• Title/Summary/Keyword: Software Test project

Search Result 104, Processing Time 0.026 seconds

Performance Comparison of DW System Tajo Based on Hadoop and Relational DBMS (하둡 기반 DW시스템 타조와 관계형 DBMS의 성능 비교)

  • Liu, Chen;Ko, Junghyun;Yeo, Jeongmo
    • KIPS Transactions on Software and Data Engineering
    • /
    • v.3 no.9
    • /
    • pp.349-354
    • /
    • 2014
  • Since Hadoop which is the Big-data processing platform was announced, SQL-on-Hadoop is the spotlight as the technique to analyze data using SQL on Hadoop. Tajo created by Korean programmers has recently been promoted to Top-Level-Project status by the Apache in April and has been paid attention all around world. Despite a sensible change caused by Hadoop's appearance in DW market, researches of those performance is insufficient. Thus, this study has been conducted to help choose a DW solution based on SQL-on-Hadoop as progressing the test on comparison analysis of RDBMS and Tajo. It has shown that Tajo based on Hadoop is more superior than RDBMS if it is used with accurate strategy. In addition, open-source project Tajo is expected not only to achieve improvements in technique due to active participation of many developers but also to be in charge of an important role of DW in the filed of data analysis.

A Study on the Contribution Evaluation of Developer in Convergence Social App Manufacturing Platform (융복합 소셜 앱 제작 플랫폼에서 참여자의 기여도 평가 방법에 관한 연구)

  • Gu, Seokmo;Park, SeongIk;Park, KyungDong;Ahn, ByongSun;Kim, Yei-chang
    • Journal of Digital Convergence
    • /
    • v.13 no.9
    • /
    • pp.225-233
    • /
    • 2015
  • The convergence social app manufacturing platform for both demander and developer in worldwide provides a collective collaborative development approach. This platform can bring enhanced productivity with exchange of views among participants. If the assessment is not fair that many participants will leave the collective collaborative project. The previous studies verified the reliability of the evaluation based on statistical techniques. Because the previous studies did not consider the task performance of participants, do not reflect the feature of project tasks. So, the contribution scores of the participants can be distorted. In this study, we suggest the method for evaluating the development contributions value. This is considered the task performance of participants and involved the method of equitable and consistency peer assessment.

Soil Erosion Assessment Tool - Water Erosion Prediction Project (WEPP) (토양 침식 예측 모델 - Water Erosion Prediction Project (WEPP))

  • Kim, Min-Kyeong;Park, Seong-Jin;Choi, Chul-Man;Ko, Byong-Gu;Lee, Jong-Sik;Flanagan, D.C.
    • Korean Journal of Soil Science and Fertilizer
    • /
    • v.41 no.4
    • /
    • pp.235-238
    • /
    • 2008
  • The Water Erosion Prediction Project (WEPP) was initiated in August 1985 to develop new generation water erosion prediction technology for federal agencies involved in soil and water conservation and environmental planning and assessment. Developed by USDA-ARS as a replacement for empirical erosion prediction technologies, the WEPP model simulates many of the physical processes important in soil erosion, including infiltration, runoff, raindrop detachment, flow detachment, sediment transport, deposition, plant growth and residue decomposition. The WEPP included an extensive field experimental program conducted on cropland, rangeland, and disturbed forest sites to obtain data required to parameterize and test the model. A large team effort at numerous research locations, ARS laboratories, and cooperating land-grant universities was needed to develop this state-of-the-art simulation model. The WEPP model is used for hillslope applications or on small watersheds. Because it is physically based, the model has been successfully used in the evaluation of important natural resources issues throughout the United State and in several other countries. Recent model enhancements include a graphical Windows interface and integration of WEPP with GIS software. A combined wind and water erosion prediction system with easily accessible databases and a common interface is planned for the future.

FPGA Modem Platform Design for eHSPA and Its Regularized Verification Methodology (eHSPA 규격을 만족하는 FPGA모뎀 플랫폼 설계 및 검증기법)

  • Kwon, Hyun-Il;Kim, Kyung-Ho;Lee, Chung-Yong
    • Journal of the Institute of Electronics Engineers of Korea SD
    • /
    • v.46 no.2
    • /
    • pp.24-30
    • /
    • 2009
  • In this paper, the FPGA modem platform complying with 3GPP Release 7 eHSPA specifications and its regularized verification flow are proposed. The FFGA platform consists of modem board supporting physical layer requirements, MCU and DSP core embedded control board to drive the modem board, and peripheral boards for RF interfacing and various equipment interfaces. On the other hand, the proposed verification flow has been regularized into three categories according to the correlation degrees of hardware-software inter-operation, such as simple function test, scenario test call processing and system-level performance test. When it comes to real implementations, the emulation verification strategy for low power mobile SoC is also introduced.

