• Title/Summary/Keyword: Sources of Electricity

Search Result 270, Processing Time 0.029 seconds

Preliminary Cost Estimates for Nuclear Hydrogen System Based on High Temperature Electrolysis (고온전기분해 이용 원자력수소 예비타당성 연구)

  • Yang, Kyeongjin;Lee, Taehoon;Lee, Kiyoung
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 2010.06a
    • /
    • pp.228.2-228.2
    • /
    • 2010
  • In this work, the hydrogen production costs of the nuclear energy sources are estimated in the necessary input data on a Korean specific basis. G4-ECONS was appropriately modified to calculate the cost for hydrogen production of HTE process with Very High Temperature nuclear Reactor (VHTR) as a thermal energy source rather than the LUEC (Levelized Unit Electricity Cost). The general ground rules and assumptions follow G4-ECONS. Through a preliminary study of cost estimates, we wished to evaluate the economic potential for hydrogen produced from nuclear energy, and, in addition, to promptly estimate the hydrogen production costs for an updated input data for capital costs. The estimated costs presented in this paper show that hydrogen production by the VHTR could be competitive with current techniques of hydrogen production from fossil fuels if $CO_2$ capture and sequestration is required. Nuclear production of hydrogen would allow large-scale production of hydrogen at economic prices while avoiding the release of $CO_2$. Nuclear production of hydrogen could thus become the enabling technology for the hydrogen economy. The major factors that would affect the cost of hydrogen were also discussed.

  • PDF

Construction Of Uninterruptible Power System by Reliable Incoming Power Method (신뢰도 높은 수전방식에 의한 무(無)정전 전원설비 구축방안)

  • Choi, Jin-Sung;Lee, Sang-Joong
    • Proceedings of the Korean Institute of IIIuminating and Electrical Installation Engineers Conference
    • /
    • 2007.11a
    • /
    • pp.367-371
    • /
    • 2007
  • Large capacity UPS and emergency generators are being installed and operated at the specific target of important electric facilities that need uninterruptible power supply by the method of countermeasure against power failure for the less reliable incoming power method. Recently, CTTS (Closed Transition Transfer Switch) is being used as uninterruptible power transfer switch at the Common sources of electricity, generator and multiple generators. In this paper, construction plans for uninterruptible power supply system has been suggested in which CTTS has been applied to the secondary of incoming power generator for reliable common dual system method. By briefing the construction of incoming power facilities, large capacity UPS, emergency generator installation space and investment saving effects can be achieved.

  • PDF

Private sector engagement in large scale solar power deployment in Sri Lanka: Role of green climate fund

  • Liyanage, Namal
    • Bulletin of the Korea Photovoltaic Society
    • /
    • v.6 no.1
    • /
    • pp.21-34
    • /
    • 2020
  • Sri Lanka has strongly understood the importance of mitigation of climate change and various measures have been taken. To tackle the climate change, after ratifying Paris Agreement, Sri Lanka has pledged to reduce her greenhouse gas emission in the energy sector by 20% (16% unconditional and 4% conditional) by 2030 based on the BAU scenario. Simultaneously, the government introduced its new energy policy and strategies in 2019 with a vision of achieving carbon neutrality by 2050. This paper survey related key government documents, policies, reports, and academic articles to investigate opportunities for the private sector to invest large scale solar power deployment (10 MW or above) and to get support from climate finance under article 6 of the Paris Agreement. It has found, growing concern on the environment, energy security issues and increase import expenses for fossil fuels are the main influencing factors to move renewable sources. Further, government investment and FDI both have gradually decreased in the energy sector. Therefore, an alternative financing mechanism is needed. Although the private sector allowed investing in the energy sector since 1996 with the introduction of IPP (Independent Power Producers), it could not make considerable progress on involving large scale solar utility projects. This has revealed government policy is not aligning with the long term generation plan of the electricity sector. The study has also found, it needs more strategic road map, coordination with different institutions, monitoring system to enhance large scale solar contribution.

