• Title/Summary/Keyword: Specification Plan

Search Result 151, Processing Time 0.033 seconds

Test Plan for Anti-Jamming System Performance Evaluation

  • Park, Ji-Hee;Kwon, Seung Bok;Shin, Dong-Ho
    • Journal of Positioning, Navigation, and Timing
    • /
    • v.4 no.1
    • /
    • pp.17-23
    • /
    • 2015
  • With the increase in the risk of GPS jamming, the development and application of anti-jamming GPS techniques have been actively performed. As the objective performance verification of developed techniques is important, equipment development for verification and discussion on anti-jamming performance test method and procedure have also been conducted. However, most tests are related to the specification of equipment and therefore detailed procedure of the performance verification of an anti-jamming system needs to be developed. In this study, requirements for anti-jamming performance verification were described, and test configurations and performance evaluation items depending on three kinds of test methods (lab test, basic outdoor test, and chamber test) were suggested for anti-jamming performance verification.

The Construction and Application Plan of Seismic Data Processing System (탄성파 자료처리 시스템 구축 및 활용 방안)

  • Kwak, Joon-Young;Seul, Chang-Hyun;Ko, Seung-Won;Jeon, Jae-Ho;Seo, Young-Tak
    • 한국지구물리탐사학회:학술대회논문집
    • /
    • 2009.05a
    • /
    • pp.67-71
    • /
    • 2009
  • The high resolution seismic data processing essentially requires the latest data processing technology with a system which enables to calculate the large volume of input/output and computing of data. Nowadays, there is a high foreign dependency on the data processing and QC. In this research, The test processing had been carried out to deduce the best suited software by evaluating functionality, usability and user environment. And several attempts are made to select the most appropriated specification of hardware in order to maximize the software efficiency. The results showed that more numbers of multiple and noise were eliminated in existing prestack time migration sections, which effectively enhanced the resolution.

  • PDF

스테인레스 전기로 최적 원료장입 모델

  • 홍유신;박기진;오성수
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 1990.04a
    • /
    • pp.100-110
    • /
    • 1990
  • An optimal raw mix model in stainless steel making is developed. The key raw materials in stainless steel making are stainless steel scrap, steel scrap, and alloy materials like Fe-Ni, Fe-Cr. Among those raw materials, the alloy metals are very expensive as well as rapidly price-changing items. Consequently, it is very important to develop an minimal cost raw mix scheme while the produced stainless steel satisfies the required specification in it's composition. The linear programming model is employed to determine the minimal cost raw mix scheme. Compared with the method being used, the developed linear programming model gives much faster and better solution (lower cost raw mix plan). Together with the linear programming model, the database is also developed, which includes the following: 1) data for raw materials, such as compositions, costs, densities, available inventory levels, and so on, 2) the required specifications process. The developed optimal raw mix model will be implemented in VAX computer.

  • PDF

Development and Usability Evaluation of Fixed-base AHS Simulator

  • Cha, Doo-Won;Park, Peom
    • Proceedings of the Korean Society for Emotion and Sensibility Conference
    • /
    • 2002.05a
    • /
    • pp.57-62
    • /
    • 2002
  • This study described the specification and configuration of developed fixed-base AHS (Automated Highway System) simulator fur the human factors researches, and its usability evaluation results after riding 120, 140, and 160kph automated driving speed. As the results, this study suggested the subjects' preferences and opinions about simulator and AHS configurations that would help to establish the AHS R&D plan and driver-vehicle/road interface design guidelines as the basic researches of the AHS human factors.

  • PDF

Present Situation and Prospects for the Solid State Meter Considering Electricity Tariff Policy (전자식전력량계의 도입현황과 요금구조의 장기방향을 고려한 발전전망)

  • Kwon, O-Hyung;Kim, Jae-Sung;Jo, Jin-Sub
    • Proceedings of the KIEE Conference
    • /
    • 1998.07b
    • /
    • pp.760-762
    • /
    • 1998
  • Due to the reinforcement of government's DSM(Demand Side Management) policy. Solid State Meter was introduced in Korea since 1993 and it is applied to the high voltage customer exceeding 100kW in order to equalize daily load curve. In recent days, KEPCO has a Plan to use the Solid State Meter which has a data recording and remote meter-reading function for low voltage customer to introduce the real-time pricing system and reduce peak power in the near future. So, this paper suggests the specification and function of Solid State Meter.

