• Title/Summary/Keyword: Specialty contractors

Search Result 37, Processing Time 0.027 seconds

Prediction Survey on Construction Guarantee Market Due to the Restructuring of the Construction Industry's Production System (건설산업 생산체계 개편에 따른 건설보증시장 변화 예측 조사)

  • Kim, Sungil;Chang, Chulki;Yoo, Hyunji
    • Korean Journal of Construction Engineering and Management
    • /
    • v.22 no.1
    • /
    • pp.63-71
    • /
    • 2021
  • The construction guarantee market is a rear market affected by changes in the construction industry and market. As the restructuring of the construction industry's production system is being carried out, such as the abolition of regulations on business field between general and specialty contractors, major changes are expected not only in the construction market but also in the construction guarantee market. In construction guarantee market, there are currently three Contractor Financial Cooperatives, which are divided based on business field and business type(General, Specialty and Plant & Mechanical). The abolition of business field regulation will have various effects on construction guarantee market, such as forming a competitive structure among the three Contractor Financial Cooperatives. Therefore the role of the construction guarantee institutions are also required to change. This study predicted the changes in the construction guarantee market after the restructuring of construction industry and analyzed the ripple effect on the market. This study reviewed the details of the reorganization plan on the construction industry, policies and statistical data related to construction guarantee, and lastly conducted the survey on each member of the three Contractor Financial Cooperatives to analyze the usage behavior in the future guarantee market. Based on the result of this study, the members of both the General Contractor Financial Cooperative and Specialty Contractor Financial Cooperative are not willing to change the existing institutions, but a lot of them are expected to use other institutions in duplicate. The members of the Plant & Mechanical Contractor Financial Cooperative are most willing to use other guarantee institutions.

An Experimental Study on the Collapse Phase of a River Leeve(I) -Effects of the Geometric Characteristics of Cross Section (하천제방 붕괴 양상의 실험적 연구(I) - 단면의 기하학적 특성치의 영향)

  • Lee, Sang-Tae;Lee, Jong-Tae
    • Journal of Korea Water Resources Association
    • /
    • v.34 no.2
    • /
    • pp.141-154
    • /
    • 2001
  • An experimental study was performed to investigate the effects of levee crest width and the slope steepness on levee break due to overtopping flow. The phenomenon of bank failure can be described in 4 stages. In this study, the magnitudes of breach width, breach depth peak discharge, and scouring shape at the break site were measured, and the result shows that peak discharge will be reduced and breach duration extended by widening the crown width and lessening the levee slope steepness. The breach width was narrower and the breach depth deeper, as the levee crest width become wider or the slope steeper. And, the bed scour depth was deeper and steeper, as the levee crest crest width become narrower or the slope milder.

  • PDF

A Study on Substantiation Methodology for Extension of Time in International Mega-Project Claims (해외 대형건설공사 공기지연클레임의 공기연장기간 입증방법)

  • Kim, Young-jae;Kim, Tae-kyoung;Jo, Duk-sang;Lee, Hwang-ku
    • Korean Journal of Construction Engineering and Management
    • /
    • v.16 no.3
    • /
    • pp.165-176
    • /
    • 2015
  • Recently many Korean large-sized construction companies as well as specialty contractors have been expanding their business in the overseas market to mitigate impacts from long-term stagnation in the domestic market. Such as a result, it has been arisen as a major issue that contractors effectively manage the delays which have been commonly faced with in international mega-projects. Therefore it can be said that the ability of the delays management leads a success of project. This paper presents a review of literature for delay analysis methods such as time impact analysis(TIA) and raises practical problems to rationally substantiate the duration of extension of time(EoT) in international mega projects which have wide scope of works as well as complicated and detailed contract baseline programs by taking theoretical approaches. We suggest the two improvement concepts to substantiate the EoT claims which are effectively applicable to practical projects. The first is to sort out dominant delays among numerous delays in advance of applying a delay analysis. The second is to set up the delay sections with the advanced concept for analysing delays' effects by TIA. This study performed a case study on an actual international mega-project. to confirm the effectiveness of improvement concepts that this practical approach is applicable for the assessment of EoT. In conclusion, this paper supposes to provide practitioner in charge for an EoT claim with an advanced substantiation methodogy when they not only analyse the construction delays by using TIA, but also negotiate with stakeholders about with the assessment of EoT.