A Feasibility Study on Geothermal Power Plant in Korea (한국형 지열발전 타당성 연구)

  • Lim, Hyo-Jae;Kwon, Jung-Tae;Kim, Geum-Soo;Chang, Ki-Chang
    • Proceedings of the SAREK Conference
    • /
    • 2009.06a
    • /
    • pp.39-44
    • /
    • 2009
  • Geothermal energy is the heat contained in the earth and its internal fluids. Geothermal energy is stored as sensible or latent heat. Supplied by both internal and external sources, it represents a vast supply which is only started to be tapped for generation of electric power. In general, this is natural dry or wet medium to high enthalpy steam at temperatures above $150^{\circ}C$. For some time, binary systems employing substances with a lower boiling point than water in a secondary circuit have been used to generate vapor for driving turbines at a lower temperature level. The utilization of binary plants and the possibility of production from enhanced geothermal systems can expand its availability on a worldwide basis. The geothermal electricity installed capacity is approaching the 10,000GW threshold. Geothermal energy is not present everywhere, but its baseload capability is a very important factor for its success.

  • PDF

Study on Flow Characteristics in an Augmentation Channel of a Direct Drive Turbine for Wave Energy Conversion Using CFD

  • Prasad, Deepak;Kim, Chang-Goo;Choi, Young-Do;Lee, Young-Ho
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 2009.11a
    • /
    • pp.594-599
    • /
    • 2009
  • Recent developments such as concern over global warming, depletion of fossil fuels and increase in energy demands by the increasing world population has eventually lead to mass production of electricity using renewable sources. Apart from wind and solar, ocean holds tremendous amount of untapped energy in forms such as geothermal vents, tides and waves. The current study looks at generating power using waves and the focus is on the primary energy conversion (first stage conversion) of incoming waves for different models. Observation of flow characteristics and the velocity in the augmentation channel as well as the front guide nozzle are presented in the paper. A numerical wave tank was used to simulate the waves and after obtaining the desired wave properties; the augmentation channel plus the front guide nozzle and rear chamber were integrated to the numerical wave tank. The waves in the numerical wave tank were generated by a piston type wave maker which was located at the wave tank inlet. The inlet which was modeled as a plate wall moved sinusoidally with the general function, x=asin$\omega$t The augmentation channel consisted of a front nozzle, rear nozzle and an internal fluid region representing the turbine housing. The analysis was performed using the commercial CFD code ANSYS-CFX.

  • PDF

Broadband Piezoelectric Energy Harvesting Technology (광대역 압전 에너지 하베스팅 기술)

  • Lee, Dong-Gyu;Yee, Yeon-Jeong;Song, Hyun-Cheol
    • Ceramist
    • /
    • v.22 no.1
    • /
    • pp.56-69
    • /
    • 2019
  • Recent advances in low-power sensors and transmitters are driving the search for standalone power sources that utilize unused ambient energy. These energy harvesters can alleviate the issues related to the installation and maintenance of sensors. Particularly piezoelectric energy harvesters, with the ability to convert ambient mechanical energy into useful electricity, have received significant attention due to their high energy density, low cost and operational stability over wide temperature and pressure conditions. In order to maximize the generated electrical power, the natural frequency of the piezoelectric energy harvester should be matched with the dominant frequency of ambient vibrations. However, piezoelectric energy harvesters typically exhibit a narrow bandwidth, thus, it becomes difficult to operate near resonance under broadband ambient vibration conditions. Therefore, the resonating of energy harvesters is critical to generate maximum output power under ambient vibration conditions. For this, energy harvesters should have broadband natural frequency or actively tunable natural frequency with ambient vibrations. Here, we review the most plausible broadband energy harvesting techniques of the multi-resonance, nonlinearity, and self-resonance tuning. The operation mechanisms and recent representative studies of each technique are introduced and the advantages and disadvantages of each method are discussed. In addition, we look into the future research direction for the broadband energy harvester.

Geothermal Power Generation using Enhanced or Engineered Geothermal System(EGS) (공학적인 지열시스템(EGS)을 이용한 지열발전 기술)

