• Title/Summary/Keyword: Special contractor

Search Result 16, Processing Time 0.025 seconds

An Empirical Study on the Openness and Competition of Special Contractors Market in Korea (전문건설 시장의 개방성과 경쟁성에 관한 실증적 분석)

  • Lee, Jong-Gwang;Hong, Sung-Ho;Kim, Yong-Su
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.431-434
    • /
    • 2006
  • The purpose of this study is to examine the degree of openness and competition in special contractor's market. And the result of this study will present the basis of rational policy making. The literature research and time series analysis are adopted as research method. And the findings of this study are as followed. The study has shown that the degree of openness is high in korean special contractor's market by gradual deregulation of entrance barriers into special contractor's market. And the study has revealed that the degree of competition in special contractor's market is high, revealing that the rate of increase of contract account and the subcontract bid rate have decreased.

  • PDF

A Study on Direction of Regulation Policies by Classification of Government Regulation in Construction Industry;Focus on Subcontract or Specialty Contractor (정부규제의 유형분석을 통한 규제정책의 접근방법 연구;하도급 및 전문건설업을 중심으로)

  • Lee, Jong-Gwang;Jo, Sung-Yeon;Kim, Yong-Su
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.440-443
    • /
    • 2006
  • The purpose of this study is to classify government regulations and to present the direction of regulation policy in korean construction industry with focus on subcontract or special contractor. The literature research and type analysis are adopted as research method. And the results of this study are as followed. The study has shown the type of government regulations related with subcontract or specialty contractor in korean construction industry. Also, Having shown the institutional function of the regulations in the market. And the study has presented the approach to reform government regulations in construction industry. First, government must recognize not only economic efficiency but also social equity as equivalent policy values. Second, government must evaluate the benefit and cost of policy group as regulations have changed. Third, government must analysis the functions and effects of regulation reform in comparison with existing regulation.

  • PDF

A Basic Study on the Maritime Performing Party System and the Difference between the Maritime System and China's system

  • Liu, Xiaoxian;Noh, Chang-Kyun
    • Journal of Navigation and Port Research
    • /
    • v.36 no.4
    • /
    • pp.299-303
    • /
    • 2012
  • "United Nations Convention on Contracts for the International Carriage of Goods Wholly or Partly by Sea" was passed in July 3, 2008. on September 23, 2009 signing ceremony was held in Rotterdam. The system of maritime performing party is a special system in the transport convention, and constitutes an integral part of the Convention. Maritime performing party system is not the first system which brings in the carrier's independent contractor, but it is the most comprehensive and thorough one. It unified the duty of carrier's independent contractor in the maritime segment, and it is also an important progress in the developing process of international maritime legal system. There are some differences between the maritime performing party and China's current related system, i.e, the port maritime performing party and the intermediate performing party are included in the maritime performing party, and they can enjoy the carrier's exception clause and limitation of liability.

A Experimental Study on the Field Application of Concrete with $CO_2$ Reduction Materials (탄소 저감형 재료를 활용한 콘크리트의 현장 적용성에 관한 실험적 연구)

  • Jeon, Chanki;Jeon, Joongkyu
    • Journal of the Society of Disaster Information
    • /
    • v.9 no.2
    • /
    • pp.128-136
    • /
    • 2013
  • The current contractor for use in performance compared to the performance study of industrial byproducts. Due to the stagnation of the construction business and the rise of raw materials, the contractor of the cost savings and environmental issues, and present a variety of ways for research actively being. Through special about the compressive strength characteristics of the mixed concrete, carbonation resistance and chloride penetration resistance of this study, previous studies have been a lot of progress, industrial byproducts, fly ash and blast furnace slag concrete structures were applied to evaluate.

Steel Plant Construction (EPC) Project Case Study : Forensic Lessons-learned Analysis and Systems Engineering Improvement Recommendation

  • Kyung-Bae Jin;Young-Ho Kim;Eul-Bum Lee;Suk-Hwan Seo
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.145-150
    • /
    • 2013
  • As a recent global trend, the majority of mega-size plant projects are delivered through EPC (Engineering, Procurement and Construction) contracts, where a single contract is awarded for engineering, procurement, and construction. Under this contracting mechanism, it is challenging for contractors to carry out the projects under traditional project management processes used in design-bid-build projects. A new EPC Plant, the POSCO Special Steel Plant in Changwon, was built successfully at the beginning of 2012 and it is currently in full-scale production. The project has encountered a number of major difficulties however, with some technical and managerial issues through its development process. As summarized in this paper, the authors (as project participants with the contractor) investigated it as a post construction analysis and recorded the Lessons-learned for future project management improvement.

  • PDF

Improvement of Procedures on Design Deliberation System for Turnkey and Alternative-Design Contracts (턴키.대안입찰 설계심의 및 평가제도의 개선방안)

  • Park, Hong-Tae;Lee, Yang-Kyoo
    • Journal of the Korean Society for Railway
    • /
    • v.14 no.1
    • /
    • pp.31-38
    • /
    • 2011
  • Turnkey and alternative-design contracts was introduced operation in the country from january 2004 to February 2010. this was introduced operation. The selecting method of contractor for turnkey projects has being operated by an open forum type that consists of technical committee and appraisal committee in an integrated design approach deliberations. But to improve the operation of the problems, the government is operating design review committee consisting of the central, local and special design advisory committee in march 2010. But this system has also been suggested as still problems, too many contracts by large companies, increasing of design cost and excessive competition. This study is intended to contribute that turnkey and alternative-design contracts can be well operated in domestic construction markets. In this paper suggests some improvement methods and operational problems caused from application of an open forum type for selecting contractor of turnkey project.