Analysis on Construction Clients' Role for Safety and Health Management in Plan, Design, and Construction Stage (건설공사 발주자의 계획, 설계, 공사단계 안전보건관리 역할 분석)

  • Lim, Se Jong;Jeong, Seong-choon;Na, Ye Ji;Won, Jeong-Hun
    • Journal of the Korean Society of Safety
    • /
    • v.35 no.3
    • /
    • pp.24-31
    • /
    • 2020
  • The duty of construction clients in WSH (Workplace Safety and Health) system was included in the amendment of Occupational Safety and Health Act (enforced on 16 January 2020), which was estimated the shift of paradigm in the prevention of construction accidents. The purpose of this paper is to introduce the analysis results of construction clients' role in the construction project, which were performed by authors over the recent years in order to impose the duty on construction clients, and to suggest their role according the plan, design, and construction stage. Utilizing the systematic literature review process based on Meta analysis, the related papers were selected. For the selected papers, related domestic and foreign regulations, and other prominent report, the construction clients' role was analyzed by reflecting the experts' advice. Results show that the construction clients should control the designer and contractor for implementing the WHS system during the whole process of the construction project. They should supply sufficient source and time to ensure the workers' safety. In the plan stage, the key role of construction clients is to identify intensively controlled hazard and risk reduction plan and to transfer the results. In the design stage, their key role is to select the designer with the capacity in WSH and to assist the designer for the safety design. The main key role of construction clients in the costruction stage is to select the contractor with specialty in WSH including a contract reflecting the WSH requirement and to check implementation of WSH plan, WSH cost, WSH education, and accident report. In addition, it is thought that the construction clients' participations in the site WSH activity and adjustment of safety and health problem among contractors can be effect in the prevention of construction accidents.

Benchmarking of Strategic Performance of Global Top Construction Firms (사업구조 전략 분석을 통한 세계 선진기업 선정 및 특성분석)

  • Woo, Jung-Suk;Jang, Hyoun-Seung;Choi, Seok-In;Park, Chan-Sik
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.3
    • /
    • pp.122-129
    • /
    • 2009
  • Strategic planning is an essential function of senior management in any business firm. Planning involves the firm's behavior in an competitive market and adaptation of the company's resources towards the selected market strategy. This study presents a methodological procedure for strategic planning in global top-tier construction firms. This procedure consists of the following stages. First, analyzed growth of revenue in which weight of total construction firms' revenue shown in Global Top 225 Contractors(ENR). Second, analyzed specialty of construction products. The products are General Building, Power, Water Supply, Industrial/Petroleum Process, and Transportation. Third, analyzed business the portfolio plan. The business portfolio plan includes both local/overseas market and specification/diversification of construction products. It affects the subsequent choice of a benchmarking for development of each construction company. The choice of the benchmarking firm, among several available alternatives, should follow a careful analysis of the characteristics and benefits inherent in the implementation of each.

Analysis of the Procurement Management Process for the Gas & Oil Plant projects (Gas & Oil 플랜트 조달관리 프로세스 분석)

  • Won, Seo-Kyung;Kang, Min-Woo;Lee, Jun-Bok;Kim, Sun-Kuk;Han, Choong-Hee
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.491-494
    • /
    • 2007
  • Recently Gas & Oil plant construction projects are increasing in the world. The EPC (Engineering, Procurement and Construction) company, which participate in the plant projects, should possess the pertinent engineering license and procurement skill to create high added-value. It is because the procurement is very substantial to cover 70% of the total project cost. Nonetheless, there exist various risks involved in the procurement process due to the characteristics of the construction projects with long duration and complicated process as well as the procured goods or services subjected to various logistics. The objective of this paper is to analyze proper process in the procurement and to identify various information and document. Also to analyze procurement process, the principal data are derived from the interview with experts and specialty contractors of plant project. The result of this study would widely be used as a guide to the procurement personnel in forecasting the risks in advance.

  • PDF

Time Series Analysis and Forecast for Labor Cost of Actual Cost Data (시계열분석을 통한 실적공사비의 노무비 분석 및 예측에 관한 연구)

  • Lee, Hyun-Seok;Lee, Eun-Young;Kim, Yea-Sang
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.4
    • /
    • pp.24-34
    • /
    • 2013
  • Since 2004, the government decided to gradually introduce Actual Cost Data into cost estimate for improving problems of below-cost tendering and to reflect fair market price through competition and carry contract efficiently. However, there are many concerns that Actual Cost Data has not reflected real market price, even that has contributed to reduce the government's budget. General construction firm's burden for labor cost is imputed to specialty contractors and eventually it becomes construction worker's burden. Therefore, realization of Actual Cost Data is very important factor to settle this system. To understand realization level and make short term forecast, this paper drew construction group of which labor cost constitutes more than 95% of direct cost, and compares their Actual Cost Data with relevant skilled workers's unit wage and predicts using time series analysis. The bid price which is not be reflected market price accelerates work environment changes and leads to directly affect such as late disbursement of wages, bankruptcy to workers. Therefore this paper is expected to be used to the preliminary data for solving the problem and establishing improvement of Actual Cost Data.