  • Hahn, Jeong-Sang;Han, Hyuk-Sang
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2008.10a
    • /
    • pp.3-32
    • /
    • 2008
  • The potential deep geothermal resources span a wide range of heat sources from the earth, including not only the more easily developed, currently economic hydrothermal resources; but also the earth's deeper, stored thermal energy, which is present anywhere. At shallow depths of 3,000~10,000m, the coincidence of substantial amounts heat in hot rock, fluids that heat up while flowing through the rock and permeability of connected fractures can result in natural hot water reservoirs. Although conventional hydrothermal resources which contain sufficient fluids at high temperatures and geo-pressures are used effectively for both electric and nonelectric applications in the world, they are somewhat limited in their location and ultimate potential for supplying electricity. A large portion of the world's geothermal resource base consists of hot dry rock(HDR) with limited permeability and porosity, an inadquate recharge of fluids and/or insufficient water for heat transport. An alternative known as engineered or enhanced geothermal systems(EGS), to dependence on naturally occurring hydrothermal reservoirs involves human intervention to engineer hydrothermal reservoirs in hot rocks for commercial use. Therefore EGS resources are with enormous potential for primary energy recovery using an engineered heat mining technology, which is designed to extract and utilize the earth's stored inexthermal energy. Because EGS resources have a large potential for the long term, United States focused his effort to provide 100GW of 24-hour-a-day base load electric-generating capacity by 2050.

  • PDF

Continuation Time Integration (CTI)-Based Time Domain Simulation Analysis for Wind Farms (연속 시적분 (CTI) 기반 풍력발전단지 시모의 해석)

  • Cho, Sung-Koo;Song, Hwa-Chang;Lee, Jang-Ho
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.59 no.11
    • /
    • pp.1971-1979
    • /
    • 2010
  • As a result of increasing environmental concern, the penetration of renewable power on power systems is now increasing. Wind energy can be considered as the most economical energy sources to generate electricity without depletion of fossil fuel. To devise adequate control strategies for wind farm, time domain simulation analysis needs to be performed. This presents a continuation time integration (CTI)-based time domain simulation algorithm for wind farm with doubly fed asynchronous generator (DFAG) connected to the external power systems. This paper depicts how to time trajectories are traced using CTI-based time domain simulation. Also this paper describes the possibilities of hierachical control for wind farm output limitation, and the coordinated control has been designed by hierarchical control structured from central control level to wind farm control board and to an individual wind turbine level. Finally it shows an illustrative example of time domain simulation result with two test systems through case study.

Determining Appropriate Capacity on Installing Photovoltaic System at Deteriorated Educational Facilities

  • Lhee, Sang Choon;Choi, Young Joon;Choi, Yool
    • KIEAE Journal
    • /
    • v.14 no.3
    • /
    • pp.23-29
    • /
    • 2014
  • With high acknowledgements of environmental conservation and energy saving, many architectural technologies using renewable energy have been recently applied at buildings which take about 20% of total energy consumption. Among renewable energy sources, the photovoltaic is considered as the most highly potential one due to advantages of infiniteness and cleanliness. Also, projects to install renewable energy systems have been continuously performed at deteriorated educational facilities as energy efficient remodeling projects or green school projects by the Korean government. This paper proposes appropriate capacities by school level on installing photovoltaic systems at deteriorated school buildings, based on the balance of annual electricity power demand and supply between buildings and systems. Using the Visual DOE program and Merit program, the appropriate installment capacity of photovoltaic system turned out be 40kWp at elementary school building and 60kWp at middle and high ones. In addition, annual energy use proved to be reduced by 20.2% at elementary school, 26.9% at middle school, and 21.0% at high school by installing photovoltaic systems with the appropriate capacities.

Thermally reused solar energy harvesting using current mirror cells

  • Mostafa Noohi;Ali Mirvakili;Hadi Safdarkhani;Sayed Alireza Sadrossadat
    • ETRI Journal
    • /
    • v.45 no.3
    • /
    • pp.519-533
    • /
    • 2023
  • This paper implements a simultaneous solar and thermal energy harvesting system, as a hybrid energy harvesting (HEH) system, to convert ambient light into electrical energy through photovoltaic (PV) cells and heat absorbed in the body of PV cells. Indeed, a solar panel equipped with serially connected thermoelectric generators not only converts the incoming light into electricity but also takes advantage of heat emanating from the light. In a conventional HEH system, the diode block is used to provide the path for the input source with the highest value. In this scheme, at each time, only one source can be handled to generate its output, while other sources are blocked. To handle this challenge of combining resources in HEH systems, this paper proposes a method for collecting all incoming energies and conveying its summation to the load via the current mirror cells in an approach similar to the maximum power point tracking. This technique is implemented using off-the-shelf components. The measurement results show that the proposed method is a realistic approach for supplying electrical energy to wireless sensor nodes and low-power electronics.