• Title/Summary/Keyword: Speed scheduling

Search Result 284, Processing Time 0.03 seconds

An Algorithm for Single Machine Scheduling Using The Control of Machining Speed (단일공정에서의 가공속도 조절에 의한 생산일정계획)

  • 박찬웅
    • Journal of the military operations research society of Korea
    • /
    • v.24 no.2
    • /
    • pp.162-169
    • /
    • 1998
  • This study presents an single machine scheduling algorithm minimize lateness of product by controlling machining speed. Generally, production scheduling uses the information of process planning. But the production scheduling algorithm has not considered the control of machining speed in its procedures. Therefore, the purpose of this study is to consider the machining speed in production scheduling algorithm for efficient production scheduling. Machining time and machining cost required to manufacture a piece of a product are expressed as a unimodal convex function with respect to machining speed, so it has minimal point at minimum time speed or the minimum cost speed. Therefore, because of considering the machining cost, the control of machining speed for the algorithm is executed between minimum speed and maximum speed. An example is demonstrated to explain the algorithm.

  • PDF

Feedrate Scheduling for High Speed Machining Based on an Improved Cutting Force Model (향상된 절삭력 모델을 이용한 고속 가공의 이송속도 스케줄링)

  • 이한울;고정훈;조동우
    • Proceedings of the Korean Society of Precision Engineering Conference
    • /
    • 2003.06a
    • /
    • pp.141-144
    • /
    • 2003
  • This paper proposes an analytical model of off-line feed rate scheduling to obtain an optimum feed rate for high speed machining. Off-line feed rate scheduling is presented as an advanced technology to regulate cutting forces through change of feed per tooth, which directly affects variation of uncut chip thickness. In this paper, the feed rate scheduling model was developed using a mechanistic cutting force model using cutting-condition-independent coefficients. First, it was verified that cutting force coefficients are not changed with respect to cutting speed. Thus, the feed rate scheduling model using the cutting-condition-independent coefficients can be applied to set the proper feed rates for high speed machining as well as normal machining. Experimental results show that the developed fred rate scheduling model makes it possible to maintain the cutting force at a desired level during high speed machining.

  • PDF

Determination of Machining Speed Considering Failure Cost (절삭 가공에서의 불량 발생 비용을 고려한 가공속도 결정에 관한 연구)

  • Park, Chan-Woong
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.33 no.4
    • /
    • pp.153-158
    • /
    • 2010
  • This study presents a single machine scheduling algorithm to minimize total cost(lateness cost, earliness cost and failure cost) by controlling machining speed. Generally, production scheduling uses the information of process planning and machining speed is not changed at production scheduling. And failure cost is not consider for scheduling algorithm. Therefore, the purpose of this study is to consider the change of machining speed for efficient production scheduling. And performance criteria for algorithm considers total cost. Especially, failure cost of product by increasing machining speed is considered.

A Study on the Gain Scheduling Speed Controller of Permanent Magnet Synchronous Generators for MW-Class Direct-Driven Wind Turbine Systems (MW급 직접구동형 풍력터빈시스템을 위한 영구자석 동기발전기의 게인 스케쥴링 속도제어기에 대한 연구)

  • Choi, Young-Sik;Yu, Dong-Young;Choi, Han-Ho;Jung, Jin-Woo
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.25 no.8
    • /
    • pp.48-59
    • /
    • 2011
  • This paper presents a new gain scheduling speed controller of permanent magnet synchronous generators(PMSG) for MW-class direct-driven wind turbine systems. The proposed gain scheduling speed controller performs the speed tracking at more than one operating point, and the first-order torque observer estimates the turbine torque which is needed to precisely control the speed of PMSG. The proposed speed controller verifies that the PMSG can successfully follow the reference speed which is determined via the maximum power point tracking(MPPT) control and pitch control under turbulent wind conditions. The proposed speed control algorithm is simulated using Simulink and its performance is confirmed through comparison with the results by PI control method.

Performance Verification of the Modified Gain Scheduling Controller by Speed Control of a DC Motor (DC 모터 제어를 통한 개선된 게인 스케줄링 제어기의 성능 검증)

  • Cheon, Min-Kyu;Park, Mig-Non;Hyun, Chang-Ho;Lee, Hee-Jin
    • Proceedings of the KIEE Conference
    • /
    • 2006.10c
    • /
    • pp.312-314
    • /
    • 2006
  • This paper describes performance of the modified gain scheduling controller by speed control of a DC motor. The modified gain scheduling controller can perform tracking at more than one equilibrium points. The modified gain scheduling controller which considers transient response according to added zero shows better result of tracking performance than the unmodified gain scheduling controller shows.