Development of Awarding System for Construction Contractors in Gaza Strip Using Artificial Neural Network (ANN)

  • El-Sawalhi, Nabil;Hajar, Yousef Abu
    • Journal of Construction Engineering and Project Management
    • /
    • v.6 no.3
    • /
    • pp.1-7
    • /
    • 2016
  • The purpose of this paper is to develop a model for selecting the best contractor in the Gaza Strip using the Artificial Neural Network (ANN). The contractor's selection methods and criteria were identified using a field survey. Fifty four engineers were asked to fill a questionnaire that covers factors related to the selection criteria of contractors practiced in Gaza Strip. The results shows that the dominant part of respondents (91%) confirmed that the current awarding method "the lowest bid price" is considered one of the major problems of the construction sector, "award the bid to the highest weight after combination of the technical and financial scores" represented 50% of the respondents. The criteria weights were determined based on Relative Importance Index (RII. Ninety-one tenders(13 projects) were used to train and test the ANN model after re-evaluating the contractors depend on the weights of factors to select the best contractor who achieves the highest score. Neurosolution software was used to train the models. The results of the trained models indicated that neural network reasonably succeeded in selection the best contractor with 95.96% accuracy. The performed sensitivity analysis showed that the profitability and capital of company are the most influential parameters in selection contractors. This model gives chance to the owner to be more accurate in selecting the most appropriate contractor.

Formal Validation Method and Tools for French Computerized Railway Interlocking Systems

  • Antoni, Marc
    • International Journal of Railway
    • /
    • v.2 no.3
    • /
    • pp.99-106
    • /
    • 2009
  • Checks and tests before putting safety facilities into service as well as the results of these tests are essential, time consuming and may show great variations between each other. Economic constraints and the increasing complexity associated with the development of computerized tools tend to limit the capacity of the classic approval process (manual or automatic). A reduction of the validation cover rate could result in practice. This is not compatible with the French national plan to renew the interlocking systems of the national network. The method and the tool presented in this paper makes it possible to formally validate new computerized systems or evolutions of existing French interlocking systems with real-time functional interpreted Petri nets. The aim of our project is to provide SNCF with a method for the formal validation of French interlocking systems. A formal proof method by assertion, which is applicable to industrial automation equipment such as interlocking systems, and which covers equally the specification and its real software implementation, is presented in this paper. With the proposed method we completely verify that the system follows all safety properties at all times and does not show superfluous conditions: it replaces all the indoor checks (not the outdoor checks). The advantages expected are a significant reduction of testing time and of the related costs, an increase of the test coverage rate, an answer to the new demand of railway infrastructure maintenance engineering to modify and validate computerized interlocking systems. Formal methods mastery by infrastructure engineers are surely a key to prove that more safety is not necessarily more expensive.

  • PDF

A Study for Defense Acquisition System Improvement (국방무기체계 획득절차 발전방향 - 미국 국방획득절차 개선노력을 중심으로 -)

  • Go, Sim-Jae
    • Journal of the military operations research society of Korea
    • /
    • v.31 no.2
    • /
    • pp.86-104
    • /
    • 2005
  • During the 'Cold War', DoD had focused on the high performance and timely acquisition which enabled quick field out the superior weapons than the enemy regardless of acquisition cost. But, after the cold war, the focus has been changed to the 'cost effective acquisition' of weapon systems because of tremendous investment cost & economic theory. The U.S. DoD has been tried to make 'the most effective acquisition system'(AR, Acquisition Reform) from mid-80's with their enough experienced program data, and as a result, they had launched the new acquisition procedure - DoD 5000 series - in 1996. DoD is continuously doing the study and making several improvements on the procedure after it had been once announced. On Oct 30. 2002, DoD noticed that they cancelled the DoD 5000 series documents(5000.1, 5000.2, 5000.2-R) and 5000.2-R will be reissued as a guide. The most recent version which focused on 1) evolutionary acquisition and spiral development, 2) procedure for future technology systems including software and IT, 3) supplement on the area of efficiency, flexibility, creativity and innovation of old system was issued by May 12. 2003. This article suggests a 'good idea' based on the reviewing of these DoD efforts for our defense acquisition regulation and procedure to go. It includes the CAIV concept application, IPT utilization, T&E method, cost or price based contract etc-all for the effective acquisition.