  • PDF

System requirement verification process and facilitating template (시스템 요구사항 검증 절차 및 수행 템플릿)

  • Jang, Jae Deuck;Lee, Jae Chon
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.2 no.2
    • /
    • pp.33-38
    • /
    • 2006
  • It is well known that efficient management and thorough implementation of stakeholder requirements is vital for a successful development of a large-scale and complex system. Equally important is to make sure that all the requirements be correctly realized in the developed system. For the purpose, verification requirements are derived with traceability from the system requirements. This paper discusses a step by step process for constructing the requirements verification model which includes : 1) the schema modeling both requirements and their traceability; 2) the template documenting the verification requirements; 3) the verification model constructed from the schema; and 4) the test and evaluation plan that can be printed automatically.

  • PDF

Develoment of Railroad Geotechnical Information Database (철도 지반정보 자료의 표준화 DB 개발)

  • Kim Jung-Moo;Kim Hyun-Ki;Lee Seong-Hyeok;Hwang Seon-Keun
    • Proceedings of the KSR Conference
    • /
    • 2003.05a
    • /
    • pp.388-392
    • /
    • 2003
  • In this study, various railroad geotechnical informations were standardized. The standardization was progressed by classifying the informations as basic properties, railroad vibrations and design plans. Basic informations included soil properties(27), dynamic property(1), geophysical prospecting(1), and elastic wave prospecting(4). Specification for 'human exposure to whole-body vibration' was used to construct the information of railroad vibration. And in the case of the information of design plan, the way to save by graphic files was chosen. Thus standardized informations examined their application by setting up database. Entity-Relation(E-R) model was used in the design of database and by this, the database system was constructed. This database system will be able to serve the performance enhancement of railroad system.

  • PDF

Determination of the Optimal Specification Limits for Complete Inspection Plans (전수검사를 위한 최적규격한계 설정)

  • Hong, Sung-Hoon;Kim, Sang-Boo
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.21 no.2
    • /
    • pp.255-265
    • /
    • 1995
  • Due to advances in automated manufacturing systems and automatic inspection equipment, complete inspection has drown increased attention recently and has become a widespread practice. In a complete inspection plan all of the items are subject to acceptance inspection If an item fails to meet the predetermined specifications, it is rejected. In this paper, economic complete inspection plans are developed in situations where rejected items are reworked Complete inspections based on the performance variable of interest or a variable which is correlated with the performance variable are considered. Cost models are constructed which involve cost incurred by imperfect quality rework cast and quality inspection cost Methods of finding the optimal complete inspection plans are presented and numerical examples are given.

  • PDF

The Status of Power Plant Simulation Technology and KEPCO's Plan for Self-Reliance of the Technology (발전소 시뮬레이터 기술동향 및 국내 기술자립 계획)

  • Shin, Yeong-Cheol;Lee, Yong-Kwan
    • Proceedings of the KIEE Conference
    • /
    • 1993.07a
    • /
    • pp.525-528
    • /
    • 1993
  • KEPCO Research Center is carrying out a simulator(full scope replica type) development project for two nuclear power plants(Kori-2, Younggwang-3,4) and one fossil power plant(Poryong-3,4). In this project, we aim not only the installation of high performance simulators at the power plant sites but also the realization of self reliance of power plant simulation technology in Korea. In the course of preparing procurement specification for the 3 simulators, the present status of power plant simulation technology has been surveyed and is presented in this paper. The fidelity of simulation and the automation of simulation model production has been greatly improved due to the ever increasing computing power of today's workstations. The need and importance of the application of high fidelity simulators to the operator training is refocused since the accident at TMI Nuclear Power Plant, U.S.A.

  • PDF

Automatic document generation for effective project management plan specification (효과적인 프로젝트 관리 계획서위한 프로젝트 문서 생성 자동화)

  • Kang, Geon-Hee;Son, Hyun Seung;Yi, Geun Sang;Kim, R. Young Chul;Lee, Sang Eun
    • Proceedings of the Korea Information Processing Society Conference
    • /
    • 2015.10a
    • /
    • pp.959-961
    • /
    • 2015
  • 현재 많은 소프트웨어 개발 기업들은 제품 개발에만 치중되어 품질 유지/관리 측면의 문서 산출물을 만들 여유가 없다. 그리고 프로젝트 문서 관리 자체가 주먹구구식이며, 차후 평가나 검수시 문서 산출물을 만드는 경향이 있다. 이 문제 해결위해, 실시간으로 프로젝트가 진행되는 상황에 맞게 문서를 자동 생성하는 방법을 제안한다. 이 방법은 기존의 통합관리(CI) 시스템에 XML과 XSLT 기법을 접목하여 프로젝트 계획 문서를 자동 추출가능하다. 이로 인해 소규모의 영업장에서도 적은 인원으로도 프로젝트 관리를 효율적으로 할 수 있고, 실제 문서와 프로젝트의 진행의 불일치가 많이 줄어들 것으로 판단된다.