  • PDF

An Effect of Pitch Gain-Scheduling on Shaft Vibration Response of Wind Turbine (풍력터빈 축 진동 응답에 대한 피치 게인-스케쥴링의 효과)

  • Lim, Chae-Wook;Jo, Jun-Chul
    • The KSFM Journal of Fluid Machinery
    • /
    • v.15 no.2
    • /
    • pp.36-40
    • /
    • 2012
  • Pitch control of wind turbine is activated above rated wind speed for the purpose of rated power regulation. When we design pitch controller, its gain-scheduling is essential due to nonlinear characteristics of aerodynamic torque. In this study, 2-mass model including a vibration mode of drive-train for a 2 MW wind turbine is considered and pitch control with gain-scheduling using a linearization analysis of the nonlinear aerodynamic torque is applied. Some simulation results for the pitch gain-scheduling under step wind speed are presented and investigated. It is shown that gain-scheduling in pitch control is important especially in the region of high wind speeds when there exists a vibration mode of drive-train.

A Packet Scheduling Algorithm for High-speed Portable Internet System (휴대 인터넷 시스템에서의 패킷 스케줄링 알고리즘 연구)

  • Choi, Seong-Hoon
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.30 no.1
    • /
    • pp.59-65
    • /
    • 2007
  • HPI (High-speed Portable Internet) system which provides high speed internet services is going to be commercialized soon. Since HPI provides simultaneously four different service types such as UGS (Unsolicited Grant Service), rtPS (real time Polling Service), nrtPS(non-real time Polling Service), and BE (Best Effort) under different QoS (Quality of Service) requirements and limited wireless channel resources, efficient packet scheduling mechanisms are necessary to increase the utilization of channels as well as to satisfy the various QoS requirements. This study regards the traffic data to be served as time series and proposes a new packet scheduling algorithm based on the nonparametric statistical test. The performance of the newly proposed algorithm is evaluated through the simulation analysis using a simulator that can evaluate the performance of packet scheduling mechanisms under various values of system parameters and measures such as packet delay time, data transmission rate, number of loss packets, and channel utilization.

Based on the Demand, A Scheduling Method for the Seoul-Busan High Speed Rail (수요기반의 경부고속철도 열차운행계획 수립기법에 관한 연구)

  • Park, Jin-Yong;Chang, Justin S.
    • Proceedings of the KSR Conference
    • /
    • 2010.06a
    • /
    • pp.380-388
    • /
    • 2010
  • This paper explored an effective scheduling method for the Seoul-Busan High Speed Rail. It is important to decide train frequency influencing on scheduling method. Main factors to decide train frequency are location of station, social economic index, land use of station area and travel demand. In this paper, we focused on travel demand which is critical factor to decide train frequency. And we studied on standardized scheduling method. Simulation method is used to analyze the performance of explored method.

  • PDF

A Study on Track Maintenance Scheduling of High-Speed Railway (고속철도 궤도유지보수 일정계획에 관한 연구)

  • Kim, Ki-Dong;Lee, Joo-Hwan
    • Journal of Industrial Technology
    • /
    • v.28 no.A
    • /
    • pp.43-49
    • /
    • 2008
  • The track of high-speed railway get deteriorated according as using it. In that case, the maintenance jobs are needed for improvement of track quality. A scheduling problem for the track maintenance of high-speed railway is to determine the jobs should be performed daily. In the problem, the set of jobs for maintenance is given. Each job has it's parameters such as due date, emergency level, and processing time. In addition, jobs can be worked during a certain fixed time when the train doesn't move. In this study, we developed a mathematical model of the scheduling problem for the maintenance of high-speed railway and solved the problem using the ILOG CPLEX library.

  • PDF

Speed Control of Marine Diesel Engines Using Fuzzy Gain Scheduling (퍼지 게인 스케줄링을 이용한 선박 디젤기관의 속도 제어)

  • 박승수;이현식;김도응;진강규
    • Journal of Advanced Marine Engineering and Technology
    • /
    • v.26 no.6
    • /
    • pp.638-645
    • /
    • 2002
  • This paper presents a scheme for integrating PID control, gain scheduling and emerging techniques in the field of artificial intelligence, such as fuzzy logic and genetic algorithms for the speed control of a marine diesel engine. At first, local PID controllers are designed based on a local model obtained at each speed mode, whose parameters are optimally tuned using a real-coded genetic algorithm. Then, fuzzy "if-then" rules combine the local controllers as a consequence part to implement fuzzy gain scheduling. To demonstrate the performance of the proposed fuzzy PID controller on overall operating conditions, a set of simulation works on B'||'&'||'W's 4L80MC diesel engine are carried out.t.