Mechanized tunnels lining prefabricated segments production methods

  • Elaheh Banihashemigargari;Amir H. Rezaeifarei
    • Geomechanics and Engineering
    • /
    • v.32 no.5
    • /
    • pp.503-512
    • /
    • 2023
  • In tunneling projects, a significant part of the costs is spent on segment production. By more economically producing, the cost of tunnel construction can be greatly reduced, especially in long and large-diameter tunnels. In the present study, the effect of using the Carousel method in the improvement of the production system performance compared to the conventional Static system has been studied. To carry out the research, a quantitative comparison of cost and production time was carried out for two production methods using the available documentation. The opinions of experts have been obtained using questionnaires and qualitative comparison of cost, time and production quality was done by implementation of statistical analysis. The SPSS software and the univariate t-test were used to analyze the questionnaires. According to the results of statistical analysis with SPSS, the use of the Carousel method will reduce production time and costs along with increasing manufacturing quality. According to the documentation analysis, the Carousel method reduces the cost of production by almost 30% and leads to a reduction of the production time to approximately 40% of the Static moulds system. The Carousel method has a higher production rate, efficiency, and better performance. Research into quantifying the benefits of Carousel method in the production system performance is very limited. This comparison is based on real information from the under construction Tabriz Metro project. This article can be very helpful in choosing the best production method.

BIM-BASED PLANNING OF TEMPORARY FACILITIES FOR CONCRETE CONSTRUCTION

  • Kyungki Kim;Jochen Teizer
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.1-6
    • /
    • 2013
  • Concrete construction requires utilization of many temporary facilities such as formwork, shoring, and scaffolding. Appropriate use of these temporary facilities greatly impacts the quality, cost, schedule, and safety of concrete construction. The current practice in design and planning of temporary facilities is often manual, error-prone, and re-active based on construction site layout, status, and progress in the field. Early design and planning of temporary facilities for concrete construction using Building Information Modeling (BIM) technology offers a potential solution. Although some commercially-available software exists that assists in the generation of temporary facility designs, the construction industry lacks tools that support detailed planning and design of many other temporary facilities. This research presents our early work in automating the design and planning of temporary facilities utilizing BIM. Algorithms were developed to automatically assess geometric conditions of work space to detect required temporary facilities and design them. The proposed methodology was implemented in a test model. By automatically incorporating temporary facilities into BIM, more realistic construction models can be created with less effort and errors. Temporary facilities-loaded models can finally be used for communication, bill of materials, scheduling, etc. and as a benchmark for field installation of temporary formwork, shoring, and scaffolding systems.

  • PDF

A study on decision making system in library management with an analysis on the case study of university library in Seoul (도서관경영에 있어서 의사결정시스템에 관한 연구)

  • Lee Woo Bum
    • Journal of the Korean Society for Library and Information Science
    • /
    • v.20
    • /
    • pp.163-222
    • /
    • 1991
  • This dissertation are studying the conceptual structure of decision making situation in libraries, by analyzing the library function, decision makings of library and then seeking economic and efficient alternative decision making by programming the· decision making situations, and finally, introducing how to apply management information system or decision making support system. For this purpose, in order to analyzing necessary factors for the decision making system, the questionnaire used Lickert method were distributed to 400 librarians of 36 universities in Seoul by means of mail. 193 librarians, $48\%$ of the questionnaire, are returned are studied by using 'SYSTAT' statistical software to figure out the factors of the decision making system. This dissertation was put six hypotheses and tested with the returned questionnaire. The following five result can be asserted. First, to the higher degree of the librarians' participation in the important library decision makings, the quality of formal library services are improved regardless of seniority of the work. Secondly, the t-test results show that all of t-test scores of seniority of the work, educational background, and responsibilities of the work are exceeding significant level and perception of decision making was proved to be different depending on seniority of the work, educational background, and responsibilities of the work in libraries. Thirdly, as the results of factor af factor analysis, the encouragement on participation in the library academic activities, the extent to get useful information about performances of library and the improvements of library works were grouped by similar posibilities of distribution and therfore the academic activities, the collection of information and the improvement of library performances is proved to be interrelational each other. Fourthly, the fifth hypothesis of the close relationship between the decision making situation and types of advisor by it was more or less interrelational, but their relationship was not seen some significancies. Lastly, as the dynamic organization of library management forming a special commitee or a project team with librarian can improve the extent and quality of the librarian's participation in the decision making of library works, and thus library will become to performance more rational and effective library management.

  • PDF