fastening system can cover in the semi-high speed line In this study is about development of the movable nose crossing turnout available Semi-high speed line on concrete track. This paper describes about geometry, attack angle, bending stress at the nose, switching force, safety of continuous welded long rails. This movable nose crossing turnout is expected greatly increases passing speed of turnout in national railway.

  • PDF

기존선 틸팅차량 시스템 설계에 관한 연구 (The Study for System Design of Tilting Car for Conventional Railroad)

  • 유원희;한성호;김남포;김길동;박광복
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2002년도 춘계학술대회 논문집
    • /
    • pp.317-329
    • /
    • 2002
  • This report was studied about system design of tilting car for speed up for conventional railroad of KNR. The maximum operating speed of Kyun-Pu line was recorded a 140km/h by saemaul train at 1985 and the average speed its is 107km/h now. The chungang line, janghang line and honam line of KNR had rebuilt to the electrified line for operation of tilting train. This report was described about the operation status of advanced countries, the operation situation of trains of KNR, system design for operation and speed up by EMU tilting train on the conventional railroad in the future.

  • PDF

기존선의 선형조건을 고려한 틸팅차량의 허용속도 평가 (Allowable Speed of Tilting Car in the Conventional Line)

  • 유영화;엄주환;엄기영
    • 한국철도학회논문집
    • /
    • 제6권4호
    • /
    • pp.246-251
    • /
    • 2003
  • A quantitative analysis on the amounts of cant and lateral displacement of gravitational center due to the introduction of high-speed tilting car was carried out, based on the current alignment of the conventional line. In addition, the maximum allowable speed in curve and the level of improvement in maximum speed of tilting car were evaluated through the comparison with the maximum speed of locomotive. It was found that the tilting car produces an equivalent amount of cant, which corresponds to 47.5 % of current actual cant. This effect could be explained by the fact that 1.34 m, which is the height of gravitational center of tilting car from the rail level, is much lower than that of locomotive and thus guarantees much higher level of safety in curve. The equivalent amount of cant due to the lateral displacement of gravitational center followed by tilting in curve was 2.4 mm. It was small but not enough to be neglected and must be included in calculating the maximum speed in curve. It could be concluded that the 15 % speed-up of the conventional line is reasonable under the current condition of alignment.