Performance Prediction Model for Public-Private Partnership Projects Considering Stakeholders' Profitability (참여자별 수익성을 고려한 민간투자사업 성과예측 모델)

  • Yeo, Dong Hoon;Yu, Giwon;Lee, Kang-Wook;Han, Seung-Heon
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.35 no.2
    • /
    • pp.471-480
    • /
    • 2015
  • The market of public-private partnership (PPP) projects has reduced from 9.4 trillion won in 2007 to 4.5 trillion won in 2012. However, the need of PPP projects is brought up by a massive down scale of government financial business. Previous studies regarding PPP projects mostly evaluate profitability from the financial perspective or analyze risk factors as a whole. Although PPP projects generally have complex structure involving diverse stakeholders, such as contractor, financial investor, and special purpose company (SPC) operators, existing studies have rarely considered the different viewpoints of PPP project stakeholders. Therefore, purpose of this study is to develop a structural equation model (SEM) considering the diverse stakeholders of PPP projects. To this end, the authors first reviewed the organizational structure of PPP projects. Next, the identification of the factors affecting project profitability are done via comprehensive literature reviews. After that, we conducted in-depth interviews and questionnaire surveys to reflect stakeholders' perspectives (contractors, financial investors, and SPC operators). As a result, a SEM model is developed to analyze direct and indirect effect on the PPP project performances. Finally, using the analysis results, relevant implications and directions for improvements are discussed. The prediction of the business performance of contractor, financial investor, and SPC operator is expect to be possible through the model developed and supports the strategy deduction that is appropriate for the participants.

Modification of Public-Private Partnership in Japan

  • Kaneta, Takashi
    • International conference on construction engineering and project management
    • /
    • 2017.10a
    • /
    • pp.153-158
    • /
    • 2017
  • Procurement system of public construction projects in Japan is changing with diversity in rapid pace. The quality assurance and risk management of construction projects should be more certain as the projects are turning into larger scale and more complexed. The clients in the public sector will want to make the relation of responsibility among the client, the designer (architects and engineers), and contractor clearer in terms of role and risk. Public-Private Partnership (PPP) is one of the methods for collaboration of the public sector and the private sector in public construction projects where the public utilizes the ability and suggestion of the private. Private Finance Initiative (PFI), Design-Build-Operate (DBO), market testing, designated manager system, outsourcing of tasks in local governments are well-known as examples of PPP in Japan. Indeed, there is an obvious trend that Design-Build (DB) is adopted in public construction projects in many countries including Japan. In this paper, the public construction projects in various procurement systems are surveyed and analyzed. They are not limited within the traditional procurement, Design-bid-Build, a separate order system of design and construction. Design-Build or PFI are adopted. In particular, contract by wide range including maintenance of equipment can be found. On the other hand, modification from originally typical PFI is taking place, such as concept design and project finance are removed from the roles and the tasks of the special purpose company (SPC) in PFI. Standard roles and tasks in a construction project are modeled in this paper.

  • PDF

A Study on Improving Performance Bond System for Efficient Execution of Public Construction Works (효율적인 공사수행을 위한 공사이행보증제도 개선방안 연구)

  • Kim, Myeongsoo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.21 no.4
    • /
    • pp.21-29
    • /
    • 2020
  • This study analyzed problems of operating performance bond for public works and derived some suggestions for improvement. The Contract Law for Government Owner requires to submit performance bond which guarantees performing the construction contractor pays back compensation money when the obligation is not executed. Currently, first bid eligibility for participation is exactly required for executing company of performance bond obligation, not considering volume, technical level, and special type of remaining works. In collaboration contract, if guarantee accident occurs, it is obliged for remaining collaboration contractors to be qualified to fulfill the whole contract. This study proposes following improvement plan to solve problems of current performance bone in public works. Firstly, qualification criteria must be deregulated exceptionally for selecting proper contractor, which executing performance bond obligation, considering progress and characteristics of remaining works. Secondly, In collaboration contract, the prerequisite of remaining contractors' should be deregulated as 'implementation requirement of the remaining works'from'implementation requirement of the whole work'. Finally, defect responsibility should be included in liabilities of performance bond by specifying that owner or guarantee agency bear them.

A Study on the Assessment of Standard Wage System for Forestry Workers in Korea (임업기능인 임금조사를 통한 직종별 기준임금 산정에 관한 연구)

  • Han, Sang-Kyun;Han, Han-Sup;Woo, Hee-Sung;Choi, Byoung-Koo;Cho, Min-Jae;Cha, Du-Song
    • Journal of Korean Society of Forest Science
    • /
    • v.104 no.4
    • /
    • pp.632-639
    • /
    • 2015
  • Working in the forest would require a wide range of skills and experience for specific tasks which involve with a high level of risks to worker's safety. However, there has been a concern on the current standard wage system for forest workers because it does not effectively reflect the characteristics of typical working conditions in the forest. In addition, the current standard wages for forestry workers was estimated based on the construction industry's wage system. Therefore, the purpose of this study is to assess a current wage system through the mail survey method and to develop a new wage system for forest worker which effectively reflects skill sets and experience required for successful completion of the work in the forest. We mailed the survey questionnaire consisting of 19 questions to 659 forest workers and received 188 responses resulting in a 28.5% response rate. The results showed that the current average optimal wages of forest worker, special worker and feller were 97,680won/day, 127,559won/day and 152,403won/day, respectively though there were variations depending on the regions. In developing the new standard wage system, this study suggest the current work types(worker, special worker and feller) could be divided into 5 work types (forest-environment workers, forest operations in beginner, forest operations in intermediate, forest operations in advanced and forest equipment operator) reflecting specialty of forest operation thereby stabilizing the new wage system for forest workers.